New Era Manufacturing Co. v. O'Reilly

95 S.W. 322, 197 Mo. 466, 1906 Mo. LEXIS 43
CourtSupreme Court of Missouri
DecidedJune 19, 1906
StatusPublished
Cited by2 cases

This text of 95 S.W. 322 (New Era Manufacturing Co. v. O'Reilly) is published on Counsel Stack Legal Research, covering Supreme Court of Missouri primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
New Era Manufacturing Co. v. O'Reilly, 95 S.W. 322, 197 Mo. 466, 1906 Mo. LEXIS 43 (Mo. 1906).

Opinion

GANTT, J.

This was an action commenced in the circuit court of the city of St. Louis for alleged breaches by the lessor in a certain lease made by the lessor, Dr. Thomas O’Reilly, to the plaintiff company on the 25th of October, 1899.

The petition alleged that on said date the said O ’Reilly leased to plaintiff the premises known as 905 and 907 Lucas avenue in the city of St. Louis, for a period of five years, commencing January 1, 1900; that the said premises were a part of a certain eight-story brick building and basement known as 901, 903, 905 and 907 Lucas avenue; that the said building and basement were divided off by partition walls so as to render them fit and suitable for occupancy by two distinct tenants, 901 and 903 by one tenant, and 905 and 907 by another, both of said tenements being adapted for use as manufacturing establishments; that the premises 901 and 903, at the time of the execution of the lease to plaintiff, contained a boiler plant adapted for the production of steam, which was to be used for furnishing heat, light and power for both tenants, and that there were pipes and other apparatus running from the premises 901 and 903 through and about the floors of premises 905 and 907, which were connected with the [469]*469boiler plant, and receiving steam therefrom; that there is also in the premises 905 and 907 two elevators with the necessary machinery and apparatus for operating the same and also machinery and apparatus for heating the premises by means of steam generated by the said boiler plant. The petition then alleges that at the date of the lease Singer Bros, were in possession of 901 and 903 under a lease from said O’Reilly; that in the lease to plaintiff said O’Reilly agreed to put the boilers, engines, elevators and radiators and the machinery for operating the two elevators and for heating the building in good condition, and to wire the building for electric lighting, and to furnish in the premises 901 and 903 a 30 kilowatt 220-volt constant potential direct coupled dynamo and engine, and to deliver the premises to plaintiff on December 15, 1899.

It is further alleged that by said lease said O ’Reilly obligated plaintiff to pay to the lessee of the premises 901 and 903 monthly on demand one-half of the total cost of running and operating the boiler plant, including in such costs all outlays for salary, wages, coal, repairs and other expenses and that it was provided that such payment by plaintiff should be for the steam heat and power and the running of the said dynamo and engine, and also for live steam for plaintiff’s dryer and laundry machine, and in consideration of said monthly payment by plaintiff to lessee of 901 and 903 would furnish steam for all purposes aforesaid. It is then alleged that on December 15,1899, plaintiff took possession of the premises 905 and 907 with all repairs and alterations made except the installation of the dynamo and engine, which was provided for in the lease, plaintiff relying upon the agreement of O’Reilly to furnish the dynamo and engine later; that on February 22, 1900, O’Reilly installed the dynamo and engine, which plaintiff alleges was not capable of doing the work of a 30 kilowatt 220-volt dynamo and engine, but was of inferior capacity and insufficient for [470]*470the uses for which said dynamo and engine are designed. The petition then proceeds to state the various items of damage to plaintiff hy the insufficiency of the dynamo and engine furnished by O’Reilly; that since the taking of possession by plaintiff of the premises on December 15, 1899, plaintiff had paid to Singer Bros., the tenants of the premises 901 and 903, half of the total cost of running and operating the said boiler plant and was continuing so to do as required by said lease; that on February 11th, 1902, Singer Bros, did decline and refuse to furnish steam to plaintiff for the running of said dynamo and engine unless plaintiff would agree to pay the entire cost of furnishing said steam and of running and caring for the said dynamo and engine, and that plaintiff thereupon notified the defendants of such refusal on the part of Singer Bros., but defendants have failed and refused to require Singer Bros, to furnish such steam; that the said O’Reilly died February 24,1901. Plaintiff then states that while the dynamo and engine were being operated in plaintiff’s premises between February 22,1900; and June 23, 1901, at which time it broke down, plaintiff was required to pay and did pay the entire cost of the services of a competent electrician whose services were required for the care of the dynamo and engine, and that Singer Bros, refused to furnish an electrician for that purpose, by reason of which failure plaintiff was compelled to expend $731.45.

The petition further alleges that since June 3,1901, plaintiff has been compelled to obtain all of the electric light and power required by it for use in its business from persons other than the Singer Bros., and to furnish steam for the dynamo and engine plaintiff will be compelled to purchase electric light and power during the unexpired term of the lease, all to the plaintiff’s damage in the sum of $5,650.30.

Inasmuch as the court sustained a demurrer to the evidence, it is deemed unnecessary to refer to the ans[471]*471wer of the defendant and plaintiff’s reply thereto. The lease offered in evidence let to the plaintiff “the eight-story brick building and basement known as Nos. 905 and 907 Lucas avenue for a period of five years commencing January 1st, 1900, at a rental of $4,000 per year for the jobbing and manufacturing of shirts, cloaks, suits, etc.” For the purpose of this case the material provisions of the lease are as follows:

“Said lessor hereby covenants and agrees to put the boilers, engines, elevators and radiators, and all the machinery and apparatus in said building for the operation of the two elevators therein, and for the heating of said building, and all plumbing and sewer connection in good condition.
“The lessor further covenants and agrees to make the following alterations, additions and repairs in and to said premises, to-wit:
“1st. To furnish a 30 kilowatt 220-volt constant potential direct coupled dynamo and engine, for the exclusive use of said lessee.
“2nd. To wire the building for twenty multiple arc and 200 16-candle power incandescent lights, and to furnish 20 arc lamps of a pattern similar to those used by the Imperial Electric Light, Heat & Power Company, of this city, namely, a direct current enclosed multiple arc lamp; out-lets and are lamps to be located as designated by lessee.
“It is further agreed that should Singer Bros, vacate their present building, 901 and 903 Lucas avenue, during the period of this lease, said party of the second part shall get the preference of the leasing of the entire building. It is further agreed that said lessee shall get full possession of the leased premises, December 15, 1899, with all repairs and alterations completed, and that rents shall commence and be payable under this lease on January 1, 1900. It is further agreed that should premises 901 and 903 Lucas avenue be vacated prior to the expiration of this lease, the lessor shall pay [472]*472any excess in the cost of operating the heating and power plant which may be caused thereby to this lease.
“Said lessee agrees to pay to the lessee of Nos.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Keith v. Jos. G. Schmersahl Co.
371 S.W.2d 334 (Supreme Court of Missouri, 1963)
Havens v. Brown
237 S.W. 126 (Missouri Court of Appeals, 1922)

Cite This Page — Counsel Stack

Bluebook (online)
95 S.W. 322, 197 Mo. 466, 1906 Mo. LEXIS 43, Counsel Stack Legal Research, https://law.counselstack.com/opinion/new-era-manufacturing-co-v-oreilly-mo-1906.