Schmidt v. Archer Iron Works, Inc.

256 N.E.2d 6, 44 Ill. 2d 401, 51 A.L.R. 3d 1339, 1970 Ill. LEXIS 653
CourtIllinois Supreme Court
DecidedJanuary 28, 1970
Docket41784
StatusPublished
Cited by30 cases

This text of 256 N.E.2d 6 (Schmidt v. Archer Iron Works, Inc.) is published on Counsel Stack Legal Research, covering Illinois Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Schmidt v. Archer Iron Works, Inc., 256 N.E.2d 6, 44 Ill. 2d 401, 51 A.L.R. 3d 1339, 1970 Ill. LEXIS 653 (Ill. 1970).

Opinion

Mr. Justice Schaefer

delivered the opinion of the court:

Paul Schmidt brought this product liability action in the circuit court of Cook County to recover from Archer Iron Works, Inc., for personal injuries he received when part of a- tubular concrete pouring tower allegedly manufactured by Archer fell upon him at a bridge construction site at which he was employed. In separate counts, Schmidt’s wife sought damages for loss of consortium, and an insurance carrier sought subrogation for workmen’s compensation payments made on behalf of Schmidt’s employer. Following the reservation of Archer’s motion for a directed verdict made at the close of all the evidence, the jury returned verdicts for Paul Schmidt in the amount of $250,000, for his wife in the amount of $15,000, and for the workmen’s compensation insurer in the amount of $35,871.58. The trial court vacated the jury verdicts in favor of the plaintiffs, granted Archer’s post-trial motion for judgment n.o.v., and conditionally denied Archer’s alternative motion for a new trial. On the plaintiffs’ appeal the Appellate Court, First District, reversed the judgment and remanded the cause with instructions to reinstate the judgments on the original jury verdicts. (98 Ill. App. 2d 82.) We allowed Archer’s petition for leave to appeal.

The facts are fully set forth in the opinion of the appellate court, and we restate them only to the extent necessary for the determination of the issues on this appeal.

' It is undisputed that the instrumentality which caused Schmidt’s injury was a metal “eye” pin used to secure a concrete pouring chute to a 104-foot-high tower in such a way that the pouring chute could be rotated to channel the flow of concrete in various directions. On August 5, 1954, as a result of a separation in a factory weld which had bonded two parts of the eye pin together, the uppermost chute in the pouring system fell and struck Schmidt, who was working near the base of the pouring tower, injuring him severely.

It is incumbent upon a plaintiff in a product liability case to prove that his injuries resulted from an “unreasonably dangerous” condition of the product and that “the condition existed at the time it left the manufacturer’s control.” (Suvada v. White Motor Co., 32 Ill.2d 612.) This case is unusual in that it is undisputed that the eye pin was defectively manufactured and that this defect was the proximate cause of the plaintiff’s injuries. The narrow issue before us is whether there was sufficient evidence that the defendant furnished the defective pin to justify the jury’s verdict.

The record shows that in August of 1953 Pacific Bridge Company, a bridge contractor, ordered through the Victor L. Phillips Co., a dealer in construction equipment, a concrete pouring tower and certain accessories. In response to this order, the Phillips Company placed a purchase order with Archer for the following items :

“1 — 104' Archer Heavy Duty Single Well 2-WB Tubular Tower Complete

1 — 506 42 Cu. Ft. Concrete Bucket

1 — 508 50 Cu. Ft. Tower Hopper with Dumping Chute

1— 513 Boom Spout Bridle Seat

2— 30HS 30 ft. Swivel Head Chutes

1 — 501 10 ft. Std. Taper Chute”

A boom spout bridle seat is a bracket-like device used for bolting a boom spout bridle securely to a sliding frame affixed to the legs of the tower. A boom spout bridle is a swivel mount upon which the pouring chute rests in a V-shaped bridge. An integral component of the boom spout bridle is an eye pin functionally equivalent to the one which precipitated the accident in the case at bar. The eye pin is a stock item for which there is no separate catalogue listing. It is a component part of a boom spout bridle, and in the Archer price list, from which the Phillips Company obviously prepared its order, it is listed under a separate number and with a separate price: “List No.: 18 Boom Spout Bridle $38.00.”

The evidence clearly shows that neither a boom spout bridle nor an eye pin was specifically mentioned in the Phillips purchase order to Archer, in Archer’s shop order, or in Archer’s invoice for the merchandise. Whether Pacific specifically ordered the bridle and pin from Phillips does not affirmatively appear; nor does it appear whether Phillips had the critical items in stock itself or whether it procured them from some source other than Archer. The record is similarly silent as to what specific items of equipment were shipped to Pacific, precisely when and where they were delivered, or who, if anyone, had access to them during the interval before assembly. It is clear that several days after delivery when Pacific’s workmen began to assemble the tower from the parts that had been placed on the river bank, they were able to construct a complete tower fully functional for the purpose of pouring concrete. They were able to do so without adding, purchasing, repairing, or field-welding any parts.

