Napper v. United States
This text of 374 F. Supp. 3d 583 (Napper v. United States) is published on Counsel Stack Legal Research, covering United States District Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Opinion
IRENE C. BERGER, UNITED STATES DISTRICT JUDGE
The Court has reviewed the Motion of the United States to Dismiss this Civil Action (Document 7), the Memorandum in Support of the Motion of the United States to Dismiss (Document 8-1), Plaintiff's Memorandum in Opposition to Motion to Dismiss (Document 14), the Reply Memorandum in Support of the Motion of the United States to Dismiss this Civil Action (Document 16), the Motion to Amend Complaint, Instanter (Document 17) and accompanying Amended Complaint (Document 17) as well as the attached exhibits, and the Memorandum of the United States in Opposition to Plaintiff's Motion to Amend Complaint, Instanter (Document 21). For the reason stated herein, the Court finds that the motion to amend should be granted and the motion to dismiss should be denied.
FACTUAL ALLEGATIONS AND PROCEDURAL HISTORY
The statement of facts set forth below is taken from the Plaintiff's amended complaint and supporting exhibits.1 The Plaintiff, Scott Napper, Administrator of the Estate of Joshua Napper, deceased, filed a one-count amended complaint against the Defendant, the United States of America, pursuant to the Federal Tort Claim Act (hereinafter "FTCA") 28 U.S.C § 1346(b). Joshua Napper, along with 28 other miners, died on April 5, 2010, at the Upper Big Branch Mine (hereinafter "the Mine")
*586due to an explosion.2 After the explosion, the Mine Safety and Health Administration (hereinafter "MSHA") began investigating its cause. MSHA determined that on a longwall face, methane ignition at the Mine transitioned into a small methane explosion that propagated into a massive coal dust explosion and the deadliest U.S. coal mine disaster in nearly forty years.
MSHA also reviewed its conduct in the period leading up to the fatal accident. The investigation revealed that MSHA inspectors violated mandatory regulations which created, maintained, or contributed to unsafe working conditions including the violations before and including those cited in the March 6, 2012 Internal Review of MSHA's actions at the Mine. For example, according to the report, in violation of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook, some parts of the mine were not inspected during the previous six regular inspections, fire protection equipment inspections were not conducted or documented, checks for imminent dangers were not conducted and self-contained self-rescue devices were not properly inspected. Moreover, inspection trainees conducted some inspections.
The Plaintiff, the father of the deceased, instituted this action on February 9, 2018. The sole count of the complaint asserts claims for negligence and wrongful death under West Virginia law. The Plaintiff alleges that "the United States is liable here for negligently executing a duty it undertook, and for failing to exercise reasonable care to prevent harm to Joshua Napper caused by the United States' affirmative negligent conduct." (Compl. ¶ 32).
On May 11, 2018, the Defendant moved to dismiss the complaint pursuant to Rules 12(b)(1) and 12(b)(6) of the Federal Rules of Civil Procedure. The United States contends that (1) the Plaintiff's claims are barred by the sovereign immunity of the United States, (2) the Court lacks subject matter jurisdiction under the FTCA, because the Plaintiff's claims are barred by the discretionary function exception, (3) the Court lacks subject matter jurisdiction because the United States has not waived sovereign immunity under the FTCA to allow tort claims based on alleged violations of federal law, and (4) the Plaintiff's claims are based on alleged violations of the Mine Act, and federal law does not recognize a private right of action for alleged violations of the Mine Act.
