Morton v. Ambridge Borough

101 A.2d 661, 375 Pa. 630, 1954 Pa. LEXIS 400
CourtSupreme Court of Pennsylvania
DecidedJanuary 4, 1954
DocketAppeal, 257
StatusPublished
Cited by36 cases

This text of 101 A.2d 661 (Morton v. Ambridge Borough) is published on Counsel Stack Legal Research, covering Supreme Court of Pennsylvania primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Morton v. Ambridge Borough, 101 A.2d 661, 375 Pa. 630, 1954 Pa. LEXIS 400 (Pa. 1954).

Opinion

Opinion by

Mr. Justice Chidsey,

This is an appeal from a judgment entered on a directed verdict for the defendant borough in an action in trespass to recover for property damage suffered when a storm sewer collapsed.

In April and May of 1948, plaintiff purchased five lots in the Borough of Ambridge, Beaver County. The deeds delivered to plaintiff were made subject to the following easements or conditions: “3. There is hereby reserved to Charles A. Dickson, his heirs and assigns, the right to enter upon any of the lots and upon any of the streets, alleys or ways which are crossed by a natural drainage course upon the land upon which said plat of lots, streets, alleys and ways, is laid out, which water course is approximately indicated by the line upon the Plan marked ‘A-B.’ This *632 reservation or right of entry is for the purpose of enabling the said Charles A. Dickson or his assigns, or any person or persons acting by or with his consent, to construct a sewer or other appropriate improved water course, it being understood that the private right to Charles A. Dickson hereby reserved shall cease and determine whenever and as soon as a . public sewer or other waterway may be constructed to care for the water flowing in said water course.”.

“4. This adoption and dedication of streets, alleys and ways is not to be construed as a prohibition upon the construction, maintenance and operation upon the streets, alleys and ways of said plan of any appropriate privately or publicly owned system of pipes for the distribution and supply of water, gas, sewage or other pipeable substance to the owners of the lots embraced in the said plan; provided always that such construction, operation and maintenance of pipes for water, gas, sewage or other pipeable substance shall always be construed as conferring a benefit upon the owners of the several lots in said plan, and no owner of any such lot may or shall have any claim for damage against the said Charles A. Dickson, his heirs or assigns, by reason of such construction, operation, and maintenance.”. The rights reserved to Charles A. Dickson had been assigned to the defendant borough in 1942.

Prior to the time plaintiff purchased the lots, an 84 inch storm sewer had been built along the lines of the natural watercourse referred to in the reservation above quoted. The sewer was constructed in various sections, at various times and by various parties. The portion underlying plaintiff’s land had been constructed in 1926 by a predecessor in title.

In 1949 plaintiff constructed a one story, no basement brick building used as an automobile sales *633 and service garage on the site of the five lots he had purchased in 1948. On September 11, 1950, a heavy rain storm occurred and a portion of the sewer under plaintiff’s building collapsed with the result that a hole 30 feet in diameter and 17 feet deep developed in the floor of plaintiff’s garage.

At the trial testimony was introduced on behalf of the plaintiff that the defendant borough had connected several lateral sewers to the 84 inch sewer, which had the effect of increasing the flow of water in the storm sewer by some 20%. Plaintiff’s expert witnesses testified that the laterals were in a state of disrepair which permitted water to seep or flow into the earth surrounding the sewer rather than to be confined within the sewer itself, and that the defects were such that would have been apparent upon a reasonable inspection. Plaintiff’s expert witnesses further testified that this seepage or percolation of water so weakened the fill around the sewer that when it was subjected to the heavy rain storm of September 11, 1950, the sewer collapsed, and the plaintiff’s building thereby was damaged. In this state of the record, with a directed verdict entered for the defendant, we must accept as true all facts and proper inferences from testimony which tends to support plaintiff’s contention, and reject all testimony and inferences to the contrary: Henigin v. Booth & Flinn, Ltd., 307 Pa. 528, 161 A. 871.

Appellant contends that he introduced sufficient evidence to create an issue of fact for the jury on the question of the negligence of the appellee. Appellee contends that the direction of a verdict in its favor was proper and relies on the authority of Munn and Barton v. The Mayor, &c., of Pittsburgh, 40 Pa. 364. This case does not support appellee’s position. It holds that where a storm sewer has been constructed by one *634 other than the municipality on the line of a natural watercourse and the municipality connects its own sewer with it and in addition occasionally inspects the entire sewer, the municipality does not thereby adopt the sewer as its own or assume the duty of maintaining the entire sewer. In the instant case the appellant’s proof was to the effect that the injury to his building resulted from appellee’s failure to inspect and maintain the lateral connections which the borough made to the main sewer and also from the increased flow of water which resulted from those lateral connections and thus prima facie established a clear causal chain connecting appellee’s negligent actions with appellant’s damages. Aron v. Philadelphia, 310 Pa. 84, 164 A. 777, also relied upon by appellee, concerns the question whether a municipality can be held liable for an error of judgment in the selection of its plan for the discharge of surface waters, and is therefore inapposite.

