United States Gypsum Co. v. Birdsboro Steel Foundry & MacHine Co.

52 A.2d 344, 160 Pa. Super. 548, 1947 Pa. Super. LEXIS 310
CourtSuperior Court of Pennsylvania
DecidedMarch 12, 1947
DocketAppeal, 85
StatusPublished
Cited by16 cases

This text of 52 A.2d 344 (United States Gypsum Co. v. Birdsboro Steel Foundry & MacHine Co.) is published on Counsel Stack Legal Research, covering Superior Court of Pennsylvania primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
United States Gypsum Co. v. Birdsboro Steel Foundry & MacHine Co., 52 A.2d 344, 160 Pa. Super. 548, 1947 Pa. Super. LEXIS 310 (Pa. Ct. App. 1947).

Opinion

Opinion by

Rhodes, P. J.,

This case arises out of the purchase of a hydraulic press by plaintiff from defendant. Plaintiff brought an action in assumpsit to recover damages for an alleged breach of an implied warranty of fitness for a particular purpose, and of certain express warranties and guarantees. Defendant obtained a judgment on its counterclaim.

We briefly recite the history of the proceedings prior to the argument in this court. Defendant filed a statutory demurrer to plaintiff’s statement, asserting that, as a matter of law, there was, under the facts alleged in plaintiff’s statement, no implied warranty of fitness for a particular purpose because a definitely described hydraulic press was ordered by plaintiff, and no breach of express warranties was shown. The court below, in an opinion by Judge Oliver, held that plaintiff’s allegations set forth a good cause of action on implied warranty of fitness for a particular purpose, and on certain express warranties. The statutory demurrer was overruled, and defendant was required to answer on the merits.

The contract price for the hydraulic press was $47,000. Plaintiff in its action sought to recover the cost of repairs and new parts in excess of $65,000. Defendant filed an affidavit of defense to the merits, and a counterclaim for parts and labor furnished in the sum of $6,039.89.

The case was tried before Judge Levinthal, sitting without a jury. The trial judge made extensive findings *550 of fact and conclusions of law, and lield that plaintiff was not entitled to recover for the alleged violation or breach of any implied or express warranty pertaining to the press. The trial judge accordingly found for the defendant in the amount of $939.89, representing cost of services furnished by defendant to plaintiff in installing certain new parts. Damages were assessed in the amount of $1,291.05, and judgment entered for defendant. Plaintiff’s exceptions were dismissed by the court in banc. Plaintiff appealed to the Supreme Court, which in an opinion by Chief Justice Maxey (United States Gypsum Company v. Birdsboro Steel Foundry and Machine Company, 355 Pa. 653, 50 A. 2d 666), held that the amount of the judgment on defendant’s counterclaim was conclusive of the amount involved, and fixed the jurisdiction in the Superior Court; accordingly the appeal was remitted to this court.

Appellant’s principal contention in this court, indicated by its statement of questions involved, concerns the burden of proof in cases of implied warranty. It urges upon us that it merely had to establish that the press failed to work; and that the court below erred on the question of burden of proof in that it required appellant to show not only (1) that the press failed, but also (2) that the failure was due to appellee’s faulty design, and (3) that such failure was not due to appellant’s faulty operation of the press.

Certain material facts appearing in the record are not questioned. Appellant desired to obtain a hydraulic press capable of exerting a pressure up to nine thousand tons on single mats of asbestos and cement, a feet 6 inches wide by 12 feet 6 inches long, for the purpose of manufacturing asbestos and cement shingles and siding for houses and other structures; and it prepared written general specifications of its requirements with respect to such a press, and sent copies thereof to a number of hydraulic press manufacturers, including appellee, inviting bids for the designing, manufacture, and installa *551 tion of a press to be built in accordance with tbe said specifications. The press was to operate with an opening of 3 inches between the upper and lower steel plates or platens; the time of pressing was to be 30 seconds, reduced to 15 seconds with the aid of additional pumps.

