State ex rel. Sumption v. Smith

108 N.W. 173, 77 Neb. 1, 1906 Neb. LEXIS 36
Nebraska Supreme Court·Decided June 20, 1906·No. No. 14,614·Published·Cited by 1 cases

Opinion

Sedgavick, C. J..

Tbe relators applied to this court for a writ of mandamus to compel the respondents, who are the supervisors [2] of Colfax county, to repair a bridge across the Platte river between that county and Butler county, and to place the same in condition for public travel, and to care for and preserve the material of which said bridge was constructed. The decision of the case is placed mostly upon propositions of laAV, and for an understanding of the principles involved the issues are sufficiently stated in the findings of fact. The matter Avas referred to the Honorable John J. Sullivan to take the evidence and report findings of fact and conclusions of law. His findings of fact are as follows:

“First. That the bridge in question was constructed in the fall of 1904 at a cost of about $22,000. The bridge consisted of 112 spans; 110 spans 24 feet long, and íavo spans 20 feet long. It was a pile bridge, the piles being from 16 to 32 feet in length, the average length of the piles being 24 feet. The height of the decking above the Avater was between 7 ’and 8 feet. ' The piles were driven in the sand and did not reach hardpan. During the outflow of ice in the spring of 1905, 44 spans of the superstructure Avere entirely carried away, and 75 piles were also carried away, 33 spans were more or less injured, leaving of the 112 spans only between 50 and 60 spans intact. To reconstruct and repair the bridge so as to make it passable would cost about $2,700. To restore it to its original condition Avould cost about $5,000. This bridge (and its predecessors) is on the public road extending from Colfax county into Butler county, and is used chiefly by the citizens of Butler county to reach the city of Schuyler. Heretofore the entire expense of building and repairing this bridge and its predecessors has been borne by Colfax county, Schuyler precinct, and the citizens of Schuyler. The bridge was completely carried away during the outflow of ice in the spring of 1883, and again in 1903, and parts of it have been washed out and injured very frequently since the construction of the original bridge in 1871. The permanency of this .bridge, if restored to its original condition, depends entirely upon the character of the breakup and outflow of ice in the spring. It might not stand for [3] more than a year, and it migue stand for several years. This is a matter that is altogether problematical and cannot be determined in advance., Second. That the south bank of the Platte river is the dividing line between Butler and Colfax counties. The north end of the bridge is in Colfax county, and the south end of the bridge is in Butler county. Third. The bridge in question is the only bridge across the Platte river for a distance of 15 miles on either side.. Fourth. There are sufficient available means at the disposal of respondents to enable them, after rebuilding and repairing all other bridges in the county that stand in urgent need of immediate reparation, to rebuild, reconstruct, repair and make passable that part of the Platte river bridge which was washed out and damaged in 1905. But, respondents have not sufficient means, after doing the immediately necessary work of reconstruction and reparation of smaller bridges, to reconstruct and repair the Platte river bridge in such a manner as to afford any reasonable expectation that the new structure would be permanent, or any persuasive probability that it would even withstand the next breakup and outflow of ice. Fifth.. The refusal of respondents to rebuild and repair is not grounded upon or justifiable by the lack of means to make the bridge passable, but is, in part, grounded upon the lack of means to malee it passable and probably permanent. They think it unwise and inexpedient to exhaust their available resources in the erection and reparation of a structure which according to the evidence might not stand for a year, and under the most favorable conditions would probably not stand for more than a few years. Sixth. Respondents had actual knowledge of the condition of the Platte river bridge long before this action was instituted, and they had refused to repair it, although frequently requested so to do by a large number of the citizens of Schuyler. Seventh. The notice mentioned in section 114, ch. 78, Comp. St., was given by relators to respondents before this action was commenced, but it does not appear that any such notice was ever given to the [4] county board of Butler county or'to any member of that board.”

Tlie referee’s conclusion of law upon these facts was: “First. That the duty to repair the Platte river bridge is a joint duty imposed by statute upon Butler county and Colfax county, and cannot therefore be enforced by mandamus without giving the notice required by section 116, ch. 78, Comp. St. Second.. That the repairs contemplated by sections 114 and 115, ch. 78, Comp. St., are repairs of such a slight character that they may be made at once and without any considerable cost. Third.. That the peremptory writ of mandamus should not be granted.”

Free access — add to your briefcase to read the full text and ask questions with AI

State ex rel. Sumption v. Smith, 108 N.W. 173, 77 Neb. 1, 1906 Neb. LEXIS 36 (Neb. 1906).

108 N.W. 173 (State ex rel. Sumption v. Smith) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

State ex rel. Heil v. Jakubowski
38 N.W.2d 26 (Nebraska Supreme Court, 1949)