It must be concluded that appellant introduced sufficient evidence to create a jury question whether appellee was negligent and as a result of such negligence appellant was damaged; however, a further legal question arises as to appellee’s liability. Appellee contends that because of the easement reserved to Charles A. Dickson and subsequently assigned to the borough, appellant can have no cause of action because of negligence in the construction, operation or maintenance of the sewer. The nature of the reserved right must therefore be determined. Paragraph three of the original deed reserved to the grantor the right to enter upon any of the lots, streets, alleys or ways of the development which are crossed by a natural watercourse until such time as a public sewer or other waterway be constructed to care.for the water flowing in a natural watercourse. As is expressly stated in *635 paragraph three, the obvious purpose of the reserved easement was “. . . for the purpose of enabling the said Charles A. Dickson or his assigns, or any person or persons acting by or with his consent, to construct a sewer or other appropriate improved water course, . . Since the instant action was not founded on any theory of damages resulting from an entry for the purpose of constructing a sewer, it has no bearing on the facts of this case.

The reservation in paragraph four of the original deed provided that the grantor retained the right to construct, maintain and operate upon the streets, alleys and ways of the plan “. . . any appropriate privately or publicly owned system of pipes for the distribution and supply of water, gas, sewage or other pipeable substance to the owners of the lots embraced in the said plan; provided always that such construction, operation and maintenance

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Valentino, M., Aplt. v. Phila. Triathlon, LLC
209 A.3d 941 (Supreme Court of Pennsylvania, 2019)
Weidner v. McCann School of Business, Inc.
37 Pa. D. & C.5th 340 (Cumberland County Court of Common Pleas, 2014)
Citibank (S.D.), N.A. v. Rhineer
30 Pa. D. & C.5th 402 (Lancaster County Court of Common Pleas, 2013)
Citibank v. Hull
26 Pa. D. & C.5th 188 (Clinton County Court of Common Pleas, 2012)
Bayne v. Smith
965 A.2d 265 (Superior Court of Pennsylvania, 2009)
Delaware Valley Factors, Inc. v. Ronca
660 A.2d 623 (Superior Court of Pennsylvania, 1995)
Denlinger, Inc. v. Dendler
608 A.2d 1061 (Superior Court of Pennsylvania, 1992)
Lilley v. Johns-Manville Corp.
596 A.2d 203 (Superior Court of Pennsylvania, 1991)
Scoop Inc. v. Century III Associates
43 Pa. D. & C.3d 601 (Alleghany County Court of Common Pleas, 1986)
Cumis Insurance Society, Inc. v. Girard Bank
522 F. Supp. 414 (E.D. Pennsylvania, 1981)
Richard's 5 & 10, Inc. v. Brooks Harvey Realty Investors
399 A.2d 1103 (Superior Court of Pennsylvania, 1979)
Zimmer v. Mitchell and Ness
385 A.2d 437 (Superior Court of Pennsylvania, 1978)
Lincoln Pulp & Paper Co., Inc. v. Dravo Corp.
436 F. Supp. 262 (D. Maine, 1977)
Fidelity Bank v. Tiernan
375 A.2d 1320 (Superior Court of Pennsylvania, 1977)
SPALLONE v. Siegel
362 A.2d 263 (Superior Court of Pennsylvania, 1976)
Husak v. Berkel, Inc.
341 A.2d 174 (Superior Court of Pennsylvania, 1975)
Reynolds v. Preferred Mutual Insurance
49 Mass. App. Dec. 97 (Mass. Dist. Ct., App. Div., 1972)
Independence Development, Inc. v. American Arbitration Ass'n
59 Pa. D. & C.2d 416 (Bucks County Court of Common Pleas, 1972)
Warren City Lines, Inc. v. United Refining Co.
287 A.2d 149 (Superior Court of Pennsylvania, 1971)
Bel-Air, Inc. v. Lawrence G. R. Kinney Co.
271 A.2d 229 (Supreme Court of Pennsylvania, 1970)

Cite This Page — Counsel Stack

Bluebook (online)
101 A.2d 661, 375 Pa. 630, 1954 Pa. LEXIS 400, Counsel Stack Legal Research, https://law.counselstack.com/opinion/morton-v-ambridge-borough-pa-1954.