People ex rel. Hartigan v. Kerr-McGee Chemical Corp.

568 N.E.2d 921, 210 Ill. App. 3d 115, 154 Ill. Dec. 700, 1991 Ill. App. LEXIS 291
CourtAppellate Court of Illinois
DecidedMarch 5, 1991
DocketNo. 2-90-0577
StatusPublished
Cited by2 cases

This text of 568 N.E.2d 921 (People ex rel. Hartigan v. Kerr-McGee Chemical Corp.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
People ex rel. Hartigan v. Kerr-McGee Chemical Corp., 568 N.E.2d 921, 210 Ill. App. 3d 115, 154 Ill. Dec. 700, 1991 Ill. App. LEXIS 291 (Ill. Ct. App. 1991).

Opinion

JUSTICE GEIGER

delivered the opinion of the court:

The plaintiff, the People of the State of Illinois (the State), sought and received a preliminary injunction to bar the defendant, Kerr-McGee Chemical Corporation (Kerr-McGee), from “construction of the waste contaminate facility proposed for the Kerr-McGee West Chicago site.” That injunction is to remain in effect, basically, until Kerr-McGee complies with State environmental “construction” permit requirements. Kerr-McGee brings this appeal from the preliminary injunction. We affirm.

The facts underlying this action are as follows. In 1967, Kerr-McGee acquired the West Chicago facility at issue. The facility extracted thorium and other materials from radioactive ores. The extraction process left sandy, earthlike by-product wastes that were deposited on the West Chicago property. The radioactive wastes are subject to regulation by the United States Nuclear Regulatory Commission (NRC), under the Federal Atomic Energy Act of 1954 (AEA) (42 U.S.C. §2011 et seq. (1982)).

Kerr-McGee operated the facility under an NRC license until 1973. In 1978, the NRC asked Kerr-McGee to submit a plan for decommissioning the facility. The planned disposition of the by-product waste on the West Chicago property underlies this case.

In 1979, Kerr-McGee proposed to the NRC that the by-product waste should be stored in a “disposal cell” (the cell) to be constructed on the site. The State and the City of West Chicago (the City) intervened in the proceedings, objecting that the on-site cell would be a health hazard. In 1983, the NRC issued its environmental statement, determining that construction of the West Chicago cell was the “preferred” decommissioning plan.

Following the State’s and the City’s subsequent challenges, the NRC convened an Atomic Safety and Licensing Board (the Licensing Board). The Licensing Board required the NRC to prepare a supplemental environmental statement. The supplemental statement, issued in 1989, also recommended construction of the West Chicago cell. According to Kerr-McGee’s engineering report, specifications for the cell provided for 1,000 watertight years. The supplemental environmental statement also concluded that the on-site encapsulation plan was the “preferred course of action,” and it recommended that construction should proceed.

After issuance of both the 1983 environmental statement and the 1989 supplemental statement, the State raised several challenges before the NRC, attacking the Kerr-McGee plan. The State’s contentions indicated particular concern for airborne and water contamination from the cell.

In November 1989, the Licensing Board granted partial summary judgment against the State’s challenges and ordered a hearing on the cell’s impact on groundwater. Following that full hearing, the Licensing Board granted Kerr-McGee summary judgment on all remaining issues. Thereafter, on February 23, 1990, the NRC issued Kerr-McGee a revised license to proceed with construction of the on-site disposal cell. After issuance of that license, the State and City requested a stay pending appeal. The NRC appeals board denied the stay, reasoning that Kerr-McGee’s planned activities for 1990 would be performed regardless of whether the cell was constructed.

On March 5, 1990, Kerr-McGee notified the City that it intended to commence with NRC-authorized activities at the site. The City issued a “stop work” order asserting that Kerr-McGee was beginning construction of the cell. It demanded that Kerr-McGee comply with the City code’s “Erosion and Sedimentation Regulations.” In Federal court, Kerr-McGee sought a temporary restraining order (TRO) and preliminary injunction against the City. That action eventually came before the Seventh Circuit Court of Appeals, which affirmed the district court’s denial of injunctive relief for Kerr-McGee.

THIS CASE

On March 14, 1990, the day before the scheduled initial hearing on Kerr-McGee’s Federal court motions for a TRO and preliminary injunction against the City, the State filed the two-count DuPage County complaint that underlies this case. It sought a TRO and preliminary injunction barring Kerr-McGee from constructing the cell. The State relied on Kerr-McGee’s failure to apply for two State environmental permits: an air “emissions” permit (35 Ill. Adm. Code §201.142 (1985)), and a “waste water discharge permit” (35 Ill. Adm. Code §309.202 (1985)).

The trial judge granted an ex parte TRO and, following hearing of Kerr-McGee’s motion to dismiss and the State’s motion for preliminary injunction, the court granted the preliminary injunction. Kerr-McGee brought this appeal. In summary, Kerr-McGee’s arguments on appeal are as follows: (1) that the injunction is both overly broad and premature as the State has not shown that Kerr-McGee has violated or is about to violate the Illinois Environmental Protection Act (the Act) at the West Chicago site; (2) that the permits demanded do not apply to the cell; (3) that any State permit requirements are preempted by Federal law; (4) that the State is collaterally estopped from raising the issues here; and (5) that the cell and its construction pose no public health or environmental threat.

Kerr-McGee’s first two arguments on appeal are so interrelated that we choose to consolidate them. The first issue we address, then, is whether the trial court’s injunction is both overly broad and premature because it bars activities beyond the scope of the State’s regulations. Kerr-McGee refers to evidence that it did not intend to begin construction of the cell in 1990. According to Kerr-McGee, the court-enjoined activities are to be undertaken regardless of whether a disposal cell is built on the site and they are not activities subject to construction permits that the State seeks to require.

In proceedings before the Licensing Board, Kerr-McGee had outlined its plan for 1990 activities at the site. Kerr-McGee proposed therein to remove trees and roots from the disposal site; it would shred small pieces and incinerate large ones. Some debris near concrete slabs on the site would be “repackaged or stockpiled as appropriate.” Also, Kerr-McGee would excavate contaminated soil lying outside the perimeter of the cell waste line and, perhaps, fill the excavated areas with clean materials; excavated materials would be stockpiled for eventual placement in the cell. Additionally, Kerr-McGee proposed to excavate sediment in three ponds as well as “soft-sediments” nearby. The excavated areas might be backfilled with clean materials, and the excavated material would be stockpiled on the site for eventual placement in the cell. Lastly, in parallel with those site activities, Kerr-McGee would perform detailed engineering work necessary to allow commencement of cell construction in the spring of 1991. The engineering project was estimated to cost between $250,000 and $500,000 during 1990; other activities proposed for 1990 were estimated to cost $450,000.

The Illinois Environmental Protection Act (the Act) (Ill. Rev. Stat. 1989, ch. llUA, par. 1001 et seq.) requires State “construction” permits prior to construction or installation of any facility that will cause, threaten, or be capable of causing or contributing to air or water pollution covered by Illinois pollution regulations. (Ill. Rev. Stat. 1989, ch.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

People ex rel. Ryan v. Agpro, Inc.
Appellate Court of Illinois, 2004

Cite This Page — Counsel Stack

Bluebook (online)
568 N.E.2d 921, 210 Ill. App. 3d 115, 154 Ill. Dec. 700, 1991 Ill. App. LEXIS 291, Counsel Stack Legal Research, https://law.counselstack.com/opinion/people-ex-rel-hartigan-v-kerr-mcgee-chemical-corp-illappct-1991.