Opinion

Kashiwa, Judge,

delivered the opinion of the court:

This is a suit by the assignee of an option to purchase certain land in the City of Titusville, Brevard County, Florida. The plaintiff complains that the defendant, under the option language and other related documents, represented that the land in question was riparian land when its was not. Plaintiff claims that he suffered damages to the extent of $34,689.00 because the land was not riparian land. Belief on account of the defendant’s breach of contract is premised upon our general Tucker Act jurisdiction, 28 U.S.C. § 1491 (1970). The case is before this court on cross-motions for summary judg[362]*362ment. For reasons hereinafter stated, we hold for the defendant, allowing its motion for summary judgment.1

There is no genuine issue as to any material fact. On May 29, 1987, a joint venture composed of J. L. Williams, B. J. iChafin, and James C. Hadsell granted the Postmaster General of the United States an option to purchase certain land in Titusville, Florida,2 for a total price of $100,000.00. The optioned lot was basically 250 feet wide, fronting on the east side of U.S. Highway No. 1, and ran back 500 feet in an easterly direction into the Indian -River. At the time, approximately 50 percent of the lot was under water. The 500-foot optioned lot was a part of a lot owned by the joint venture, running 661 feet from the highway to the bulkhead line in the river. The location of the 664-foot lot fronting on the highway and ending at the bulkhead line on the river is well [363]*363illustrated in the drawing reproduced herein which is a portion of a dredge and fill map attached to a United States Army Corps of Engineers dredge and fill permit, dated April 29,1966, issued to the joint venture.

On May '3,1968, the Post Office Department issued an “Advertisement for Bids to Lease Construction” covering the Titusville land; and at approximately the same time, the plaintiff was furnished with a site plan, dated April '3,1968, for construction of the Post Office building. The option was assigned by the Post Office Department to the plaintiff on June 30, 1968. By letter of July 11, 1968, the plaintiff exercised his right to purchase and directed the joint venture to proceed with the fill.3 In June or July, 1968, the joint venture filled the submerged land. The problem which we face in the instant case results from the fact that the joint venture filled not only the submerged land to a point 500 feet in an [364]*364easterly direction from U.S. Highway No. 1, but it continued with the fill another 162 feet, to the bulkhead line in Indian River. This continuation of fill beyond the 500-foot point to the bulkhead line created a parcel of land between plaintiff’s land and the bulkhead line of some 250 feet x 162 feet.

'By an “Amendment To Option To Purchase Land,” dated January 15, 1968, the option was amended to provide that

* * * the work described in the letter dated November 6,1961, from Tom Ellis, Incorporated, agent for the [joint venturers], will be commenced promptly after exercise of the option and will be satisfactorily completed within ninety (90) days after the exercise of the said option, and, further, that the Closing for the property will take place within ten (10) days after such satisfactory completion of the work.

Thus, the plaintiff had notice of the November 6,1967, letter from the joint venture to the Post Office Department, wherein the joint venture agreed to do as follows:

3. The Joint Venturers and/or their assigns will fill and bulkhead in accordance with Corps of Engineer guidelines and will protect the entire site from encroachment by water and that the property line running east to west on the south side of the lot and on the north side will be protected by bulkhead or properly stabilized fill protected by a main bulkhead line at the rwer frontage rwnnmg both north and south from owr property. [Emphasis supplied.]

The work described in this letter was part of the option and, in fact, the closing was not to occur until after the work was completed.

Enclosed with the said letter of November 6, 1967, was a copy of the United States Army Corps of Engineers dredge and fill permit dated April 29, 1966, authorizing the joint venture

* * * to construct a bulkhead, and to dredge and fill, the dredged material to be deposited shoreward of the bulkhead, in Indian River, westerly shore, at your property located about midway between Jackson and Harrison Streets, about 2.2 miles south of State Road 402 Causeway, Titusville, Florida, in accordance with plans attached hereto.

[365]*365A portion of the plan referred to in the permit is the dredge and fill map reproduced earlier in the opinion. An examination of the dredge and fill map and a careful reading of the above quotation from the letter of November 6, 1967, conclusively shows that the plaintiff knew, or should have known, that the joint venturers had a permit to fill the optioned property in question as well as an additional 162 feet of property up to the bulkhead.4

We find additional confirmation for this view in plaintiff’s letter to the joint venture dated July 11, 1968. In relevant part, this letter states:

* * * Consider this your notice that the option is exercised and understand that the work under the option is to be completed within the next ninety (90) days.
❖ * ❖ * *
I would like to be informed as to what schedule you have in doing the fill work as outlined in the drawings and option and the contemplated completion of same. [Emphasis supplied.]

Plaintiff having taken the assignment of the option with actual knowledge of these facts or having documents from which he should have known such facts cannot be heard to complain.

Plaintiff relies heavily on the site plan, dated April 3,1968, [366]*366given to plaintiff before the assignment. It is important that the site plan on its face specifically provided that:

In accordance with option to the Post Office Department, dated May 29, 1967, and subsequent correspondence, including uorps of Engineers requirements, dated April W,1966, optionors are required to construct a hulh-Tiead and to dredge and fill portions of the property located in the Indian River. * * * [Emphasis supplied.]

While it is true that the building site plan indicated the need for warning lamps on the eastern border of the optioned property, it is necessary to keep in mind that the site plan was dated April 3, 1968, while the dredging was not done until June or July, 1968. The Post Office Department was merely prudent to require the navigational lamps. If the joint venture’s remaining parcel of 250 feet x 162 feet were to remain submerged, the lamps would be needed. Much the same may be said with respect to the said building site plan’s depicting of the Indian River as immediately adjacent to the rear boundary of the option land.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Gerald W. Monett v. The United States
419 F.2d 434 (Court of Claims, 1969)

Cite This Page — Counsel Stack

Bluebook (online)
471 F.2d 1221, 200 Ct. Cl. 360, 1973 U.S. Ct. Cl. LEXIS 2, Counsel Stack Legal Research, https://law.counselstack.com/opinion/miller-v-united-states-cc-1973.