Rau v. State

12 Ill. Ct. Cl. 8, 1941 Ill. Ct. Cl. LEXIS 4
Court of Claims of Illinois·Decided September 9, 1941·No. No. 2319·Published

Opinion

Chief Justice Damron

delivered the opinion of the court:

Claimant’s petition in this case consists of two counts. The first count alleges that claimant is the owner of a tract of land consisting of approximately 16.44 acres; that he specialized in growing onion plants, and that this particular land is particularly adapted for that purpose; that the average yield per pound of seed planted is nine bushels; that in 1933 he planted 1,000 pounds of seed, and avers from that he would ordinarily harvest 9,000 bushels of onion sets. '

Paragraph 3 averred that this tract of land -was provided with a system of adequate drains; that his system was connected with the Village system at a point a short distance south of the B. & 0. Railroad tracks and at Halsted Street; that the main of the Village storm sewer system extends north up along Halsted and empties into the Calumet River, hut it is not averred by what right, title or authority claimant’s system was connected with the Village system.

In paragraph 4 it is averred that in October, 1932, the Department of Public Works and Buildings, Division of Highways, undertook the widening and paving of Halsted Street, a section of which extended from the Calumet River south and past claimant’s land; that in the construction work necessary for improving Halsted Street it became necessary for the Highway Department to fill in and grade the widened roadway; that prior thereto there existed a ditch along the east side of Halsted Street which provided a natural drainage for the adjoining land; that when this ditch was filled and the street graded, the drainage for the adjoining land was destroyed, and thereafter the storm water flowed from the adjoining land and would accumulate along the highway as widened, and the Highway Department connected two catch-basins on the east side of the street about 275 yards apart north of the railroad tracks; that these catchbasins were not installed until after the street had been paved, and these catchbasins were connected with the main sewer which drained claimant’s land. It is then averred that the engineers of the State Highway Department at the time of connecting the catchbasins had made observations and inquiry regarding this drainage system and learned that the systems and the main sewer were not adequate for its purpose and were in bad condition; that the sewer was so ancient that scarcely anyone knew of its history, but notwithstanding the investigation these highway engineers made connection with the catchbasins and thereby caused all storm water from the adjoining farm land to flow into the main sewer, and that the drainage of the storm water caused loose soil to be washed into the main sewer clogging that sewer at a point between claimant’s land and a point south of 134th Street, and at the time of widening Halsted Street the State Highway Department made other connections for drainage waters from the widened highway extending south beyond claimant’s land, and that all these inlets and connections caused the drainage of water to flow into the main sewer which theretofore had drained in another direction and thereby overloaded the main sewer.

The averments contained in this paragraph are very significant in this, that it is stated that the engineers of the Highway Department had learned that- the sewage system and main sewer were never adequate for its purpose, and had always been in a bad condition. The extent of this inadequacy was probably unknown to both the claimant and the Highway Department. This is particularly true in view of remaining averments contained in the petition in so far as the facts are concerned.

Paragraph 5 avers that the Highway Department from observation, inquiry and investigation knew the claimant’s land was drained by the village drainage system and knew that the system in use was not adequate for the purpose of making connections therewith for the drainage of adjoining farm land which theretofore had been drained in another direction, and that in connecting additional catchbasins and inlets the sewage system would be overloaded and would be an interference with claimant’s right to a free, proper and adequate drainage of his land.

Paragraph 6 states that in April, 1933, a heavy rain occurred which resulted in the flooding of land and that claimant reported this flood condition to the Village and that the Village made an investigation and found-the main sewer was clogged and this was reported by the village engineer to the supervising engineer of the Division of Highways.

Paragraph 7 alleges that on May 20, 1933, to May 25, 1933, claimant planted on his land 1,000 pounds of seed and thereafter the seeds grew and reached the height of from four, to six inches, showing uniform growth over the entire tract of land and gave promise of producing a better' yield than for two years prior thereto.

In paragraph 8 it is averred that on July 2,1933, a heavy rain flooded this tract and water accumulated and remained on the land for about a week; that claimant complained to the Village authorities and that upon investigation the engineer of the Village and the plumber of the Village discovered the main sewer of said Village system was stopped between a point south of 134th Street and a point south of the B. & O. Railroad tracks, and this stoppage was caused by sand and dirt which had clogged the main sewer and which had entered the sewer through the catchbasins and connections aforesaid, but in view of the averments contained in paragraph 4 of the complaint that the sewer had been in bad condition before that time, we cannot determine how much or to what extent draining additional sewage into the existing system had brought about the stoppage.

In paragraph 9 it is stated that the overburdening of the sewer main, as hereinbefore stated, caused claimant’s land to be flooded for a week or more, seriously damaging the onion crop; that the main sewer was clogged with loose dirt from the adjoining land and this prevented claimant’s land from being drained and the flood waters remained in the land for a week or more, and that a large area of the growing plants was completely submerged for that period of time, which seriously damaged their growth; that after the water had drained the onion plants which had been flooded died, and there was harvested from said tract a total yield of 2,313 bushels of onion sets; that claimant’s loss was 6,678 bushels, or 267,480 pounds of onion sets, being a loss in the sum of $18,000.00.

Thereafter this Court permitted an amendment to the addenda clause increasing the damages.

In paragraph 10 it is charged that the drainage system of this land had adequately drained the land which was connected with the main sewer of the Village drainage system prior to the interference of the Highway Department and other averments along this line are also contained in paragraph 10, and that the Highway Department of the State of Illinois had no right to construct a highway and interfere with the claimant’s rights without making just compensation and that no compensation had been paid claimant, and that the State is bound, pursuant to the provisions of Section 13 of Article 2 of the Constitution, to pay claimant compensation damages as resulted to claimant by reason of the construction of the drainage system put in by the State.

Count 2 re-alleged paragraphs 1, 2, 3, and 4 of Count 1 of the complaint, and such paragraphs are made paragraphs 1, 2, 3 and 4 of Count 2.

Free access — add to your briefcase to read the full text and ask questions with AI

Rau v. State, 12 Ill. Ct. Cl. 8, 1941 Ill. Ct. Cl. LEXIS 4 (Ill. Super. Ct. 1941).