¶1 This is an appeal from the trial of an action under the Model Toxics Control Act, chapter 70.105D RCW. The plaintiff, Taliesen Corporation, sought contribution for costs incurred in cleaning up petroleum contamination in a site being prepared for development of condominiums. With minor exceptions, we affirm the trial court’s many rulings.

FACTS

¶2 Taliesen sought contribution for over $600,000 in cleanup costs from Razore Land Company, owner of the property when leakage from an underground tank occurred; Golder Associates, Inc., an environmental consultant involved with the property during its ownership by three separate parties; and Donald B. Murphy Contractors, Inc., operator of the drill that pierced the underground storage tank. As a third party plaintiff, Razore sued Townhouse, L.L.C., and Trevor, L.L.C., another former owner of the property. After various motions for summary judgment and a lengthy bench trial, the result was a small judgment for Taliesen for cleanup costs and large awards of attorney fees for prevailing parties Taliesen, Murphy, and Townhouse. Numerous issues are raised in the various appeals and cross-appeals. All parties have filed appellate briefs.

¶3 According to unchallenged findings of fact, Razore owned the real property that is the subject of this action [113]*113between 1978 and 1995. The property is near the Convention Center in downtown Seattle. In 1986, First City, a now defunct company, began to redevelop property adjoining the north and east sides of the Razore-owned property. In 1989, First City hired Golder Associates, an environmental and geotechnical consulting firm, to design and supervise the construction of a temporary shoring wall for the foundation. First City’s general contractor hired Donald B. Murphy Contractors, a geotechnical construction company, to build the wall. Golder’s design called for long soil nails to be inserted at an angle into the face of the shoring wall. Because the shoring wall was just a few feet east of the Razore property, the soil nails would intrude across the border and under the Razore property.

¶4 Murphy began installing soil nails per Golder’s design in January 1989. In late January, the drillers encountered evidence of petroleum contamination along the Razore property’s eastern boundary. On February 15,1989, after the drillers drilled a borehole and removed the auger, Murphy and Golder personnel found dark grey and black soil with a petroleum odor. When Golder directed the drilling to continue, Murphy drilled another borehole for one of the soil nails and pierced an underground storage tank located on the Razore property. This event caused release of an unknown quantity of petroleum. The petroleum leaked and migrated down through the soil. Golder had the remaining oil pumped from the tank a week later.

¶5 In May 1989, Razore and First City signed an agreement concerning the soil. First City agreed to pay Razore to have the soil nails removed from Razore’s property, to remove “any and all of its fuel tanks that encroach Razore property,” and to take responsibility for any contaminated soil resulting from leaking tanks.

¶6 In a letter to the Department of Ecology (Ecology) in August 1989, Golder estimated the leak at 100 gallons of oil and said it would be cleaned up. The letter failed to mention the petroleum contamination on the property that preexisted the tank puncture. Golder supervised the re[114]*114moval of the tank in April 1990. Soil samples taken at that time showed levels of petroleum contamination at 120 times permissible levels. A decision was made not to excavate the contaminated soils. There is no evidence that Ecology or other involved parties were told about the decision to leave the contamination on-site.

¶7 Razore sold the property in 1995 to a group of development companies. These companies — Townhouse, L.L.C., and Trevor, L.L.C. — became third-party defendants in the present action; we shall refer to them as Townhouse. Before selling the property to Townhouse, Razore did not ask First City about any underground tanks First City might have found on the property and did not check to see whether First City had complied with its contractual obligation to clean up any contaminated soil that might have resulted from leaking tanks.

¶8 Townhouse planned to build a condominium tower on the property. Townhouse hired Golder to do various projects on the property, based in part on Golder’s representation that its experience with the adjacent First City property meant it would be able to minimize surprises. One project Golder did for Townhouse in 1997 was a phase I environmental site assessment of environmental conditions. The assessment by Golder disclosed the tank leak. But it suggested the underground tank was not on the property; minimized the extent and effect of the leak; failed to disclose the lab tests showing contamination at 120 times cleanup levels; failed to disclose the presence of the contamination that preceded the spill on February 15, 1989; and failed to disclose Golder’s role in handling that spill. Although Townhouse did not learn of the remaining contamination from Golder’s written phase I assessment, Townhouse agent Tony Simmons did become aware of the possible liability for remaining contamination from conversations he had in 1999 with David Cotton, a Golder engineer.