In a letter dated June 27, 1936, appellee agreed to furnish appellant the 9,000-ton hydraulic press equipment. This letter, accepted by appellant, formed the written contract between the parties, and expressly guaranteed that the press would “be suitable to apply on a sheet 4'-6" wide by 12'-6" long, a total uniformly distributed pressure of 9,000 tons”; and that the equipment was “further guaranteed with proper care of valves and of contacts and other electrical devices to function continuously in the manner” described in the proposal, that is, to open to a 3-inch clearance and press a sheet in a total cycle period of not more than 52% seconds, reduced by the addition of a pump to 37% seconds. The agreement also contained an express guaranty “against defects in materials and workmanship under normal use and service”; but this was limited to replacement of defective parts during a period of one year from the date of shipment.

The press was installed in appellant’s plant, and operation was commenced in February, 1937. Except for minor repairs and an incident in August, 1937, when a corner of a sheet was folded in pressing, the press operated properly for 22 months, or until December 19, 1938, when one of the three main pressure cylinders cracked. Appellant procured a replacement cylinder from appellee, which was of slightly heavier construction than the original. On February 21,1939, a second cylinder cracked, and thereafter main cylinders broke in June, July, August, and November of 1940.

On September 28, 1939, one of the six large bolts or columns broke, and upon examination all were found unsafe and had to be replaced. New bolts were ordered from and supplied by appellee. Thereafter, bolts broke in January and March, 1940, and in March of 1941.

*552 Appellant purchased and paid for replacement of cylinders and bolts or columns, mostly from appellee, but in some instances from other manufacturers. Appellant paid appellee for some of the replacements furnished ; as to others the trial judge found that appellee, by reason of certain letters it wrote after the breakage, agreed to furnish them without cost to appellant.

As previously stated, however, the trial judge refused to allow appellant to recover the cost of the replacements and the repairs to the press, and this he did on the ground that appellant had failed to prove to his satisfaction by a preponderance of the evidence a cause of action.

Appellee introduced in evidence the deposition of one Dudley F. Davenport who had been foreman on the press for appellant in 1987 during one of the eight-hour shifts. This witness stated that in August, 1937, the corner, 4 inches by 7 inches, of one sheet was folded in the press, causing damage which was thereafter repaired by appellant without notice to appellee. This witness did not actually see the pressing of the folded sheet, but he did see it after it was pressed; and he also observed the indentation in the lower platen.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Larry R. Moore v. Kulicke & Soffa Industries, Inc
318 F.3d 561 (Third Circuit, 2003)
Zubris v. Pennsylvania Assigned Claims Plan
467 A.2d 1139 (Supreme Court of Pennsylvania, 1983)
Thomas v. Allegheny & Eastern Coal Co.
455 A.2d 637 (Superior Court of Pennsylvania, 1982)
Vandenberg v. Siter
204 A.2d 494 (Superior Court of Pennsylvania, 1964)
Hosfeld Estate
194 A.2d 158 (Supreme Court of Pennsylvania, 1963)
Morse-Boulger Destructor Co. v. Mellon-Stuart Co.
138 A.2d 152 (Superior Court of Pennsylvania, 1958)
National Container Corp. v. Regal Corrugated Box Co.
119 A.2d 270 (Supreme Court of Pennsylvania, 1956)
Smith v. Piper Aircraft Corp.
18 F.R.D. 169 (M.D. Pennsylvania, 1955)
Ricci v. Barscheski
116 A.2d 273 (Superior Court of Pennsylvania, 1955)
Victorson v. Albert M. Green Hosiery Mills, Inc.
202 F.2d 717 (Third Circuit, 1953)
Schmidt v. Martz
55 A.2d 588 (Superior Court of Pennsylvania, 1947)
Cost v. Dean
54 A.2d 70 (Superior Court of Pennsylvania, 1947)

Cite This Page — Counsel Stack

Bluebook (online)
52 A.2d 344, 160 Pa. Super. 548, 1947 Pa. Super. LEXIS 310, Counsel Stack Legal Research, https://law.counselstack.com/opinion/united-states-gypsum-co-v-birdsboro-steel-foundry-machine-co-pasuperct-1947.