Ricard Boiler & Engine Co. v. Toledo

15 Ohio C.C. Dec. 64, 6 Ohio C.C. (n.s.) 501, 1903 Ohio Misc. LEXIS 339
Lucas Circuit Court·Decided June 13, 1903·Published

Opinion

HAYNES, j.

An action was brought in the court of common pleas of Lucas county, for the purpose of enjoining the city of Toledo from signing a certain lease or causing to be executed certain leases to certain parties of certain real estate upon Water street, it being that portion of the real estate used, in part at least, for the abutments of a bridge extending across the river at Cherry street. A motion yvas interposed to dissolve a temporary injunction-which had been granted, and, upon hearing, the court directed a dissolution of the injunction. Thereupon the parties arranged that the court pass upon the entire question and take an appeal, which was done, and no actual trial having taken place, the case was submitted to the court upon affidavits. The case has been heard here upon this appeal.

The bridge across the river at Cherry street rests at the westerly end of it upon parts of two lots, which lots extended from Water street •to the river, and being about 100 feet in width, the bridge being at that point about twenty feet above Water street. In order to support the bridge two abutments have been erected, one situated near the line of Water street on the southerly side, arid the other within the water line of the river or a little within the river, extending nearly across the lot, and there is at either end a small space of ground, of perhaps five or six feet, which the abutments do not cover. Cherry street, which originally came down by an incline to AVater street, was filled in by the city to the same height as the bridge (about twenty feet) and an abutment, built on the northerly side of AVater street and within Cherry Street, was built in to the proper height and full width. The.approach was built over this piece of ground; completely covers it and covers to a large extent this property. The city, conceiving that some revenue might be derived from a lease of this property, had advertised to lease [65] this portion of the lot (it really being a portion of the bridge) and bids were made. After the first bid was made and after the time had elapsed it is claimed that the Ricard Boiler & Engine Company offered another bid. Thereupon.the city rejected all bids and advertised again, and other parties bid, and after the time had elapsed for the filing of bids, and perhaps after some bids had been opéned, the Ricard Boiler & Engine Company made another bid, but the city refused to accept or recognize their bid, and awarded the lease to another party, and it is the execution of this lease that the plaintiff seeks to enjoin. '

It seems, in the history of this bridge, that, some time in 1870, or perhaps a little earlier, a private company had built this bridge across the Maumee river and had purchased the land in question for the approach to the bridge and sustaining the northerly end of it. That bridge was a toll bridge and was run by a private company who owned it. Subsequently, it is said an act was passed by the legislature authorizing the city to buy this bridge, and it was in fact purchased by the city of the company and it was, by proper.deeds, duly executed by the corporation, deeded to the citjr to be an open, public bridge. It was opened and used in that way for some little time — perhaps three or four years, if not more — when, in the year 1882 or 1883, the bridge was carried away and swept out by the flood, and thereupon the present structure was erected in the manner and form in which I have stated.

Now it is claimed that this piece of land is to be considered a street; that persons have been in the habit of going from Water street across the lot adjoining to the Ricard property, or, beginning at. the other end, if you choose, to the docks and boat landings, or to the boats that might be moored at the foot of the street. It will be observed that there is no dock there of the city, because the abutment fills up a large amount of the space, and there is no dock at either end of it; any docks which are there are private docks upon land next to this property. The testimony shows that the Ricard company had driven in there under the bridge with coal and had erected coal bins there and were in the habit of taking in perhaps a carload of coal- and storing it there for the use of the manufacturing establishment of the plaintiff, that.. being built upon the property adjoining the property in controversy, the southerly side of their buildings being upon the line, or nearly upon the line of the two properties. The plaintiff company has a door upon the southerly side, which opens out upon this lot under the bridge, and they have been in the habit of storing boilers and other things there (their business being boiler making), and it is said that they have in some instances repaired boilers, and there are water-closets there used by the [66] employes of that company, which are situated on these lots and upon the water’s edge. It is sáid that they have been putting in from time to time earth and filled in there and the lot has been filled in so that they can -use it, and plaintiffs claim that they have expended perhaps several hundred dollars upon that.

Free access — add to your briefcase to read the full text and ask questions with AI

Ricard Boiler & Engine Co. v. Toledo, 15 Ohio C.C. Dec. 64, 6 Ohio C.C. (n.s.) 501, 1903 Ohio Misc. LEXIS 339 (Ohio Super. Ct. 1903).

15 Ohio C.C. Dec. 64 (Ricard Boiler & Engine Co. v. Toledo) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.