Rose v. Nassif

1 Mass. L. Rptr. 330
CourtMassachusetts Superior Court
DecidedNovember 16, 1993
DocketNo. 91-6360-E
StatusPublished

This text of 1 Mass. L. Rptr. 330 (Rose v. Nassif) is published on Counsel Stack Legal Research, covering Massachusetts Superior Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Rose v. Nassif, 1 Mass. L. Rptr. 330 (Mass. Ct. App. 1993).

Opinion

Butler, J.

Statement of the Case

On September 19, 1991, the plaintiffs, Patrick L. and Jean C. Rose, filed this action seeking damages for defects found in condominiums they purchased in 1986 and 1988. They sued David E. Nassif and Jack Antaramian, individually, as Trustees of Fifty Water-town Street Realty Trust, and as General Partners of Fifty Watertown Street Limited Partnership. The four-count complaint asserted claims of tort (negligence and misrepresentation), contract, G.L.c. 93A and rescission.

In October 1991, the Roses amended the complaint to add Antaramian Realty and Construction, the general contractor, Northern Construction, Richard L. Hickey Co., William Howe Associates and United Masonry Co., Inc. Also included in this amended Complaint was Sasaki Associates, Inc., the architect. The Roses claim that Sasaki negligently performed its architectural services for the condominium project.1

The case is now before the Court on the motion of the defendant Sasaki for summary judgment.

BACKGROUND

From the affidavits and discovery documents submitted, the following facts are not in dispute:

By the end of the summer of 1986, the Waterbridge Condominium was substantially completed. The owner/developer was Jack Antaramian and David Nassif, Trustees of 50 Watertown Realty and Construction Corp. The general contractor was Antaram-ian Realty and Construction Corporation.

Sasaki was hired by Antaramian to be the architect. Under the Owner/Architect Agreement, Sasaki agreed to prepare drawings and outline specifications for the design of the building to be built at 50 Watertown Street, and later known as Waterbridge Condominium. Antaramian was both the owner and contractor, and under the agreement, Antaramian retained authority to decide the quality of many of the component parts [331]*331of the project. Under the agreement, Sasaki is not responsible for the means or methods of construction, for the quality of work or quality of materials actually used in construction. As with any project, the owner retained the right to substitute materials and to build the building as the owner desired; the architect had no power over the owner’s choices.

The architect’s contract specifically provided that although the architect was to make visits on site “when requested by owner” “to determine in general if the work is proceeding in accordance with the Construction documents," the architect “shall not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work.”

The Roses purchased Unit 313 of the Waterbridge Condominium in Watertown in the fall of 1986. They resided there until they moved, in December 1988, to Unit 602.

The Roses never had a contractual relationship with Sasaki.

In February or March 1987, the Roses experienced water problems in Unit 313 in the kitchen and dining room ceilings. Mrs. Rose reported the problem to an agent of Tudor Management, the managing company for the condominium.

From July 1987 through September 1988 the developer had subcontractors perform significant waterproofing at the building. The water problem in Unit 313 was apparently solved by the waterproofing, with the exception of a small area near the sliding glass doors in the living room. Tudor’s agent advised the Roses that these doors needed caulking. The developer did the caulking, and thereafter, there were no further water problems in Unit 313 until several months after the Roses moved to Unit 602.

In September 1987, all unit owners, including the Roses, were informed by letter by Tudor that the building was undergoing additional waterproofing. The letter noted that the work would be performed starting with the first floor, working to the sixth floor.

In the winter of 1987-1988, Tudor’s agent, Barbara Lyons, received a complaint from the tenant in Unit 602 of water infiltration. Ms. Lyons investigated the complaint, and determined that a steel beam inside the outer wall of the living room had not been insulated properly. Moisture condensed on the beam, and infiltrated into the unit. In January or February of 1988, the responsible subcontractor insulated the steel beam. Thereafter, stain kill was applied to the water-damaged wall.

In the fall of 1988, the Roses purchased Unit 602. It is a rooftop penthouse apartment with a Wasco skylight transversing substantially all of the living room. For the purposes of deciding this motion, the court accepts as true Mrs. Rose’s statement that she specifically asked if there were any water problems or heating problems in Unit 602, and that an agent of Antaramian Realty indicated that there were no such problems. After the closing, the Roses spent a considerable sum on improvements, then moved into Unit 602. The Roses retained Unit 313 as a rental unit.

On January 26, 1989, Mrs. Rose noticed water problems in Unit 602, and reported them to the management company.

The plaintiffs seek damages for water infiltration into both Unit 313 and Unit 602. They base their claim against Sasaki on a theory of professional negligence, and support the claim with the opinion of a licensed architect stating that based upon his viewing of a videotape taken in October of 1992, and a personal inspection of the building in December 1992, the architect was negligent in the performance of its duties and in certifying in 1986 that the building was “substantially complete.”

DISCUSSION

Sasaki moves for summary judgment on three bases: (1) the Roses’ claims are barred by the three-year statute of limitations, G.L.c. 260, §2B; (2) the Roses are not the “real parties in interest” to maintain the action pursuant to the Massachusetts Condominium Statute, G.L.c. 183, §10(b); and (3) the Roses cannot recover their damages — economic losses— from Sasaki because of the “economic loss doctrine.”

Unit 313

Without reaching the issue of the source of water infiltration in Unit 313 — i.e., whether it emanated from the unit itself or from a common area — the Roses’ claims against Sasaki for alleged negligence concerning that unit are barred by the three-year statute of limitations contained in G.L.c. 260, §2B.2 Sasaki rendered its services no later than 1986, and therefore performed negligently, if at all, in 1986 and earlier.

Even if one were to apply the “discovery doctrine” to the statute of limitations, see White v. Peabody Construction, 386 Mass. 121 (1982), the Roses had actual notice of water problems in Unit 313 no later than March 1987. Since suit was not commenced until September 1991, the statute of limitations bars the Roses’ claims against Sasaki for Unit 313’s deficiencies.

The plaintiffs’ assertion that the statute of limitations was tolled, pursuant to G.L.c. 260, §12, by the fraudulent concealment of the owner/developer may create an issue of fact with respect to those defendants; however, there is neither an allegation nor any evidence that Sasaki was either in a position to fraudulently conceal the facts from the plaintiffs, or did so. There is no basis upon which to charge Sasaki with any alleged misrepresentations of the owner/develop er / contractor.

The court finds unpersuasive the plaintiffs’ argument that Libman v. Zuckerman, 33 Mass.App.Ct. 341 (1992), applies to this case. Libman involved a suit against the developer/contractor for breach of con

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cigal v. Leader Development Corp.
557 N.E.2d 1119 (Massachusetts Supreme Judicial Court, 1990)
White v. Peabody Construction Co., Inc.
434 N.E.2d 1015 (Massachusetts Supreme Judicial Court, 1982)
Libman v. Zuckerman
599 N.E.2d 642 (Massachusetts Appeals Court, 1992)

Cite This Page — Counsel Stack

Bluebook (online)
1 Mass. L. Rptr. 330, Counsel Stack Legal Research, https://law.counselstack.com/opinion/rose-v-nassif-masssuperct-1993.