¶9 Townhouse sold the former Razore property and the plans for the condominiums to Taliesen in late May 2000. [115]*115Before the sale, neither Golder nor Townhouse disclosed to Taliesen the information Cotton and Simmons had discussed about the continued presence of petroleum contamination on the property. In July 2000, Taliesen hired Golder to monitor the construction of a shoring wall.

¶10 While digging in the southeast corner of the property in August 2000, Taliesen found petroleum contaminated soils. Within a few weeks, as the excavation moved inward from the southeast corner, the noticeable sheen and smell of oil signaled the presence of large amounts of contaminated soil. Taliesen decided to continue with excavation, while paying extra for the removal and disposal of the contaminated soil.

¶11 During the excavation and cleanup, Taliesen proceeded with construction of a shoring wall. In October 2000, Golder and Taliesen representatives saw a small amount of black fluid seeping through the shoring wall on the southeastern boundary of the property. No disclosures about this fluid were made to anyone else.

¶12 On January 4, 2002, Taliesen initiated the present action by filing a complaint against Razore, alleging Razore’s liability for the oil leak that occurred while Razore owned the property and seeking Razore’s contribution to the cleanup costs. Razore denied liability and counterclaimed that Taliesen had failed to comply with the regulatory requirements for cleanup cost recovery. Razore brought in former owner Townhouse as a third party defendant, allegedly liable for the costs.

¶13 In late May 2002, Golder — in its capacity as environmental consultant for Taliesen — sent Ecology an “independent remedial action report,” as required by regulations promulgated under the Act. In the report, Golder represented on behalf of Taliesen that the contaminated soil in the building’s footprint had been cleaned up. The black fluid on the shoring wall, observed after the cleanup on the southeastern boundary of the property outside the footprint of the building, was not mentioned. In August 2002, Ecology [116]

Free access — add to your briefcase to read the full text and ask questions with AI

Taliesen Corp. v. Razore Land Co., 135 Wash. App. 106 (Wash. Ct. App. 2006).

135 Wash. App. 106 (Taliesen Corp. v. Razore Land Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Untitled Case
W.D. Washington, 2026
Caitlin Cromar, Et Ano, V. Tag Realty, Llc.
Court of Appeals of Washington, 2025
Columbia Debt Recovery, V. Jordan Pierce
Court of Appeals of Washington, 2025
Niki L. Cantrell v. Dwayne R. Farley & Lisa L. Farley
Court of Appeals of Washington, 2024
Windermere Real Estate/east, Inc., V. Sandra Forman
Court of Appeals of Washington, 2024
Aron English, V. Charcoal Creek Llc
Court of Appeals of Washington, 2024
Samir Rathod, Et Ano. V. Feely Industries
Court of Appeals of Washington, 2023
Daniel Bray, V. Pierce County
Court of Appeals of Washington, 2023
Kristen Abendroth, V John Ryan Bays
Court of Appeals of Washington, 2022
Robert E. Thomas Trust, V. Johns Real Estate Corp
Court of Appeals of Washington, 2022
Kaiser Gypsum Company, Inc.
W.D. North Carolina, 2020
Seattle Times Co. v. Leathercare, Inc.
337 F. Supp. 3d 999 (W.D. Washington, 2018)
Pope Res., LP v. Dep't of Nat. Res.
Washington Supreme Court, 2018
Pope Res., LP v. Wash. State Dep't of Natural Res.
418 P.3d 90 (Washington Supreme Court, 2018)
Douglass v. Shamrock Paving, Inc.
Washington Supreme Court, 2017
Pope Resources Lp And Opg Properties, V Wa State Dept Of Natural Resources
389 P.3d 699 (Court of Appeals of Washington, 2016)
Harlan D. Douglass, et ux v. Shamrock Paving, Inc.
384 P.3d 673 (Court of Appeals of Washington, 2016)