On May 25, 2018, the Plaintiff filed a memorandum in opposition to the motion to dismiss and on June 1, 2018, filed a motion to amend the complaint and attached the amended complaint. On June 1, 2018, the Defendant filed a reply memorandum in support of its motion to dismiss. Finally, on June 16, 2018, the Defendant filed a memorandum opposing the Plaintiff's motion to amend the complaint, wherein it argued that the amendments were not sufficient to defeat its motion to dismiss.3
STANDARD OF REVIEW
A. Motion to Dismiss-12(b)(1)
A motion to dismiss pursuant to Rule 12(b)(1) raises the fundamental question *587of whether a court is competent to hear and adjudicate the claims brought before it. "In contrast to its treatment of disputed issues of fact when considering a Rule 12(b)(6) motion, a court asked to dismiss for lack of jurisdiction may resolve factual disputes to determine the proper disposition of the motion." Thigpen v. United States ,
B. Motion to Dismiss-12(b)(6)
A motion to dismiss filed pursuant to Federal Rule of Civil Procedure
Free access — add to your briefcase to read the full text and ask questions with AI
IRENE C. BERGER, UNITED STATES DISTRICT JUDGE
The Court has reviewed the Motion of the United States to Dismiss this Civil Action (Document 7), the Memorandum in Support of the Motion of the United States to Dismiss (Document 8-1), Plaintiff's Memorandum in Opposition to Motion to Dismiss (Document 14), the Reply Memorandum in Support of the Motion of the United States to Dismiss this Civil Action (Document 16), the Motion to Amend Complaint, Instanter (Document 17) and accompanying Amended Complaint (Document 17) as well as the attached exhibits, and the Memorandum of the United States in Opposition to Plaintiff's Motion to Amend Complaint, Instanter (Document 21). For the reason stated herein, the Court finds that the motion to amend should be granted and the motion to dismiss should be denied.
FACTUAL ALLEGATIONS AND PROCEDURAL HISTORY
The statement of facts set forth below is taken from the Plaintiff's amended complaint and supporting exhibits.1 The Plaintiff, Scott Napper, Administrator of the Estate of Joshua Napper, deceased, filed a one-count amended complaint against the Defendant, the United States of America, pursuant to the Federal Tort Claim Act (hereinafter "FTCA") 28 U.S.C § 1346(b). Joshua Napper, along with 28 other miners, died on April 5, 2010, at the Upper Big Branch Mine (hereinafter "the Mine")
*586due to an explosion.2 After the explosion, the Mine Safety and Health Administration (hereinafter "MSHA") began investigating its cause. MSHA determined that on a longwall face, methane ignition at the Mine transitioned into a small methane explosion that propagated into a massive coal dust explosion and the deadliest U.S. coal mine disaster in nearly forty years.
MSHA also reviewed its conduct in the period leading up to the fatal accident. The investigation revealed that MSHA inspectors violated mandatory regulations which created, maintained, or contributed to unsafe working conditions including the violations before and including those cited in the March 6, 2012 Internal Review of MSHA's actions at the Mine. For example, according to the report, in violation of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook, some parts of the mine were not inspected during the previous six regular inspections, fire protection equipment inspections were not conducted or documented, checks for imminent dangers were not conducted and self-contained self-rescue devices were not properly inspected. Moreover, inspection trainees conducted some inspections.
The Plaintiff, the father of the deceased, instituted this action on February 9, 2018. The sole count of the complaint asserts claims for negligence and wrongful death under West Virginia law. The Plaintiff alleges that "the United States is liable here for negligently executing a duty it undertook, and for failing to exercise reasonable care to prevent harm to Joshua Napper caused by the United States' affirmative negligent conduct." (Compl. ¶ 32).
On May 11, 2018, the Defendant moved to dismiss the complaint pursuant to Rules 12(b)(1) and 12(b)(6) of the Federal Rules of Civil Procedure. The United States contends that (1) the Plaintiff's claims are barred by the sovereign immunity of the United States, (2) the Court lacks subject matter jurisdiction under the FTCA, because the Plaintiff's claims are barred by the discretionary function exception, (3) the Court lacks subject matter jurisdiction because the United States has not waived sovereign immunity under the FTCA to allow tort claims based on alleged violations of federal law, and (4) the Plaintiff's claims are based on alleged violations of the Mine Act, and federal law does not recognize a private right of action for alleged violations of the Mine Act.
