Stephens v. CSX Transportation, Inc.

735 S.E.2d 505, 400 S.C. 503, 2012 S.C. App. LEXIS 207
CourtCourt of Appeals of South Carolina
DecidedJuly 25, 2012
DocketNo. 5008
StatusPublished
Cited by4 cases

This text of 735 S.E.2d 505 (Stephens v. CSX Transportation, Inc.) is published on Counsel Stack Legal Research, covering Court of Appeals of South Carolina primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Stephens v. CSX Transportation, Inc., 735 S.E.2d 505, 400 S.C. 503, 2012 S.C. App. LEXIS 207 (S.C. Ct. App. 2012).

Opinions

FEW, C.J.

This is an appeal from a defense verdict in a personal injury action involving a collision between a train and an automobile at a railroad crossing. Willie Stephens argues the trial court erred in excluding evidence of measures taken by CSX Transportation, Inc., after the collision, in denying his motions for partial directed verdict and JNOV, and in charging the jury. We affirm.

I. Facts

CSX maintains a railroad track in Hampton County. As the track passes through the town of Yemassee, it runs parallel to state Highway 68 and crosses Hill Road, a two-lane road that terminates at Highway 68 just a few feet from the crossing. The Hill Road crossing is a passive grade crossing, meaning it has no active traffic-control devices, such as lights or gates. [510]*510Vehicle traffic is controlled by a stop sign, a stop line, and a cross-buck.1

In 2000, CSX started a program to improve sight distances for vehicles approaching its passive grade crossings in South Carolina by removing vegetation at the crossings. Several months before this accident, CSX’s clear-cutting crew reached the Hill Road crossing. When the crew attempted to cut down a line of trees on land adjacent to the crossing, they encountered Thomas Jackson. Jackson claimed he owned the land and CSX had no right to cut down the trees. The crew did not cut down the trees. CSX’s policy was that in the event of a dispute with a landowner, the crew would not remove vegetation until the dispute was resolved. CSX eventually showed Jackson that it owned a right of way over the land on which the trees were located, and its crew removed them. However, the trees were still in place on the day of the accident.

On February 3, 2004, as Tonia Colvin drove down Hill Road towards Highway 68, a CSX train approached the crossing from her right. Tonia’s boyfriend sat in the front passenger’s seat, and her twelve-year old daughter Lillian sat in the back seat. When Tonia reached the crossing, she stopped at the stop sign. She pulled forward to the stop line and stopped again. Her line of sight in the direction of the train ran across the property Jackson claimed he owned. Tonia testified that she did not hear or see the train before she drove onto the track. As she did so, she heard the train’s horn. She tried to get out of the way by accelerating, but the train struck her vehicle.

South Carolina law requires that a train’s horn be sounded continuously from a distance of at least 1,500 feet from the road until the engine has crossed it. The train’s engineer testified he “believed” he blew the horn on time, but the train’s event recorder showed he did not blow the horn until the engine was 1,161 feet from the crossing. CSX took varying positions on whether it complied with the require[511]*511ment, but eventually stipulated that the data from the event recorder was accurate.

Tonia, her boyfriend, and Lillian were all injured in the accident. Lillian’s injuries were devastating. She sustained severe brain injuries, requiring that doctors place her in a medically induced coma and drill a hole in her skull to alleviate pressure on her brain. When Lillian awoke from the coma approximately one month later, she could not speak, walk, or feed herself. Her injuries required months of physical, occupational, and speech therapy, but even at the time of the trial over four years later, she continued to suffer severe intellectual, behavioral, and physical impairments.

II. Procedural History

Acting on behalf of Lillian, Stephens sued CSX and the state Department of Transportation for negligence. Stephens’ primary claims of negligence as to CSX were that it failed to sound its train’s horn far enough in advance of the crossing and that it failed to remove trees and other vegetation that obstructed Tonia’s view of the track. As to DOT, Stephens claimed it failed to properly inspect the crossing and installed the stop sign and stop line at improper locations.

At trial, after both defendants had presented their evidence, Stephens moved for a partial directed verdict against CSX. Stephens asked the trial court to hold CSX breached its duty of reasonable care and to have the jury decide proximate cause and damages. The trial court denied the motion. Stephens then presented evidence in reply, including the stipulation with CSX that the data from the train’s event recorder was accurate. He rested without renewing his motion for directed verdict.

The verdict form contained special interrogatories, which first asked whether CSX or DOT breached its duty of reasonable care. The jury answered both questions “No” and did not answer any of the other questions on the form. Stephens filed a motion for JNOV, renewing his request for judgment as a matter of law on CSX’s breach of duty. He also asked for a new trial on grounds that the trial court erroneously excluded evidence and erred in charging the jury. The trial court denied the motions.

[512]*512III. Evidentiary Rulings

Stephens sought to admit evidence of two actions taken by-CSX after the accident: (1) CSX removed the trees at the Hill Road crossing that Thomas Jackson claimed CSX had no right to remove, and (2) CSX removed vegetation planted at a different location on the railroad right of way, despite opposition by members of a local garden club. In separate rulings, the trial court sustained CSX’s objections to testimony regarding these actions on the basis that the actions were subsequent remedial measures and thus inadmissible under Rule 407, SCRE. We affirm both rulings.

A. Removal of Trees at the Hill Road Crossing

One of Stephens’ theories of liability as to CSX was that the trees CSX failed to remove interfered with the proper sight distance, so that a driver on Hill Road could not see an approaching train. Stephens argued that if the trees had not been there, or more particularly if CSX had cut the trees before the accident, there would have been sufficient sight distance and the crossing would have been reasonably safe. He claimed that CSX’s failure to cut the trees was a breach of its duty to maintain a reasonably safe crossing. CSX argued in response that the crossing was reasonably safe even with the trees. On this point, Stephens presented testimony from Jackson about CSX’s efforts to cut the trees before the accident. Without objection, Jackson testified he “rais[ed] hell” and CSX agreed not to cut them. Stephens also attempted to elicit testimony from Jackson that CSX cut the trees shortly after the accident. The trial court excluded the testimony of the subsequent measure under Rule 407.

Rule 407 provides that “evidence of ... subsequent [remedial] measures is not admissible to prove negligence or culpable conduct in connection with the event.” The central inquiry under Rule 407, therefore, is the purpose for which the evidence is offered. If the proponent of the evidence offers it for the purpose of proving negligence or culpable conduct, Rule 407 excludes it. However, the rule also provides that it “does not require the exclusion of evidence of subsequent measures when offered for another purpose.” See also Webb, 364 S.C. at 653, 615 S.E.2d at 448 (“Rule 407 bars the introduction of any change, repair, or precaution that under [513]*513the plaintiffs theory would have made the accident less likely to happen, unless the evidence is offered for another purpose.”).

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Stephens v. CSX Transportation, Inc.
781 S.E.2d 534 (Supreme Court of South Carolina, 2015)
Dupont v. Jasper County Sheriff's Office
Court of Appeals of South Carolina, 2014
Washington v. Rhett
Court of Appeals of South Carolina, 2014

Cite This Page — Counsel Stack

Bluebook (online)
735 S.E.2d 505, 400 S.C. 503, 2012 S.C. App. LEXIS 207, Counsel Stack Legal Research, https://law.counselstack.com/opinion/stephens-v-csx-transportation-inc-scctapp-2012.