Opinion

Opinion

KANE, J.

Cross-complainant Standard Oil Company of California (Standard) appeals from a judgment entered on a jury verdict denying recovery on its indemnity cross-complaint.

The Basic Case

The relevant facts disclose that respondent (Intrepid), a ship repair company, contracted with Standard, a shipowner, through its wholly owned *137 subsidiary, Chevron Shipping Company (Chevron), to perform alteration and remodeling work aboard Standard’s vessels berthed at the Richmond Wharf. Under the terms of the contract Intrepid was required to furnish the necessary tools and equipment and to load same aboard ship. Ordinarily, Intrepid’s employees carried the equipment aboard. However, in the loading of heavy equipment, they requested the assistance of other employees, including those of Chevron.

On February 2, 1968 three of Intrepid’s employees, Michael Hansen, Norman Johnsen and Leroy McArthur, were assigned to work on the S.S. Idaho Standard (Idaho). Since their equipment consisted of hand tools, a mortar box, a hoe and three and a half sacks of mortar which proved to be too heavy to carry by hand, they enlisted the help of Harold Brock, a forklift operator, to load • their equipment aboard the Idaho. Hansen and McArthur placed the equipment in the metal basket of the forklift. They then boarded the ship to unload the basket when it arrived alongside the vessel. Brock hoisted the loaded basket to a position where the bottom of the basket was even with the poop deck. The poop deck had two railings which could not be removed. Hansen testified that he and McArthur proceeded to unload the basket by sliding the equipment between the lower rail and the deck. The tools were unloaded first, then McArthur passed the half sack of mortar to Hansen. The accident which took McArthur’s life occurred seconds thereafter.

As to how the accident happened, the evidence is conflicting mainly due to the fact that nobody witnessed the actual events. According to Standard’s theory, which finds support in the record, in attempting to unload the remaining sacks of mortar, McArthur climbed and stepped over the railing into the basket and caused it to become unbalanced and to fall. The falling basket, according to this theory, knocked, him unconscious and into the water where he drowned. According to Intrepid’s version, McArthur did not get into the basket. Intrepid theorizes that the basket became unbalanced as McArthur reached through the railings for one of the remaining bags of cement and the quick-turning side of the basket caught and pulled him down.

The evidence, however, is clear and unequivocal that the basket of the forklift was unsafe and defective; and there is ample evidence in the record to support a conclusion that Intrepid was itself negligent. Thus, there is proof that Intrepid failed to give instructions to its employees about the safety precautions to be observed during the loading and unloading of the equipment. Intrepid also knew that, pursuant to Standard’s rule, no one was permitted to be in the basket when it was raised aloft, and that although *138 some employees were warned not to get into the basket Intrepid failed to pass on the warning to McArthur or to caution him in any other way with respect to the use of the basket. It is also admitted that Intrepid did not inspect the supply baskets in order to ascertain their safety for carrying men aloft.

Based upon these facts, plaintiffs, McArthur’s heirs, brought a wrongful death action against Standard alleging both negligence and unseaworthiness. Standard cross-complained against Intrepid claiming indemnification in case it were found liable in the original action. The jury returned a verdict in favor of plaintiffs in the main action. In response to interrogatories the jury found that Standard was negligent, that the ship was unseaworthy, and that McArthur was not guilty of contributory negligence. The jury also returned a verdict against Standard in the indemnity action on its cross-complaint.

In determining the liability of the parties in the indemnity action, the court, inter alia, gave the following instruction to the jury: “Further, in connection with Standard’s action for indemnity, you are instructed that Standard cannot recover (1) if its own fault or negligence proximately and primarily contributed to the injury or (2) if it, Standard, had knowledge of, acquiesced to, and participated in the negligent acts, or (3) failed to perform some duty in connection with the omission which it may have undertaken by virtue of its agreement, or (4) if Standard’s negligence was active or affirmative as distinguished from the negligence that is passive, or (5) if Standard prevented or serious [vzc] handicapped Intrepid in doing a workmanlike job.”

Standard contends that by giving the above instruction and refusing its instructions on the subject 1 the court committed prejudicial error because the indemnity action in question is governed by the federal maritime law under which, contrary to the state law, a shipowner is entitled to indemnification unless its own negligence or the unseaworthiness of its vessel prevented or seriously handicapped the ship service company in fulfilling its *139 implied warranty of workmanlike performance. Appellant’s position is well taken.

Duty of Workmanlike Performance

In Ryan Co. v. Pan-Atlantic Corp. (1956) 350 U.S. 124 [100 L.Ed. 133, 76 S.Ct. 232], the landmark decision in this area, it was established that a stevedoring contractor who enters into a service agreement with the shipowner is liable to indemnify the owner for damages resulting from the contractor’s substandard performance. Under this rule which has later been extended also to ship repair contracts (United New York Sandy Hook Pilots Ass’n v. Rodermond Indus. (3d Cir. 1968) 394 F.2d 65, 71; Booth Steamship Co. v. Meier & Oelhaf Co. (2d Cir. 1958) 262 F.2d 310, 312), competency and safety are inescapable elements of the service undertaken. The stevedore’s warranty of workmanlike service is comparable to a manufacturer’s warranty of the soundness of its manufactured product, a warranty to cover defects not attributable to the manufacturer’s negligence (Ryan Co. v. Pan-Atlantic Corp., supra, at pp. 133-134 [100 L.Ed. at pp. 141-142]; Italia Soc. v. Ore. Stevedoring Co. (1964) 376 U.S. 315, 319 [11 L.Ed.2d 732, 737, 84 S.Ct. 748]). Although the Ryan

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Harkins v. MG MAYER YACHT SERVICES, INC.
952 So. 2d 709 (Louisiana Court of Appeal, 2006)
D'AQUISTO v. Campbell Industries
162 Cal. App. 3d 1208 (California Court of Appeal, 1984)
Fahey v. Gledhill
663 P.2d 197 (California Supreme Court, 1983)
Texaco, Inc. v. Petroleum Specialists Corp.
35 Cal. App. 3d 427 (California Court of Appeal, 1973)

Cite This Page — Counsel Stack

Bluebook (online)
26 Cal. App. 3d 135, 102 Cal. Rptr. 604, Counsel Stack Legal Research, https://law.counselstack.com/opinion/standard-oil-co-v-intrepid-inc-calctapp-1972.