Town of Lisbon v. Counties of Yellow Medicine & Lac Qui Parle

172 N.W. 125, 142 Minn. 299, 1919 Minn. LEXIS 619
CourtSupreme Court of Minnesota
DecidedMay 2, 1919
DocketNo. 21,163
StatusPublished
Cited by5 cases

This text of 172 N.W. 125 (Town of Lisbon v. Counties of Yellow Medicine & Lac Qui Parle) is published on Counsel Stack Legal Research, covering Supreme Court of Minnesota primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Town of Lisbon v. Counties of Yellow Medicine & Lac Qui Parle, 172 N.W. 125, 142 Minn. 299, 1919 Minn. LEXIS 619 (Mich. 1919).

Opinion

QuiNN, J.

This drainage system consists of about 21 miles of open and many miles of tile work. The main line is an open ditch which crosses public highways in seven places in the town of Lisbon. The bottom thereof is eight feet wide, except at the highway between sections 25 and 26, where it is ten feet. Branch 4 crosses two highways and the bottom thereof is six feet wide. The viewers allowed the town, as damages on account of tliese crossings, from $200 to $350 each. The town, feeling aggrieved, served a demand for a jury to determine the same. The issue so raised came on for trial in January, 1918. The jury assessed the damages at the sum of $9,099. From an order denying its motion for a new trial the county appealed.

Upon the trial demandant offered in evidence the petition, engineer’s report and order establishing the ditch. Owing to a suggestion by the court that it was conceded that the ditch crossed the highways at the points in question, that demandant was entitled to damages and that the only question at issue was the amount, they were not received. G. P. Smith was then called as a witness by demandant, who testified that he was a civil engineer, and that he had checked over the plans for the ditch [301]*301with Mr. Norgaard, the official engineer who had prepared them. He then testified without objection as to the width, depth and length of the open work, that the same crossed the highways at the points in question, and gave his opinion as to the size, length of span, character and cost of the several bridges necessary. Under objection and exception he testified that a bridge between sections 29 and 32 should have a 16 foot span, 18 foot roadway, reinforced concrete abutments, steel beams and concrete deck and would cost $675.

Bernard Loftfield was then called as a witness by demandant who testified that he was a civil engineer; that he had never seen the plans nor specifications, but that he had heard the testimony of Mr. Smith; that he thought a 16 foot bridge would be sufficient to take care of the water on the line between sections 29 and 32, but that such ditches had to be cleaned, and that he would rather put the abutments 24 feet apart so that a dredge might pass through for such purpose. He then testified, without objection, that in his opinion the cost of such bridges, with abutments 24 to 26 feet apart and with three inch plank floors instead of concrete, would be $10,681 in the aggregate. He further testified that four-foot reinforced concrete culverts would, in his opinion, be sufficient to take care of the water at the several points under present conditions, that is, without any ditch being constructed; that the same would be permanent and cost not to exceed $175 to $190 each. He also gave testimony as to the value of the present bridges and culverts.

In submitting the issue of damages to the jury, the court dwelt at some length upon the opinion evidence given by the two engineers as to the ldnd and size of the bridges and the cost thereof, and then left it to the jury to determine, under all the facts and circumstances, what kind of bridges ought to be constructed and to decide which engineer’s bridge to adopt. We are unable to adopt this theory, even though the trial was along these lines. The official engineer in the drainage system, being ill, was not called as a witness, and it does not appear from the testimony what kind of bridges was provided for in the plans and sped-' fications or the estimated cost thereof.

The statute requires the engineer to make a correct survey of the line of the ditch, drain or watercourse from its source to its outlet, and make an itemized tabulation of the construction of all bridges or other eon-[302]*302struction work found necessary, together with the estimated cost thereof. G. S. 1913, § 5526. He shall also make a detailed and complete report of his doings, and submit therewith the necessary plans and specifications and a description of the land over which the ditch is surveyed. All plans, specifications, maps or profiles shall be made in duplicate and filed in the office of the clerk of the court. G. S. 1913, § 5527.

It was error to receive the testimony of the witness Smith over appellant’s objection as to the cost of a bridge which he deemed necessary on the line between sections 29 and 32. The kind and size of the bridges throughout should have been, and presumably were, provided for in the plans and specifications of the engineer, which must necessarily have been confirmed in the order establishing the ditch. This being true, all of the opinion testimony given by the engineers, as to the character or dimensions of the bridges, was immaterial. Nor was it a question for the jury to determine. The plans and specifications, after being confirmed by the court in the order establishing the ditch, become final and conclusive, unless modified or changed as provided by the statute.

The difficulty here involved grows out of what seems to have been a mutual error in arriving at the benefits and damages on account of the bridges provided for. While the drainage statute is somewhat complex, yet it provides for the appointment of three disinterested resident freeholders of the county as viewers to meet and prepare a tabular statement showing, as far as practicable, the names of the owners of each tract of land to be benefited or damaged by the construction of the proposed drainage system, and when any such system drains, either in whole or in part, any public highway, or benefits the same so that the roadbed or traveled track will be made better, the viewers shall estimate the benefits arising therefrom to such highway or roadbed and report the same as a part of such tabular statement. They shall also report as a part of such tabular statement the damages awarded to each town or municipality for injury to such highway or roadbed and from the construction and maintenance of any bridges, culverts or other works rendered necessary by the establishment of such system, stating the same separately. G. S. 1913, § 5529.

In arriving at the amount of benefits which a town charged with the maintenance of a public highway should be assessed, the viewers may [303]*303consider and determine, not only wbat benefits will be derived from the drainage of the highway, but as well the improvement or betterment of the same by reason of the construction of the bridges provided for in the engineer’s plans and specifications. If the construction of such bridges will constitute an improvement to the highway, roadbed or traveled track, or render the same more permanent, then the same should be considered a benefit to the extent of such betterment and assessed accordingly.

The damages which a town is entitled to on account of bridges in such drainage proceeding, is the cost of the construction and maintenance of the bridges provided for in the engineer’s report, less the value of the wreckage from the bridges to be replaced, such cost of construction and maintenance to be determined primarily by the viewers and finally, if demanded, by a jury. We know of no rule requiring a public drainage enterprise to pay a town or other municipality for bridges which are to be replaced, as contended for in the case at bar.

When a bridge is provided for in a highway, it becomes the duty of the town to construct the same within a reasonable time. If it fails so to do the county board may cause the same to be done and the cost thereof shall be deducted from the damages allowed such town, or collected as in the case of an assessment for benefits (G. S.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Minn. Dep't of Natural Res. v. Chippewa/Swift Joint Bd. of Commissioners
925 N.W.2d 244 (Supreme Court of Minnesota, 2019)
Nostdal v. County of Watonwan
22 N.W.2d 461 (Supreme Court of Minnesota, 1946)
Slosser v. Great Northern Railway Co.
16 N.W.2d 47 (Supreme Court of Minnesota, 1944)
In Re Judicial Ditch No. 24 Renville
200 N.W. 816 (Supreme Court of Minnesota, 1924)
Roseau County v. Township of Hereim
183 N.W. 518 (Supreme Court of Minnesota, 1921)

Cite This Page — Counsel Stack

Bluebook (online)
172 N.W. 125, 142 Minn. 299, 1919 Minn. LEXIS 619, Counsel Stack Legal Research, https://law.counselstack.com/opinion/town-of-lisbon-v-counties-of-yellow-medicine-lac-qui-parle-minn-1919.