Town of Reasnor v. Pyland Construction Co.

229 N.W.2d 269
CourtSupreme Court of Iowa
DecidedMay 21, 1975
Docket2-56509
StatusPublished
Cited by9 cases

This text of 229 N.W.2d 269 (Town of Reasnor v. Pyland Construction Co.) is published on Counsel Stack Legal Research, covering Supreme Court of Iowa primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Town of Reasnor v. Pyland Construction Co., 229 N.W.2d 269 (iowa 1975).

Opinion

HARRIS, Justice.

This dispute stems from construction of a sanitary distribution system for the plaintiff Town of Reasnor, Iowa. The town brought this action on the claim two companies were negligent in performing construction contracts. A jury verdict in favor of defendants removed claims of specific negligence from the case. This appeal challenges the trial court’s refusal to submit for the jury’s consideration the town’s alternative claims under the doctrine of res ipsa loquitur. We affirm the trial court.

In February of 1968 the Town of Reasnor entered into contracts with Pyland Construction Company (Pyland) to construct sewer mains and manholes. At the same time the town contracted with Rozendaal Construction Company (Rozendaal) to construct a sewage lagoon, lift station and force main connecting its construction with the rest of the sewer system.

Pyland finished its work on June 10,1968. Rozendaal completed its part of the contract November 22, 1968. The entire system was inspected and accepted by the town and placed in operation in November 1968.

*271 Five months later problems developed in the system. The rate of flow at the lift station began to increase until it was running continuously. Quantities of sand began to appear in the sewage lagoon. The problem was located around Manhole Number 1. Under the arrangement Pyland was responsible for building the manholes. Manhole Number 1 was the point at which Rozendaal’s work was to “tie in” with the rest of the sewage system constructed by Pyland.

It appears without dispute that when Py-land was working in this particular area the water table was much higher than expected. The presence of this water required a deviation from the plans and specifications prepared by the town engineer. The manhole and sewer pipe were placed at the spot called for in the plans. The variation made by Pyland was to dig six to eight inches further down than called for and to fill the increased excavation with washed rock to the proper level. The pipe was placed on the crushed rock. The plans called for a dry excavation with a pipe bedded in a trench bottom, excavated and shaped to fit the pipe. When Pyland finished its work on June 10 all excavations were filled and covered.

Under the plans Rozendaal was to build the lift station approximately ten feet south of Manhole Number 1 and at a somewhat lower elevation. In order to “tie in” with the previously completed Pyland work at Manhole Number 1, Rozendaal necessarily had to uncover the earth to a point where contact could be made with the previous construction. When Rozendaal dug to reach the foundation of Manhole Number 1 they encountered water before reaching the bottom. Before completing the “tie in” Rozendaal was required to use pumps, metal sheeting and a well point system to de-water the area so they could work on it.

The problems which later developed resulted from the fact Manhole Number 1 had sunk approximately a foot and the sewer pipe was broken at the first joint, about five feet north of the manhole.

When the defect was discovered the town served demands upon Pyland and Rozendaal and their bonding companies to remedy the defect. Upon refusal to comply, another construction company was hired to do the work.

The remedy employed was a further, more extensive, variation from the original plans. The manhole was moved from the point ten feet from the lift station to a site 80 feet away. Cast iron pipe, rather than clay pipe, was used. Substantial quantities of rock were added to the area around the manhole.

The town brought this action to recover the amount paid the third construction company for the remedy described. The suit was tried on a theory of tort arising from violation of a contractual duty as contemplated in Giarratano v. Weitz Co., Inc., 259 Iowa 1292, 1305, 147 N.W.2d 824, 832.

It was claimed each defendant contractor performed faulty or poor workmanship in connection with the project. At trial the town offered evidence which they argued indicated such faulty or poor workmanship. The evidence and the arguments the town developed from it were quite explicit.

The case against Pyland stemmed from the claim Pyland mishandled the water problem. Pyland’s foreman testified his use of crushed rock at Manhole Number 1 and for 60 to 70 feet north was proper and “the only way to do it.” The town’s engineer disagreed. He agreed his plan for laying the pipe could not be accomplished underwater but believed a change in specification should have been sought from him when water was encountered. He believed five or six alternatives would have then been available. He testified he was unaware any variation had been necessary or undertaken.

The case against Rozendaal stemmed from the claim a faulty seal was installed at the joint of the pipe and manhole or that the manhole was weakened or undermined when the lift station was constructed.

*272 The town engineer testified the failure of the system stemmed from one or some combination of three causes:

(1) A failure to follow adequately engineered and prescribed methods in installing Manhole Number 1 .and the tile pipe sections.

(2) A faulty seal at the joint of the pipe, or

(3) A weakening or undermining of Manhole Number 1 when the lift station was constructed.

By their verdict the jury rejected the town’s claim of specific negligence. No appeal has been taken from the jury verdict. Our consideration is limited to the town’s claim the theory of res ipsa loquitur should also have been submitted.

I. Our definition of res ipsa loqui-tur has been repeated many times. It is a rule of evidence not a statement of tort law. Wiles v. Myerly, 210 N.W.2d 619, 624 (Iowa 1973).

“Under this doctrine, where 1) injury is caused by an instrumentality under the exclusive control of defendant, and 2) the occurrence is such as in the ordinary course of things would not happen if reasonable care had been used, the happening of the injury permits but does not compel an inference defendant was negligent. (Authorities).

“The res ipsa theory does not raise any inference as to what did occasion the injury-causing event. If the necessary causal evidence is circumstantial, it must make plaintiffs’ theory not merely possible, but more probable than any other theory based on the evidence. (Authorities).

“It is not required for application of the doctrine to prove defendant had control of the instrumentality when the injury occurred. It is enough to show control at time of the alleged negligent act, provided plaintiff proves there was no change in condition of the instrumentality, and no intervening act, which could reasonably have caused the event resulting in the injury. (Authorities).” Palleson v. Jewell Cooperative Elevator, 219 N.W.2d 8, 13 (Iowa 1974).

The parties dispute whether exclusive control by defendants was shown. The town believes it was enough to show the successive exclusive possessions by the two defendant contractors.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Depositors Insurance v. Wal-Mart Stores, Inc.
506 F.3d 1092 (Eighth Circuit, 2007)
Novak Heating & Air Conditioning v. Carrier Corp.
622 N.W.2d 495 (Supreme Court of Iowa, 2001)
Brewster v. United States
860 F. Supp. 1377 (S.D. Iowa, 1994)
Mastland, Inc. v. Evans Furniture, Inc.
498 N.W.2d 682 (Supreme Court of Iowa, 1993)
Kusy v. K-Mart Apparel Fashion Corp.
681 P.2d 1232 (Utah Supreme Court, 1984)
Strick v. Stutsman
633 S.W.2d 148 (Missouri Court of Appeals, 1982)

Cite This Page — Counsel Stack

Bluebook (online)
229 N.W.2d 269, Counsel Stack Legal Research, https://law.counselstack.com/opinion/town-of-reasnor-v-pyland-construction-co-iowa-1975.