On May 25, 2018, the Plaintiff filed a memorandum in opposition to the motion to dismiss and on June 1, 2018, filed a motion to amend the complaint and attached the amended complaint. On June 1, 2018, the Defendant filed a reply memorandum in support of its motion to dismiss. Finally, on June 16, 2018, the Defendant filed a memorandum opposing the Plaintiff's motion to amend the complaint, wherein it argued that the amendments were not sufficient to defeat its motion to dismiss.3
STANDARD OF REVIEW
A. Motion to Dismiss-12(b)(1)
A motion to dismiss pursuant to Rule 12(b)(1) raises the fundamental question *587of whether a court is competent to hear and adjudicate the claims brought before it. "In contrast to its treatment of disputed issues of fact when considering a Rule 12(b)(6) motion, a court asked to dismiss for lack of jurisdiction may resolve factual disputes to determine the proper disposition of the motion." Thigpen v. United States ,
B. Motion to Dismiss-12(b)(6)
A motion to dismiss filed pursuant to Federal Rule of Civil Procedure 12(b)(6) for failure to state a claim upon which relief can be granted tests the legal sufficiency of a complaint or pleading. Francis v. Giacomelli ,
The Court must "accept as true all of the factual allegations contained in the complaint." Erickson v. Pardus ,
*588Iqbal ,
To survive a motion to dismiss, "a complaint must contain sufficient factual matter, accepted as true, 'to state a claim to relief that is plausible on its face.' " Iqbal ,
DISCUSSION
The Defendant has moved for dismissal based on Federal Rules of Civil Procedure 12(b)(1) and 12(b)(6). The Court will initially address the 12(b)(1) motion, because the 12(b)(6) challenge is moot if the Court lacks subject matter jurisdiction.
The Court must first address whether the United States has waived its sovereign immunity. [T]he Court has recognized the general principle that "the United States, as sovereign, 'is immune from suit save as it consents to be sued ... and the terms of its consent to be sued in any court define that court's jurisdiction to entertain the suit. Lehman v. Nakshian ,
The Fourth Circuit addressed this exact question of law in the per curiam opinion of Bragg v. United States ,
The Supreme Court of Appeals of West Virginia unambiguously answered our question in the affirmative. That court stated that factors including "the likelihood of injury, the magnitude of the burden of guarding against it, and the consequences of placing that burden" on a defendant "weigh in favor of finding that a safety inspector owes a duty of care to the employees whose safety the inspection is intended to secure." Bragg v. United States,230 W.Va. 532 ,741 S.E.2d 90 , 99-100 (2013) (quotation marks omitted). The court plainly "h[e]ld that a private inspector who inspects a work premises for the purpose of furthering the safety of employees who work on said premises owes a duty of care to those employees to conduct inspections with ordinary skill, care, and diligence commensurate with that rendered by members of his or her profession."Id.
Id. at 283. Thus, it is clear that West Virginia law recognizes a claim against a private inspector for negligent inspection of a mine, and the limited waiver of the United States' sovereign immunity under the FTCA gives this Court jurisdiction over this matter.
However, the Court's inquiry does not end there. Congress created exceptions to § 1346(b) under
[a]ny claim based upon an act or omission of an employee of the Government, exercising due care, in the execution of a statute or regulation, whether or not such statute or regulation be valid, or based upon the exercise or performance or the failure to exercise or perform a discretionary function or duty on the part of a federal agency or an employee of the Government, whether or not the discretion involved be abused.
In its motion to dismiss, the Defendant contends that both prongs of the test set forth in Gaubert are satisfied. First, it argues that many of the claims alleged in the complaint are not violations of mandatory duties. It notes that the Plaintiff did not dispute that MSHA conducted the required six regular quarterly *590inspections of the Mine and that the inspectors inspected the working areas of the mines as determined by the active operation of the Mine at the time of the inspections. To the extent that an area of the mine was not inspected, the Defendant contends that the mine operator failed to maintain current maps and information reflecting all active working sections of the mine. The Amended Complaint alleges the following specific mandatory violations of inspection procedures:
19. The findings of the MSHA investigation were breathtaking. Inspectors from MSHA violated certain mandatory regulations which created, maintained, or contributed to unsafe working conditions including, but not limited to, those violations identified in the March 6, 2012 Internal Review of MSHA's actions at [the Mine], which is incorporated by reference. A copy of the MSHA Internal Review is attached as Exhibit C.
20. Plaintiff alleges, and according to the MSHA Internal Review:
A. In violation of the General Coal Mine inspection procedures and Inspection Tracking System Handbook, some areas of the Mine were not inspected during each of the six regular inspections reviewed.
