Velegol v. Division of Highways

24 Ct. Cl. 128
CourtWest Virginia Court of Claims
DecidedMay 31, 2002
DocketCC-99-244
StatusPublished

This text of 24 Ct. Cl. 128 (Velegol v. Division of Highways) is published on Counsel Stack Legal Research, covering West Virginia Court of Claims primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Velegol v. Division of Highways, 24 Ct. Cl. 128 (W. Va. Super. Ct. 2002).

Opinion

PER CURIAM:

Claimants brought this action for damage to their well which they allege was caused by respondent’s negligent drilling of core borings during a construction project on Route 2 near Colliers in Brooke County. The Court is of the opinion to deny this claim for the reasons set forth more fully below.

The incident giving rise to this claim allegedly occurred sometime in mid-January 1999. A core boring project being performed by HDR, an engineering firm with which respondent had a contract, began in late December or early January of 1998. The core borings were necessary for respondent to design a “cut slope” along Route 2 in Brooke County as part of a road widening project to widen Route 2 from a two-lane highway to a four-lane highway. Claimants’ home is located on a hillside above the Ohio River in Brooke County on a 250 acre farm. Claimants have a 3,000 foot property line that is adjacent to the east boundary of State Route 2. Claimant David A. Velegol had the well at issue drilled in 1971 at about the same time he had the house built in which claimants currently reside. The well had a sixteen gallon per minute one and one-half horsepower pump installed at the time it was drilled and it [129]*129was the same pump still in use until the incident at issue. The well was 177 feet deep. At the bottom of the well, there was a storage capacity of twenty feet. The pump was located approximately six feet off the bottom of the well so it could avoid any sediment that may fall there. An aunt and uncle live within one hundred feet of claimants’ home and they are also provided water by this well. According to Mr. Velegol’s testimony, the quantity of the well water prior to this incident was very stable. However, on January 23, 1999, claimants first noticed that they had lost their water. Mr. Velegol testified that he turned on the spigot and had absolutely no running water. He had not noticed any problems with the water flow prior to January 23, 1999. According to Mr. Velegol, the water flow on January 22, 1999 , was perfect. He stated that he went through a routine series of diagnostic tests to determine the problem. He ruled out a blown fuse, pump failure, electrical relay problems, or a break in the lines. Fie had just put in new heavy duty plastic pipe and he was certain that it was not a break in the line.

Thereafter, claimants attempted to reestablish water from the existing well by extending it deeper. Claimants hired an individual to drill to a deeper level in an attempt to establish water. However, claimants were unable to reestablish water and after one week of drilling they decided it was impractical to continue this effort and chose a different location to drill a new well. Claimants had a new well drilled in late February or early March 1999. During the time that claimants did not have the use of their well, they purchased a 1800-gallon water tank to transfer the water into their system for use by themselves and their aunt and uncle until water from the new well was available.

It is claimants’ contention that respondent negligently conducted the drilling of core borings during its widening project of Route 2 near their home. Claimants contend that the core boring project was the proximate cause of the loss of the water flow from their well. As a result of respondent’s alleged negligence, claimants seek an award in the amount of $11,030.01, plus interest, which represents the cost of providing water while the new well was being dug, the cost of the new well, the cost of attempting to rehabilitate the old well, and landscaping for their yard .

Claimant David Velegol testified that he is a licensed professional engineer and that he has worked in the field of engineering for 38 years. Mr. Velegol has a masters degree in mechanical engineering and has specialized in the area of “fluid flow and heat transfer”. Mr. Velegol’s theory as to the cause of the loss of his well water is that during the drilling of the core borings, the drilling ruptured a major underground artery in the aquifer that was supplying water to his home.

Respondent’s position is that the project for drilling core borings did not cause or contribute to the damage to the claimants’ well in any manner.

Robert L. Dodson, III, was employed by HDR Engineering as the project geotechnical engineer for respondent’s core boring project which is at issue in this claim. Mr. Dodson testified that there were a total of twenty three core drillings performed. Borings one through twelve were performed on the south side of the valley. Borings thirteen through twenty-one were performed north of the valley. There were two supplemental holes drilled on each side of the valley in the same vicinity as the others. The closest core boring hole to claimants’ property was hole number sixteen which was 640 feet away from claimants’ well. Core boring hole number fifteen was 710 feet away from the well. The equipment used in drilling the borings consisted of “track and rubber tire mounted drill rigs” that were described as looking similar to all-terrain vehicles and approximately the size of a pick-up truck. Mr. Dodson testified that the drilling machine that punched holes into rock surface [130]*130was approximately three inches in diameter. The drilling machine used to punch holes into the soil was approximately six to eight inches in diameter.

According to Mr. Dodson, the core borings showed the makeup of the strata below the surface of the ground. The strata near the location of the claimants’ well consisted of approximately ten to twenty feet of soil, minor layers of bedded shale and sandstone, then a major unit of sandstone 90 to 110 feet thick. Finally, there is a sequence of shales and claystone. The major unit of sandstone which is 90 to 100 feet thick is referred to as the Morgantown Grafton sandstone. Mr. Dodson stated that sandstone is considered to be a good water-bearing formation, and it is from this unit that most of the wells in the area including the claimants get their water. Mr. Dodson also testified that the Morgantown Grafton sandstone is the aquifer for the entire area.

In response to the claimants’ initial complaint of the loss of water flow from the well, the respondent sent Mr. Dodson to investigate the claimants’ well and determine if the core borings were the proximate cause of the loss of water flow from claimants’ well. As a result of this investigation, the respondent reached a conclusion by approximately January 28, 1999 that “while possible, it’s not probable that any of the core borings affected the water level or quality in the Velegol well.” Mr. Dodson testified that since then he has obtained more information and it is now his professional opinion that it is “highly unlikely” that any of the core borings affected the water level or quality of the Velegol well. Mr. Dodson also testified that during his investigation he discovered that there are two homes with wells that are just a few hundred feet from the core borings and that none of the residents had any trouble with their wells.

Mr. Dodson conducted investigations in the late summer of 1999 and in November of 1999 regarding the causation of the loss of the claimants’ well water. This “well study” report was prepared by Mr. Dodson for the respondent in May of 2000. It compared and contrasted the water production of claimants’ “old” well that was allegedly damaged and the new well that they were forced to drill.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Commercial Union Insurance v. Department of Highways
16 Ct. Cl. 84 (West Virginia Court of Claims, 1986)
Phares v. Division of Highways
21 Ct. Cl. 92 (West Virginia Court of Claims, 1996)
Stephenson v. Division of Highways
22 Ct. Cl. 98 (West Virginia Court of Claims, 1998)

Cite This Page — Counsel Stack

Bluebook (online)
24 Ct. Cl. 128, Counsel Stack Legal Research, https://law.counselstack.com/opinion/velegol-v-division-of-highways-wvctcl-2002.