Union Water Power Co. v. Pingree

40 A. 333, 91 Me. 440, 1898 Me. LEXIS 51
CourtSupreme Judicial Court of Maine
DecidedApril 21, 1898
StatusPublished

This text of 40 A. 333 (Union Water Power Co. v. Pingree) is published on Counsel Stack Legal Research, covering Supreme Judicial Court of Maine primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Union Water Power Co. v. Pingree, 40 A. 333, 91 Me. 440, 1898 Me. LEXIS 51 (Me. 1898).

Opinion

Peters, C. J.

In 1890 the defendants simultaneously obtained from the Franklin Company, a land company, a lease of a lot of land in Lewiston upon which to establish a mill plant for the purpose of manufacturing lumber, and from the Union Water Power Company, a water company, a lease of a certain amount of water privilege sufficient to furnish power with which to carry on the contemplated manufacturing. The leases were for ten years, though that from the Franklin company was sooner terminable upon certain conditions, and that from the Water Power company could be terminated by the defendants at any time when the other lease might from any cause come to an end. The plaintiffs leased to the defendants “the right, privilege and easement of taking, drawing and using from the cross-canal No. 1, so-called, of the Water Power Company, in said Lewiston, through the flume now existing on the northerly side of said cross-canal No. 1, a quantity of water not exceeding one hundred horse-power during eveiy twelve hours of each and every secular day for running machinery and manufacturing purposes upon the premises known as the Mill lot, and leased by the said Pingree & Co. of the Franklin company . . . .” “Also the water-wheels and shafting connected with said flume, and the buildings over tbe same. Said flume, water-wheels, shafting and buildings to be taken by the said Pingree & Co. as they now exist.”

The defendants at once entered into possession of the leased premises and commenced to make changes and improvements therein until in April, 1893, to use the words of plaintiffs’ brief, they had “entirely reconstructed the appliances and structures used for conveying the water from the canal to the wheels and for the transmission of the power from the wheels to their factory on the Mill lot.” To compose some differences that had meanwhile arisen between the parties, the defendants, for the sum of $3000.00, [445]*445in April, 1898, made to the plaintiffs a written sale of these improvements describing the same thus: “The new iron feeder connecting the forbay of the Union Water Power Company on Canal No. One in said Lewiston with the Wheel-house described in the lease from said Union Water Power Company to said R. C. Pingree &'Company, which feeder was put in by said R. C. Pingree & Company in 1892. Also the new wheel, gears, boxes, shafting and all other improvements put in said wheel-house by said Pingree & Co. in 1890 as far as the line of the Union Water Power Company land. Also the regulator attached to said wheel and all the pulleys, gearing and appliances connected with- the wheel and necessary for the regulator’s proper use and operation and which were put in by said Pingree & Company in 1890.”

This sale was coupled with a contract between the parties by which it was agreed, among other things, that, in addition to the rent specified as payable under the terms of the lease, the defendants should annually pay another sum which would be equivalent to interest on $3000.00, for the use and enjoyment of the purchased • property. In the same agreement it was mutually stipulated that Pingree & Company (defendants) “should make all ordinary repairs upon the machinery and property above described at their own cost and expense, and that the plaintiff company should make all renewals and extraordinary repairs” on the same.

January 29, 1896, the factory and entire manufacturing plant of defendants on the Mill lot were lost by fire, and “ practically it may be said that all the appliances and structures for the transmission of power from the wheel to their factory were also destroyed.” The loss on the fixtures owned by plaintiffs, but used by the defendants, is computed by tbe counsel for plaintiffs at six hundred dollars, the counsel on the other side estimating such loss at a considerably larger sum. The defendants did not rebuild their factory, nor make any use of the water power after the fire, but did some manufacturing on the premises for a while afterwards by the use of some steam power borrowed for the purpose. Nor did the plaintiffs ever make the renewals or extraordinary repairs called for by the agreement before named, and without such the defendants [446]*446could make no use of any water power on their property. The lease from the Franklin Company became terminated in the season of 1896, and the properties covered by the two leases were abandoned by the defendants before the close of that year. Thereupon the plaintiffs, by their writ dated November 20, 1896, sue for the recovery of a “water-rent” for nine mouths ending November 1, 1896, amounting to about $600.00, and for one year’s rent or interest on the $3000.00, making $160.00 besides.

The defendants contend that they have been absolved from all liability for the payment of rent. There is certainly in equity and Justice much reason why they should not be responsible for rent, having had no beneficial use of the leased property after the fire. A possession of the water-power by the lessees before permanent repairs were made would be an impossibility, and it may well be presumed that that portion ■ of the water which the defendants ceased to receive went for the plaintiffs’ benefit through other distributions from the same canal. Closing the flume appropriated for the defendants’ use would as a matter of course create more pressure in other flumes in the same dam or canal.

There cannot be any doubt that the two papers, lease and agreement, are to be construed as' dependent parts of one contract. They together became an entirety. There is a clause in the agreement which prescribes that the lease shall remain in full force and effect, “except so far as any provisions thereof may be inconsistent with the agreement.”

The plaintiffs, in excuse for their omission to restore the premises to the condition in which they stood before the fire, assert that they were not requested by the defendants to rebuild. Neither were they notified by them not to rebuild. It was true, no doubt, that the lessees preferred to be released from tbeir covenants unless an extension of their leases could be effected with both companies. And it is also just as evident that the plaintiffs were not inclined to incur the cost of making the extraordinary repairs, unless the lessees obtained an extension of the lease from the Franklin Company, lest by the termination of that lease their own lease might be prematurely ended, and they thereby, if restoration were [447]*447executed, have an expensive and to them useless property on their hands. The plain truth is that it appeared to be for the interest of both the lessors and lessees that the lease be at once terminated and the premises surrendered. But it by no- means follows, and there is nothing to be seen indicating it, that the defendants would not have succeeded in making the property earn the rent resting on it, had the work of reconstruction been seasonably executed by the plaintiffs. There are also clauses in the lease, not before noticed, which are illustrative of this equitable view of the respective rights of these pai’ties. One such clause is the provision that, if the lessors fail or are unable to furnish and supply the quantity of water needed by the lessees for running their machinery and for their manufacturing purposes, not exceeding one hundred horsepower, then a just and proportional part of the rent reserved shall be abated by the lessors.

Free access — add to your briefcase to read the full text and ask questions with AI

Cite This Page — Counsel Stack

Bluebook (online)
40 A. 333, 91 Me. 440, 1898 Me. LEXIS 51, Counsel Stack Legal Research, https://law.counselstack.com/opinion/union-water-power-co-v-pingree-me-1898.