B. The inspector who traveled to EP-LW3 on March 10, 2010 took [only] two of the three air readings required for that location.
C. In violation of Standard Operating Procedures and District 4 guidance, ROE ("right of entry") trainees conducted inspection activity, apart from ARs (Authorized Representatives of the Secretary), for portions of five of the six regular inspections at [the Mine] during the review period. Some of the inspection activities conducted by ROE trainees involved areas mandated by the Mine Act to be inspected by ARs, such as air courses and seals. A ROE trainee inspected some of the 1 North Longwall face equipment on March 15, 2010, while the AR remained on the headgate side of the longwall panel. Also during the review period, ROE trainees conducted inspections (apart from ARs) of seals, return air courses, a conveyor belt entry, a shop, surface equipment, SCSRs, and explosives storage magazines.
D. For each regular inspection reviewed by the Internal Review team, and in violation of Uniform Mine File Procedures Handbook, one or more inspectors or specialists did not review or did not document reviewing the UMF (Uniform Mine File) prior to inspecting at [the Mine].
E. In violation of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook, an inspector arrived at [the Mine] on a Saturday after the start of the day shift but did not travel underground during the first regular inspection of fiscal 2009. Another MSHA inspector did not visit the Mine until 19 days later, when the lead inspector arrived before the start of the shift and traveled underground with the mantrip. During the first regular inspection of fiscal 2010, an electrical specialist and a health specialist arrived at the Mine after the shift's starting time on the first day of the inspection to inspect the AMS (atmospheric monitoring system) and respirable dust parameters.
F. Inspectors violated the provisions of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook requiring mine visits on all working shifts during one of the six regular inspections reviewed. During the third regular inspection for fiscal 2009, inspectors did not inspect the Mine on evening shift.
*591G. In violation of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook inspectors did not consistently conduct or document conducting the following activities:
i. Inspect fire protection equipment, first aid equipment, potable water, escapeway maps, and sanitary facilities.
ii. Hold health and safety discussions with miners on every working section. During three inspections, inspectors did not conduct or document conducting health and safety discussions on any of the sections. During the other three inspections, inspectors documented conducting these discussions underground on one to four of the working sections. Two inspectors interviewed indicated that they held their health and safety discussions with miners on the surface.
iii. Check for imminent dangers in working places every time they inspected a working section. Inspectors sometimes went to a section to terminate a citation(s) or to inspect equipment or other items on the section, but they did not check for imminent dangers as directed.
iv. Observe or document observing the entire mining cycle on some working sections during the first five regular inspections of the review period.
v. Document the location of the last open crosscut on the working sections that had advanced since their last inspection visit.
vi. Inspect all SCSRs carried or stored on working sections, as follows:
a. Inspect any SCSRs (self-contained self-rescue device) carried by miners on each working section during two of the six inspections. Only some of the SCSRs carried by miners were checked during two other inspections. During one inspection some SCSRs were inspected by a ROE trainee while he was apart from the AR.
b. Inspect the SCSRs stored on the longwall section during the fourth regular inspection for fiscal 2009.
c. Consistently document the manufacturer, model, and serial numbers of SCSRs on working sections.
H. In violation of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook, Inspectors did not travel with or document traveling with at least one preshift, one on-shift, and one weekly examiner during three of the six inspections in the review period. During the first regular inspection for fiscal 2009, inspectors did not travel with or document traveling with a preshift examiner. During the fourth regular inspection for fiscal 2009, inspectors did not document traveling with a preshift or weekly examiner. During the first regular inspection for fiscal 2010, inspectors did not document traveling with an on-shift examiner. While inspectors traveled areas of the Mine with Operator representatives, the inspectors did not document that these persons were conducting examinations or that they were mine examiners. Inspectors also did not consistently document the examiners' names in their inspection notes as required by the Handbook. During the first regular inspection for fiscal 2009, an inspector did not document the name of the on-shift examiner he accompanied. During the second regular inspection for fiscal 2009, inspectors did not document the names of any of the examiners they accompanied. During the first regular *592inspection of fiscal 2010, an inspector did not document the name of the preshift examiner he accompanied. The inspector traveling with a preshift examiner during the second regular inspection for fiscal 2010 did not document the examiner's name.
