KALOKATHIS, District Judge.

This appeal follows a jury verdict finding Natural Gas Processing Company (NGP) ninety percent negligent in an oilfield accident that severely injured Michael Hull. The district court entered judgment based on the jury’s verdict for $1,455,444, plus costs and interest. NGP contends four errors occurred mandating reversal.

We affirm.

I. ISSUES

NGP alleges four errors:

1. Whether the trial court’s failure to answer a jury question in open -court is plain error, mandating reversal;
2. Whether the jury’s verdict and judgment are contrary to Wyoming law relating to an owner’s liability to employees of an independent contractor;
*1183 3. Whether, even if NGP breached duties it owed to Plaintiff, that breach was the proximate cause of Plaintiffs damages;
4. Whether the trial court erred in instructing the jury that violation of a statute [OSHA regulation] was evidence of negligence, when no evidence existed that NGP was responsible to enforce the regulations.

II. FACTS

Michael Hull began working for Teton Well Service (TWS) in 1984. In June, 1992, NGP hired TWS to assist in reworking an oil well, called the “Union Pacific Number One,” in the Hatfield Dome Oilfield ten miles south of Rawlins. The well was going to be “fracked.” 1 TWS was to pull the tubing out of the well, remove the bridge plug, test the tubing, place a packer in the well and aci-dize 2 it in preparation for the “frac” job. After the “frac” job was completed by another contractor, TWS was to trip back into the well to circulate (remove) the sand that accumulates on top of the bridge plug as a result of the “frac” job.

June 9, 1992, was the TWS crew’s first day on site. From June 9 until June 11, TWS prepared the well for the “frac” job. On June 11, Black Warrior, another contractor, came to the site to perforate the well. 3 On Friday, June 12, BJ Services, yet another contractor, brought 500 gallons of acid to the lease to acidize the well. June 13 and 14 fell on a weekend; the crews did not work on those days. The well was “fracked” by BJ Services on June 15. TWS began circulating-sand off the bridge plug on June 16. The next day (June 17), the TWS crew was still circulating sand.

Mike Hull was on deck using power tongs to connect the joints of tubing already in the well with the chicksan and kelly hose, which had been raised over thirty feet in the air. OSHA regulations require that safety cables be used to fasten the kelly hose and the standpipe end to the derrick and at the swivel end to the swivel housing. However, on this occasion, the safety chains were not in use. As Hull turned the tubing on the floor, the chicksan overhead bound up and did not turn. As the tubing on the floor turned, the swage unscrewed and the swage, chicksan (which alone weighed approximately fifty pounds) and kelly hose fell, striking Hull in the back of the hard hat and driving him onto the rig floor. Mike Hull sustained many *1184 injuries, including a traumatic brain injury, linear skull fracture, fractured clavicle, and fractures of both lower left leg bones in the ankle area. His injuries required immediate brain surgery, performed in Casper after being airlifted from the Rawlins hospital.

Hull filed suit against NGP (and Amoco Production Company, which was subsequently dismissed by stipulation), alleging that NGP was negligent and had exercised direct control over the work-over rig hired to do clean up work on a well where NGP was the operator. Hull alleged, among other things, that NGP breached various duties of care it owed Hull as an employee on the work-over rig and Hull was injured as a result. Issues presented to the jury included NGP’s direct liability for its own acts, as well as vicarious liability for its conduct in directing TWS employees’ actions.

After a jury trial, a verdict was rendered against NGP, finding it responsible for ninety percent of the fault. The remainder of the fault was split between Hull (four percent), John Nodolf (the driller) (five percent), and Jack Wiggins (the derrick hand) (one percent). Damages were fixed at $1,617,160.

NGP filed a motion for judgment notwithstanding the verdict, to alter or amend the judgment, or for a new trial, which was denied. NGP appeals both the judgment and the trial court’s order denying its post-trial motions.

III. DISCUSSION

A. . An owner’s liability to employees of an independent contractor

This court has previously adopted the general proposition set forth in Restatement (Second) of ToRTS § 409 (1965), stating that “the employer of an independent contractor is not liable for physical harm caused to another by an act or omission of the contractor or his servants.” Hill v. Pacific Power & Light Co., 765 P.2d 1348, 1349 (Wyo.1988). See also, Stephenson v. Pacific Power & Light Co., 779 P.2d 1169, 1176 (Wyo.1989); Jones v. Chevron U.S.A., Inc., 718 P.2d 890, 898 (Wyo.1986); Noonan v. Texaco, Inc., 713 P.2d 160, 164-67 (Wyo.1986); 41 Am.Jur.2d Independent Contractors § 24 (1968).

This Court has previously held that the owner of the workplace who employs an independent contractor and

retains the right to direct the manner of an independent contractor’s performance or assumes affirmative duties with respect to safety owes a duty of reasonable care to an employee of the independent contractor even if the employee is injured doing the very work the [independent] contractor was hired to perform.

Jones, 718 P.2d at 896 (citations omitted). See also Cockburn v. Terra Resources, Inc., 794 P.2d 1334, 1342 (Wyo.1990); Stephenson, 779 P.2d at 1177; Hill, 765 P.2d at 1349; Brewster v. Salveson Construction, 765 P.2d 1350 (Wyo.1988); Stockwell v. Parker Drilling Co., 733 P.2d 1029, 1033 (Wyo.1987). However,

the owner “must retain more than the general right to order the contractors to stop work, to inspect the progress of the work, to make recommendations thereon, or to prescribe alterations or deviations in the work” [Stockwell, 733 P.2d at 1033] in order to impose liability under that rule.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Janet G. Peterson v. Meritain Health, Inc.
2022 WY 54 (Wyoming Supreme Court, 2022)
Wood v. CRST Expedited, Inc.
419 P.3d 503 (Wyoming Supreme Court, 2018)
Merit Energy Company, LLC v. Blake Horr
2016 WY 3 (Wyoming Supreme Court, 2016)
Circle C Resources, Inc. v. Kobielusz
2014 WY 35 (Wyoming Supreme Court, 2014)
Shepherd of the Valley Care Center v. Fulmer
2012 WY 12 (Wyoming Supreme Court, 2012)
Singer v. New Tech Engineering L.P.
2010 WY 31 (Wyoming Supreme Court, 2010)
Kruckenberg v. Ding Masters, Inc.
2008 WY 40 (Wyoming Supreme Court, 2008)
Heywood v. State
2007 WY 149 (Wyoming Supreme Court, 2007)
Black v. William Insulation Co., Inc.
2006 WY 106 (Wyoming Supreme Court, 2006)
Black v. William Insulation Co.
2006 WY 123 (Wyoming Supreme Court, 2006)
Foote v. Simek
2006 WY 96 (Wyoming Supreme Court, 2006)
Boswell v. Colloid Environmental Technologies Co.
236 F.R.D. 682 (D. Wyoming, 2006)
Killian v. Caza Drilling, Inc.
2006 WY 42 (Wyoming Supreme Court, 2006)
Diamond B Services, Inc. v. Rohde
2005 WY 130 (Wyoming Supreme Court, 2005)
Hjelle v. Mid-State Consultants, Inc.
394 F.3d 873 (Tenth Circuit, 2005)
Armstrong v. Hrabal
2004 WY 39 (Wyoming Supreme Court, 2004)
Coates v. Anderson
2004 WY 11 (Wyoming Supreme Court, 2004)

Cite This Page — Counsel Stack

Bluebook (online)
886 P.2d 1181, 1994 Wyo. LEXIS 165, 1994 WL 687783, Counsel Stack Legal Research, https://law.counselstack.com/opinion/natural-gas-processing-co-v-hull-wyo-1994.