After Pacific had used the tower it dismantled it, returned it to the river bank and nine months later sold it to the E. L. Harlin Construction Company, plaintiff’s employer. During this interval, the dismantled pieces of the tower lay unboxed and untended on the river bank. The bill of sale from Pacific to Harlin described the identical items that appeared in Phillips’s order from Archer. It identified those items by Archer’s price list numbers. Harlin reassembled the tower without adding, repairing, or field-welding any parts and again had a fully functional pouring tower, including a bridle assembly and eye pin. It was after this second assembly and approximately 13 months after the tower was sold to Pacific that the pin failed, causing the plaintiff’s injuries.

Officers of Archer Iron Works testified unequivocally that the pin in question was not manufactured or supplied by that company and did not resemble the pins it usually produced. A second pin, identified by Archer’s officers as the type of pin they always manufacture, appeared to be substantially different in character from the pin which actually caused the accident. Evidence favorable to the plaintiffs, on the other hand, shows that the pin in question had been factory welded and painted the same rust color with which Archer painted the other parts of the tower; there is no evidence that it had been rewelded or repainted in the field. On the basis of these facts, the trial court concluded that the plaintiffs had adduced no evidence, direct or circumstantial, that Archer had manufactured, sold, or delivered the pin. The appellate court disagreed. In our opinion the judgment of the trial court was correct.

In Pedrick v. Peoria and Eastern R.R. Co., 37 Ill.2d 494, 510, after an exhaustive review of the relevant case law in this and other jurisdictions, we held that directed verdicts or judgments n.o.v. should be entered “only in those cases in which all of the evidence, when viewed in its aspect most favorable to the opponent, so overwhelmingly favors movant that no contrary verdict based on that evidence could ever stand.” Applying this rule to the facts of this case, we agree with the trial judge that the evidence viewed most favorably to the plaintiffs so overwhelmingly supports the defendant’s position that no contrary verdict based on that evidence could ever stand.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Harris v. Thompson
2012 IL 112525 (Illinois Supreme Court, 2012)
Shine v. Owens-Illinois, Inc.
979 F.2d 93 (Seventh Circuit, 1992)
Shine v. Owens-Illinois
979 F.2d 93 (Seventh Circuit, 1992)
Webber v. Armstrong World Industries, Inc.
601 N.E.2d 286 (Appellate Court of Illinois, 1992)
Thacker v. U N R Industries, Inc.
603 N.E.2d 449 (Illinois Supreme Court, 1992)
Wysocki v. Reed
583 N.E.2d 1139 (Appellate Court of Illinois, 1991)
Wehmeier v. UNR Industries, Inc.
572 N.E.2d 320 (Appellate Court of Illinois, 1991)
Smith v. Eli Lilly & Co.
560 N.E.2d 324 (Illinois Supreme Court, 1990)
Zimmer v. Celotex Corp.
549 N.E.2d 881 (Appellate Court of Illinois, 1989)
York v. Lunkes
545 N.E.2d 478 (Appellate Court of Illinois, 1989)
Sutton v. Washington Rubber Parts & Supply Co.
530 N.E.2d 1055 (Appellate Court of Illinois, 1988)
Board of Education v. A, C & S, INC.
525 N.E.2d 950 (Appellate Court of Illinois, 1988)
Smith v. Eli Lilly & Co.
527 N.E.2d 333 (Appellate Court of Illinois, 1988)
Amin v. Knape & Vogt Co.
500 N.E.2d 454 (Appellate Court of Illinois, 1986)
Kramer v. Weedhopper of Utah, Inc.
490 N.E.2d 104 (Appellate Court of Illinois, 1986)
Lowrie v. City of Evanston
365 N.E.2d 923 (Appellate Court of Illinois, 1977)
Smith v. Ariens Co.
360 N.E.2d 351 (Massachusetts Appeals Court, 1977)
Gillespie v. R. D. Werner Co.
357 N.E.2d 1203 (Appellate Court of Illinois, 1976)

Cite This Page — Counsel Stack

Bluebook (online)
256 N.E.2d 6, 44 Ill. 2d 401, 51 A.L.R. 3d 1339, 1970 Ill. LEXIS 653, Counsel Stack Legal Research, https://law.counselstack.com/opinion/schmidt-v-archer-iron-works-inc-ill-1970.