Pomerene v. School Dist. No. 1

288 F. 145, 1923 U.S. App. LEXIS 2110
Court of Appeals for the Eighth Circuit·Decided March 28, 1923·No. No. 6042·Published·Cited by 1 cases

Opinion

LEWIS, Circuit Judge.

After becoming a resident and citizen of Oregon, Louis W. Pomerene instituted this action, gave his deposition and shortly thereafter died, whereupon it was revived in his administra-trix. He made a contract in May, 1917, with the defendant school district to furnish material and do certain plumbing and furnish material and do the necessary work to install a heating plant in the new high school building at Plattsmouth, Nebraska; and he began this action in 1920 to recover an alleged balance due him, made up of the amount of his bid and extras which he claimed he was directed to furnish and did furnish at the building, after deducting what had been paid him. His bid for the heating plant and plumbing, and his contract made pursuant thereto, show that he was to be paid $9,930.00, but the extras-which he claimed to have furnished and put in brought the total amount up to $18,427.05. In his complaint he allows $13,801.33 as credits for payments as the work progressed, and asked judgment for $4,625.72, the balance. There was no serious dispute about the extras nor amounts claimed for them, but by answer and cross-complaint the school district denied liability and it asked judgment against Pomerene for $6,-055.48; its contention being that the plant would not heat the building, that the school district was compelled to take out the boiler that Pom-[146] erene had installed and replace it with one of larger capacity in order to make it serviceable, which it did at an expense to it in the amount which it sued for in its cross-complaint, and that'Pomerene was liable to it therefor under a provision in the architect’s specifications which were made part of the contract by reference, reading thus: .

“The contractor must guarantee the perfect operation of the plant in every detail. That it will fill and circulate with steam in all its parts at once and at the same time with a pressure of not to exceed one-half pound. And that there will be no waste of either steam or water. That the apparatus will be noiseless in operation and maintain a temperature of 70 degrees when the outside temperature is 20 degrees below zero, provided the building is kept reasonably tight.”

At the close of the trial both sides moved for a directed verdict and the trial judge, being of the opinion that Pomerene was bound by the guaranty, on that ground alone overruled plaintiff’s motion and sustained defendant’s, whereupon verdict and judgment went for defendant on its cross-complaint for $6,000.00. There is no doubt that the boiler installed by Pomerene was too small for the service required. It did,not fulfill the guaranty. It did not keep the building sufficiently warm in cold weather for occupancy. But unless Pomerene was bound by the guaranty there is nothing to sustain the verdict and judgment. We think he was not bound and that the district judge committed an error in law in holding that he was.

The reasons for our conclusions are these: There are two sets of specifications embodied by reference in the contract, and referred to in the latter as general and technical specifications. The general is lengthy, containing more than one hundred numbered paragraphs; the technical describes in detail the- heating system and plumbing which was intended to be put in. It contains the guaranty clause above-quoted. As to the boiler, the technical specifications required prospective contractors to make alternate bids:

(1) “Furnish and install one Ideal S48-10 or equal, cast iron sectional boiler. » *, * Boiler to have rated capacity of not less than 9,376 sq. ft.” ; and (2) “Substitute in place of S48-10 Ideal Boiler two s48-8 Ideal, ox- equal, boilers, together with the necessary trimmings and coverings.”

With the two-boiler alternative a fan system was required, which greatly increases the heating capacity. The proof is convincing that a boiler of the capacity at which Ideal s48-10 is rated would have comfortably heated the building. The guaranty, as already said, is found in that part of the specification which deals with the Ideal boiler, single or double, or its equal. It was prepared by one capable and experienced in that line. Bids were not taken for more than a year later. Prices, of material and cost of labor continued to rise. There was a laudable desire to save for the district. That part of the specification relating to the boiler (and it contained the guaranty and coupled it with a named-boiler capacity) seems to have been abandoned in this way: The architect submitted requests for bids on boilers of specified make And size, Herbert and Kewanee, which did not have as high rated'heating capacity as Ideal s48-10, and accepted Pomerene’s bid for Herbert B-10, rated at 6,500 sq. ft., or Kewanee #16 with a higher rating, and [147] in the contract it was stipulated that the amount of Pomerene’s bid was based on those boilers. There was an option, the contract does not say who might exercise it, as to which of the two should be used. Under the broad powers given the architect in the general specification he could have probably made the selection, but Pomerene ordered the one with larger capacity, Kewanee #16. Before it arrived the district board, exercising through the architect a right reserved to it in the general specification “to make any changes or alterations he may see proper, of the plant, form, dimensions or materials, or the amount or character of the work herein contemplated, or any part thereof, deducting or adding the cost as the case may be to the face of the contract, which amount shall be determined by the parties to the contract or by the architect,” wrote and sent to Pomerene this letter:

“This will authorize you to install one (1) #D-14 Herbert down-draft boiler instead of the boiler specified in the above Building. With this change you will receive the sum of $275.00 in addition to the contract price.”

Free access — add to your briefcase to read the full text and ask questions with AI

Pomerene v. School Dist. No. 1, 288 F. 145, 1923 U.S. App. LEXIS 2110 (8th Cir. 1923).

288 F. 145 (Pomerene v. School Dist. No. 1) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related