Payne v. Spring-Benner-Walker Joint Authority

22 A.3d 1108, 2011 Pa. Commw. LEXIS 295, 2011 WL 2567133
CourtCommonwealth Court of Pennsylvania
DecidedJune 30, 2011
Docket2309 C.D. 2010
StatusPublished

This text of 22 A.3d 1108 (Payne v. Spring-Benner-Walker Joint Authority) is published on Counsel Stack Legal Research, covering Commonwealth Court of Pennsylvania primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Payne v. Spring-Benner-Walker Joint Authority, 22 A.3d 1108, 2011 Pa. Commw. LEXIS 295, 2011 WL 2567133 (Pa. Ct. App. 2011).

Opinion

OPINION BY

SENIOR Judge FRIEDMAN.

Spring-Benner-Walker Joint Authority (Authority) appeals from the October 4, 2010, order of the Court of Common Pleas of Centre County (trial court), which denied the Authority’s post-trial motions and affirmed its prior judgment that the Authority did not reasonably require Richard J. Payne and Catherine A. Payne (Developers) to plug and permanently seal floor drains they built in the Lingwood Town-homes (Lingwood) complex. We reverse.

In 1998, Developers purchased land for the construction of Lingwood, which consists of twenty-six units in five separate buildings. They obtained a construction loan and various permits, including a sewer permit from the Authority. The sewer permit did not address the use or non-use of floor drains or condensate drains connected to the sewer system. 1 (Findings of Fact, Nos. 1-5.)

*1110 After construction of the sewer infrastructure for the first twelve units of Ling-wood, the Authority inspected the property. For each unit, a floor drain and a condensate drain connected directly to the sewer system. The Authority’s executive director, Robert Decker, who performed the inspection with two other Authority employees, informed Developers that the buildings passed the inspection. Between the time of the inspection and the completion of the units, no one at the Authority ever advised Developers that they could not connect floor drains or condensate drains directly to the sewer system. (Findings of Fact, Nos. 7-8,11-13.)

In 1999, Developers constructed the remaining fourteen units of Lingwood in the same manner. The Authority inspected the sewer infrastructure, and Developers’ connection of the floor drains and condensate drains directly to the sewer system passed the inspection. (Findings of Fact, No. 16.)

In 2006, the Authority enacted Resolution 2006-1 in order to prohibit the inflow of rain, surface water, ground water, runoff water or other water into the sewer system. 2 The resolution: (1) requires an inspection of all properties connected to the sewer system upon a change of ownership; 3 (2) imposes an inspection fee of $50.00 if the Authority finds an illegal connection; and (3) allows the Authority to issue a notice of violation requiring an owner to disconnect a device that contributes unlawful and unauthorized inflow to the sewer. (Findings of Fact, Nos. 19-22.) Section 4.17 of the Authority’s rules and regulations prohibits floor drains, except at the Authority’s discretion. 4 The provision does not prohibit condensate drains. 5 (Findings of Fact, Nos. 24-25.)

Subsequently, Developers attempted to convey a Lingwood unit to a third party without disconnecting the unit’s floor drain and condensate drain from the Authority’s sewer system. Developers requested that the Authority exercise its discretion under section 4.17 and grant an exception to Resolution 2006-1 because the Authority *1111 had inspected and approved the drains in 1998. (Findings of Fact, Nos. 26-27.)

Ultimately, the Authority stated that, before conveying any Lingwood unit, Developers would be required to permanently plug any floor and condensate drains by placing a compression fitting into the drain and sealing it with hydraulic cement. Developers objected because the Authority had no proof that any spring water, ground water or surface water has entered the sewer system through the floor drains at Lingwood. Moreover, if the Authority had prohibited the drains at the time of the inspection in 1998, Developers could have remedied the problem at a cost of $100.00 per unit. Developers projected that the current cost of permanently plugging and sealing the drains would be $3,000.00 per unit. 6 (Findings of Fact, Nos. 28, 30-31, 37.)

Developers brought suit against the Authority under section 5607(d)(9) of the Municipality Authorities Act (Act), which states in relevant part:

Any person questioning the reasonableness or uniformity of a rate fixed by an authority or the adequacy, safety and reasonableness of the authority’s services ... may bring suit against the authority in the court of common pleas of the county where the project is located....

53 Pa.C.S. § 5607(d)(9). The trial court entered judgment in favor of Developers, applying the doctrines of vested rights, variance by estoppel and equitable estop-pel to the case. 7 The trial court found that: (1) Developers reasonably relied upon the Authority’s approvals of the drains in the Lingwood units to spend $1,650,000.00 to complete the Lingwood units; and (2) the Authority did not enforce section 4.17, prohibiting floor drains, until November 2008. The trial court also concluded that the Authority’s inspection fee of $50.00 is not uniform because it is applied only to properties with floor drains that have changed ownership. The Authority filed post-trial motions, which were denied. The Authority now appeals to this court. 8

The Authority argues that the trial court erred in applying the doctrines of vested rights, variance by estoppel and equitable estoppel rather than the abuse of discretion standard. We agree.

The question raised by Developers’ suit under section 5607(d)(9) of the Act *1112 was whether the Authority’s decision to disallow the floor drains and condensate drains at Lingwood was reasonable. 9 The question was not whether Developers were entitled to equitable relief from the rules and regulations of the Authority. Thus, the equitable doctrines of vested rights, variance by estoppel and equitable estop-pel were not applicable, and the trial court erred in applying them in this case.

The Authority next argues that Developers failed to present sufficient evidence to establish that the Authority abused its discretion. We agree.

Here, the trial court concluded that the Authority abused its discretion because the purpose of Resolution 2006-1 and section 4.17 was to prevent water from entering the sewer system, and the Authority had no proof that water was entering the sewer system through the drains at Ling-wood. However, the Authority’s sewer system is near capacity. The Authority checked the sewer pipes and found that water was not entering the system through any leaks. The Authority’s decision to locate illegal devices that might be allowing water to enter the sewer system and to require property owners to disconnect them from the sewer system is a reasonable solution to that problem. The solution is not made unreasonable simply because the Authority does not have proof that the drains in a particular property are allowing water to enter the sewer system.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

In Re Appeal of Kreider
808 A.2d 340 (Commonwealth Court of Pennsylvania, 2002)
Honaman v. Township of Lower Merion
13 A.3d 1014 (Commonwealth Court of Pennsylvania, 2011)
Chicora Commons Ltd. Partnership, LLP v. Chicora Borough Sewer Authority
922 A.2d 986 (Commonwealth Court of Pennsylvania, 2007)

Cite This Page — Counsel Stack

Bluebook (online)
22 A.3d 1108, 2011 Pa. Commw. LEXIS 295, 2011 WL 2567133, Counsel Stack Legal Research, https://law.counselstack.com/opinion/payne-v-spring-benner-walker-joint-authority-pacommwct-2011.