I. Inspectors did not always follow the instructions related to gas detectors in the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook. District 4 personnel did not inspect a representative number of gas detectors in use at [the Mine]. During the 6 regular inspections of the review period, inspectors documented examining a total of 13 gas detectors at the Mine. Only 3 of the 13 gas detectors examined were being used by mine examiners. Inspectors documented examining four gas detectors during one regular inspection, the most of any inspection in the review period. For the second regular inspection of fiscal 2010, there was no documentation to indicate that any detectors were examined. Inspectors did not always document a means to identify gas detectors, such as the Operator's identification number or manufacturer's serial number.
J. Inspectors did not document that they examined all required records and postings during the other four regular inspections in the review period. Only a few of the individual records or postings were listed in the notes as having been inspected, as directed. Some inspectors documented in the ITS (inspection tracking system) that they examined several records and postings but did not document doing so in their notes.
K. In violation of the Handbook directive to check records back to the end of the previous regular inspection, inspectors were not consistent in their review of past records. Although the Handbook directed them to check records back to the end of the previous regular inspection, inspectors stated they would check the record books but only back to the start of the current inspection, to the beginning of the current record book, or for the past few days or weeks.
L. District 4 inspectors did not inspect the [the Mine] explosives storage facilities during the third regular inspection for fiscal 2009. Inspectors did not complete and submit ATF (Bureau of Alcohol, Tobacco and Firearms) Form F 5030.5 during any of the six regular inspections as directed by the Handbook.
M. Inspectors did not consistently inspect or document inspecting some surface items, areas, and equipment in either in their notes or in the listing provided in the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook.
N. In violation of the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook and other Agency directives, inspectors did not always comply with the instructions for documenting in their notes their inspection activities and the areas and equipment they inspected during each of the six regular inspections. Required information that inspectors did not always document in their inspection notes includes the following:
i. Serial numbers, manufacturer, or model of SCSRs examined
ii. Serial or company numbers of equipment inspected
iii. The manufacturer and model of the Atmospheric Monitoring System installed in the longwall belt entry after the longwall began production in September 2009 *593iv. Number of seals in each set or the methane and oxygen readings in the entry nearest the seals after the air has passed the seals
v. Names of mine examiners accompanied
vi. Mine records or postings examined
vii. Some inspection activities and inspection of areas/equipment on working sections and surface areas
viii. Checking for imminent dangers when inspecting the working places on each working section
ix. A statement such as "No Violations Observed" or "NVO" after they inspected an area or item and did not observe any violations.
O. Inspectors sometimes did not include a statement such as "No Imminent Dangers Observed" or "NIDO" when they inspected working places and did not observe an imminent danger. Interviews indicated inspectors generally were aware of the requirements in the General Coal Mine Inspection Procedures and Inspection Tracking System Handbook to document imminent danger checks and to include statements when no violations were observed; however, they did not consistently comply with the procedures.
P. Many pages of notes were not dated as required. Some notes did not have any dates, while other notes listed incorrect dates. The General Information Cover Sheets for three of the six regular inspections were not completed as directed by the Handbook or contained errors. Three of the Cover Sheets had missing or incorrect dates, two had other missing information, and one had an incorrect event number. The Daily Cover Sheet for three days also included the incorrect event number. Inspectors rarely listed shift and shift type on the Daily Cover Sheet to show the shift during which they were inspecting.
Q. The General Coal Mine Inspection Procedures and Inspection Tracking System Handbook directs inspectors to document certain inspection activities in the appropriate section of the ITS. Some areas and equipment inspected were recorded in the notes but not in the ITS, or alternatively, recorded in the ITS but not in the notes. Sometimes, the serial or company number recorded in the notes did not match what was recorded in the ITS.
R. Supervisors failed to identify and document many of the shortcomings found by the Internal Review team, including that the Mine had not been inspected in its entirety during any of the six regular inspections.
