In this claim, claimant sought the recovery of damages for personal injuries, conscious pain and suffering and wrongful death of decedents, Cruz Santiago Beyes and Bamona Bivera Beyes, husband and wife, predicated upon the maintenance of a nuisance and on negligence of the New York ¡State Thruway Authority, an agency of the State of New York. Claimant was duly appointed administrator of the estates of both decedents by the Surrogate of the County of New York on August 14, 1962. Decedents left surviving seven children, the eldest at the time of trial being approximately 14 years of age and the youngest being twins 6 years old.

The fatal injuries resulted from an accident which occurred at approximately 5:00 p.m. on the afternoon of July 15, 1961 during a heavy rainstorm near milepost 16.2 north on the west end of the Tappan Zee Bridge of the New York State Thruway. The decedents were passengers in the rear seat of a three-month-old 1961 four-door Oldsmobile sedan, model FA185, with power steering and without power brakes, driven by Daniel Garcia, returning to New York City from an afternoon visit with a relative in Napanoch. The Garcia vehicle was proceeding at 35 miles per hour southbound in the inside (left) passing lane immediately before the occurrence of the accident when the automobile in front showed its stop lights and slowed down. As he felt “ like a dirt road under the tires ”, Mr. Garcia testified, the car skidded to the left, he then tried to control the car, lightly applied the brakes, which did not respond too well so that the [155] vehicle crossed the dividing pavement into the northbound lane where it was struck by two oncoming vehicles. The passengers in the rear seat were catapulted upon the roadbed, sustaining fatal injuries.

The New York State Thruway is a toll, limited access, high-speed roadway for automotive vehicles, composed of a concrete wearing surface, of three traffic lanes proceeding southbound and three traffic lanes proceeding northbound. At a point about 500 feet north of milepost 16.2 south, the size of the concrete traffic ribbon began to narrow from a width of 49 feet at its juncture with an approach road to a width of 37 feet at the milepost. Also, during this distance, the road surface curved to the left in a 2% curve with a radius of 2,850 feet on a minus 2% grade and a bank of 7 inches in the 37-foot width. From this distance to the milepost, there were two types of highway delineators or dividers; the first being a 25-foot-wide grass mall with concrete curbing which, at its termination, had no curbing and changed to a blacktop or asphaltic concrete level-with-the-roadway transition for a distance of 92 feet from whence it continued as a 10-foot-wide beveled concrete paved median strip raised 2% inches above the road’s wearing surface. The west abutment of the Tappan Zee Bridge is at milepost 16.2 north, which is the point at which the Tappan Zee Bridge terminates and the northbound section of the Thruway on the west bank of the Hudson River begins. Due to the radius of the southbound curve, milepost 16.2 south is approximately 18 feet north of the signpost marking milepost 16.2 north. These mileposts are markers set on metal standards on the outside of the shoulders of southbound and northbound outside (slow) traffic lanes of the Thruway. At the point where the blacktop transition began at the southbound uncurbed terminus of the grass mall, the composition of the wearing surface of the northbound and southbound traffic lanes changed from concrete to blacktop pavement. This blacktop pavement, or asphaltic concrete, began approximately 18 feet south of milepost 16.2 south.

The chain of events leading to the accident herein apparently began in the transitional area of concrete-to-blacktop pavement. Between the termination of the grass mall and the beginning of the concrete median, the northbound and southbound lanes were not separated by barricades, dividers or raised curbing but the blacktop surfacing contained painted lines identifying the traffic lanes. A regulation “No U Turn ” traffic sign on a standard in the center of the blacktop transition divider identified ■ the area as one in which official vehicles could change their direction from either north or southbound lane to the other.

[156] At a distance between 1,000 feet and 500 feet north of milepost 16.2 south, on the right shoulder of the southbound lanes of the Thruway, stood a large traffic sign bearing the legend, ‘ ‘ Bridge, 50 MPH ’ ’, the number indicating miles per hour being changed to read “35 MPH” when weather conditions warranted such change. Defendant’s witnesses testified that the miles-per-hour-sign had been changed to read “ 35 MPH” on July 15,1961 due to the downpour of rain.

It is a requirement in New York that the public authority responsible has the duty to give warning of the hazards on highways maintained by it; thus warning signs must be erected whenever necessary and such signs must be reasonably adequate for the intended purpose. (McDevitt v. State of New York, 1 N Y 2d 540.) The question arises whether the defendant failed to have the southbound lanes properly signed to warn drivers that they were approaching a curve. The expert testimony varied whether signing was required by posting on both shoulders of one-direction roadways which had three or more traffic lanes delineated. Although claimant’s expert had qualifications as an authority in the field of traffic engineering in the State of New Jersey and had received national recognition in his field, other traffic experts indicated that the requirement of dual signing was under study and had not arrived at the point of recognized approval or disapproval. Regardless of dual signing, however, the necessity for posting a regulation warning sign showing a curve is determined by the sharpness of the curve. In the opinion of the experts, where road construction engineering reflects a “flat” curve, good traffic engineering practice does not require the erection of a curve sign. The testimony identified the curve in question, hereinbefore described, as a “ flat ” curve.

Free access — add to your briefcase to read the full text and ask questions with AI

Morales v. New York State Thruway Authority, 47 Misc. 2d 153, 262 N.Y.S.2d 173, 1965 N.Y. Misc. LEXIS 1594 (N.Y. Super. Ct. 1965).

47 Misc. 2d 153 (Morales v. New York State Thruway Authority) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Ferguson v. Ben M. Hogan Company
307 F. Supp. 658 (W.D. Arkansas, 1969)