Richardson v. Georgia Power Co.

708 S.E.2d 10, 308 Ga. App. 341, 2011 Fulton County D. Rep. 331, 2011 Ga. App. LEXIS 106
CourtCourt of Appeals of Georgia
DecidedFebruary 17, 2011
DocketA10A2184
StatusPublished
Cited by4 cases

This text of 708 S.E.2d 10 (Richardson v. Georgia Power Co.) is published on Counsel Stack Legal Research, covering Court of Appeals of Georgia primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Richardson v. Georgia Power Co., 708 S.E.2d 10, 308 Ga. App. 341, 2011 Fulton County D. Rep. 331, 2011 Ga. App. LEXIS 106 (Ga. Ct. App. 2011).

Opinion

BARNES, Presiding Judge.

Richard Richardson began building a garage on a section of his property encumbered by an easement owned by Georgia Power. The company sued Richardson, seeking injunctive relief from the encroachment and attorney fees for bad faith and stubborn litigiousness. Following discovery, both parties moved for summary judgment, and the trial court granted it to Georgia Power as to the encroachment issue. Richardson appeals, contending the trial court erred in holding that Richardson’s garage was not permitted by the easement. For the reasons that follow, we affirm.

In 1955, Georgia Power acquired by condemnation a 100-foot-wide utility easement, which encumbers a portion of Richardson’s property. The easement, which was recorded, gives the company “the continuous right from time to time to go in and . . . construct, erect, install, operate, maintain, inspect, reconstruct, repair, rebuild, renew and replace” towers, frames, and poles, among other things. It also gives the company the right “to clear, keep clear and to remove . . . all undergrowth, trees and other obstructions, objects and structures” from the easement. Finally, the easement provides:

[T]he land between the towers, frames and poles may be used by the owners of said land . . . for agricultural or roadway or other purposes, provided such use is not inconsistent with the rights sought to be condemned and . . . does not interfere with . . . [the] towers, frames, poles, wires, lines, and the construction, erection, installation, operation, maintenance, inspection, reconstruction, repairing, renewal, replacement and the rebuilding [of the structures].

A 115,000-volt transmission line runs through the easement.

Richardson bought the property in 2006, and his warranty deed notes that the property is subject to “general utility easements of record.” He obtained a building permit and began building a garage on that portion of his property subject to the easement, but before he finished, a right-of-way specialist with Georgia Power asked him to remove the structure because it encroached on the easement. Richardson declined to do so, contending that the structure does not interfere with Georgia Power’s use, and this suit followed.

The evidence presented to the trial court includes Richardson’s deposition and affidavit, three affidavits from Georgia Power employees, and an affidavit from the company’s attorney regarding fees. In his affidavit, Richardson avers that there are “no wires, guy wires, anchors, braces, supports, towers, frames or poles” on that part of *342 the easement within his property, and that his structure does not interfere with the operation of or access to the power line.

A right-of-way supervisor for Georgia Power averred that unimpeded access to the 115,000-volt power line running through this easement was “critical to providing safe and reliable electricity.” A permanent structure such as the one on Richardson’s property “directly and adversely interferes with [the company’s] ability and rights to access that area to carry out operation and maintenance duties, and specifically eliminates our ability and rights under the easement to construct, erect or install the towers, frames, and poles necessary” to transmit electricity, according to the supervisor. Specifically, he continues, the structure eliminates the company’s ability to construct any additional towers, frames, and poles that may become necessary in the future, and interferes with its ability to access that area for overhead or underground wires.

Additionally, in her affidavit, a right-of-way specialist noted that the garage was 70 feet from one utility pole and 25 feet from another, and the company kept the easement free of trees and obstructions for “maintenance and safety,” including, for example, three specific reasons: (1) If the company relocated the poles, the garage may interfere with the relocation of the grounding system; (2) when performing line maintenance, the conductor often must be lowered to the ground and the garage’s location directly under one of the “outside phases” of the line would compromise safety; and (3) depending on the equipment used, someone working on the garage roof could violate the Georgia High-voltage Safety Act.

In its 12-page order, the trial court exhaustively reviewed the facts and concluded that the evidence established that Richardson committed a trespass and violated the easement by building a permanent structure on it. The easement itself was unambiguous, and the 20' x 20' permanent building substantially interfered with Georgia Power’s use under the express terms of the easement. Richardson knew or should have known about the easement, which was recorded, and his building permit specified that “to avoid encumbrances” of the property he should contact a lawyer or buy a consumer guide. The trial court issued an injunction ordering Richardson to remove his structure from the easement. The court denied summary judgment, however, on Georgia Power’s motion for attorney fees under OCGA § 13-6-11, finding that genuine issues of material fact existed as to whether Richardson was stubbornly litigious, and if so, what amount of fees should be awarded.

1. Richardson argues that this easement was not a “contract” but was granted under a condemnation proceeding, and expresses uncertainty regarding the trial court’s statement that “the terms of the contract clearly state the rights of each party,” asserting that the *343 trial court’s discussion of contractual construction is irrelevant. Richardson misunderstands the nature of both the condemnation and the resulting easement. The condemnation was simply a method by which the utility established its need for and cost of the easement it sought. Once the property was “condemned,” the company paid the landowners the value of the easement, which was reduced to writing and filed with the deeds, covenants, plats, and other documents related to real estate ownership. That written easement constitutes a contract, and express easements are construed by applying the rules of contract construction. Municipal Elec. Auth. of Ga. v. Gold-Arrow Farms, 276 Ga. App. 862, 866 (1) (625 SE2d 57) (2005). “Generally, this [easement] presents a question of law for the court, unless the language presents an ambiguity that cannot be resolved by the rules of construction.” Id. In construing a contract, if the terms are clear and unambiguous, the court looks to the contract alone — the easement itself — to determine the parties’ intent. Parris Properties v. Nichols, 305 Ga. App. 734, 738 (1) (a) (700 SE2d 848) (2010).

2. Richardson also asserts that the trial court erred in finding that he “trespassed” by constructing the building on his own property, because an owner cannot trespass on his own property. He argues that he violated no statute or ordinance that would constitute a “trespass.” As used in this context, however, a “trespass” upon an easement means use of the property in violation of the easement terms. See, e.g., Sams v. Young, 217 Ga. 685, 687 (124 SE2d 386) (1962) (“any unlawful interference with a property right is a trespass”) (citation and punctuation omitted); Ga. Power Co. v. Green, 207 Ga.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

3 Dimensional Contractors v. Utah Associated
2024 UT App 35 (Court of Appeals of Utah, 2024)
TRACY ANDERSON v. STACEY DAVID
Court of Appeals of Georgia, 2023
Herren v. Mitchell Electric Membership Corp.
747 S.E.2d 63 (Court of Appeals of Georgia, 2013)

Cite This Page — Counsel Stack

Bluebook (online)
708 S.E.2d 10, 308 Ga. App. 341, 2011 Fulton County D. Rep. 331, 2011 Ga. App. LEXIS 106, Counsel Stack Legal Research, https://law.counselstack.com/opinion/richardson-v-georgia-power-co-gactapp-2011.