S. For the first regular inspection of fiscal 2009, and in violation of the Coal Mine Safety and Health Supervisor's Handbook, the supervisor did not complete the review of any complete set of the daily inspection notes from [the Mine] until 28 days after the end of the inspection quarter, the same day that he certified the inspection as complete. For the first regular inspection in fiscal 2010, review of inspection notes covering four days was not completed until 20 days into the next quarter, and inspection notes covering two days of this inspection were not initialed as reviewed by the supervisor. By the time these notes were reviewed, the next regular inspections had begun, so the previous inspections could not be reopened for corrective action.
Amended Compl. ¶ 19-20. The Defendant dismisses these allegations and argues that the Plaintiff merely listed the violations issued to the operators for violation of mandatory safety standards.
*594The Court finds that the Amended Complaint sufficiently pleads that the MSHA employees were negligent in following mandatory, non-discretionary statutes, regulations, and policies. Importantly, this Court can consider evidence outside the pleadings without converting the 12(b)(1) proceeding to one for summary judgment. Evans
The Defendant relies heavily on Estate of Bernaldes v. United States ,
In Bernaldes , a miner was killed when he fell down an uncovered chute.
In United States v. Varig Airlines , the Supreme Court held that the discretionary function exception barred a suit because FAA inspectors were "specifically empowered" to spot check aircrafts under construction for compliance with FAA regulations.
Here, the FAA has determined that a program of "spot-checking" manufacturers'
*595compliance with minimum safety standards best accommodates the goal of air transportation safety and the reality of finite agency resources. Judicial intervention in such decisionmaking through private tort suits would require the courts to "second-guess" the political, social, and economic judgments of an agency exercising its regulatory function. It was precisely this sort of judicial intervention in policymaking that the discretionary function exception was designed to prevent. It follows that the acts of FAA employees in executing the "spot-check" program in accordance with agency directives are protected by the discretionary function exception as well.
In Holbrook v. United States , an inspector made the decision to certify the airworthiness of an aircraft under
What is more, the Order's internal guidance to FAA employees is insufficient to establish a mandatory requirement such that the exercise of discretion was removed from the task at hand. If select passages from a lengthy and complex order could serve as the basis for government tort liability, the FAA would be hobbled by the specter of litigation as it worked to promote aircraft safety. The price of circulating internal guidance should not be an exponential increase in exposure to a tort suit.
Lastly, the Court can easily distinguish the facts in Indem. Ins. Co. of N. Am. v. United States ,
Based on a review of the Amended Complaint and the MSHA IR, for the purpose of analyzing this 12(b)(1) motion, the Court finds that the allegations pled are based on mandatory requirements which are not discretionary in nature. Therefore, the Court does not need to reach the second part of the Gaubert test.
To the extent the Defendant contests factual allegations which go to the merits of Plaintiff's claims, to support the argument that the Court should dismiss this matter based on subject matter jurisdiction, the Court finds that those attacks are premature:
[A]n FTCA plaintiff facing an indirect attack on the merits-by way of a Rule 12(b)(1) motion-deserves greater procedural protection than that afforded by a typical Rule 12(b)(1) motion ... we are unable to identify any valid reason for distinguishing this type of FTCA claim-with intertwined factual questions on jurisdictional and merits issues-from other tort claims with intertwined factual issues. Thus ... district court should assume jurisdiction and assess the merits of the claim when the relevant facts-for jurisdictional and merits purposes-are inextricably intertwined."
Kerns v. United States ,
Finally, with respect to its 12(b)(6) motion, the Defendant argues that federal law does not recognize a private right of action for a tort claim based on alleged violations of the Mine Act, and that as a matter of public policy, the Court should not permit the suit to move forward. (Memorandum in Support of the Mot. of the U.S. to Dismiss pg. 5 n2). Specifically, the Defendant argues the primary responsibility for safety in the mine remains with the mine operator, not MSHA and that therefore, MSHA is not to be considered an insurer for mine safety.
CONCLUSION
Wherefore, after thorough review and careful consideration, the Court ORDERS that the Motion to Amend Complaint, Instanter (Document 17) be GRANTED and the Amended Complaint (Document 17) be FILED , and the Motion of the United States to Dismiss this Civil Action (Document 7) be DENIED.