Miller v. River Bend Sand & Gravel Co.

516 P.2d 1300, 267 Or. 331, 1973 Ore. LEXIS 307
Oregon Supreme Court·Decided December 13, 1973·Published·Cited by 2 cases

Opinions

PER CURIAM.

This is another case involving the interpretation of the pick-up and delivery provision of ORS 656.154 (3). Plaintiff appeals from a judgment in favor of defendant at the close of supplemental proceedings in which defendant contended that its employee was under the joint supervision and control of plaintiff and defendant’s employer.

The facts are as follows: On July 2, 1970, plaintiff owned a lot and was in the process of building a [333] house for sale! Forms had been constructed for the wall and foundation of a garage and were ready .for concrete to be poured.

Defendant’s employee drove a ready-mix cement truck over to the building site where plaintiff was located. Defendant’s employee backed the truck down the driveway until he could reach the forms with a chute mounted on the back of the truck. With the chute extended to a point above the forms, plaintiff positioned himself on the inside of the forms below the chute. Plaintiff’s employee, Jepson, was on the outside of the forms to keep the concrete, when the pour began, from splashing over the outside of the forms.

Plaintiff had directed the positioning of defendant’s cement truck and gave instructions to the truck driver as to where to pour the cement and how much water to add before pouring. Plaintiff used a board to keep the concrete from flowing downhill when the pour began, as the forms stairstepped down in the direction away from defendant’s truck. Defendant’s employee started the flow of wet concrete into the forms by manipulating the controls on the back of the truck. The truck suddenly began to roll backwards and down hill into the garage area. Plaintiff was struck and severely injured by the chute on the back of the truck. Plaintiff brought this action charging the defendant, through its employee, with negligence in causing the injury.

This case is controlled by Hadeed v. Willamette Hi-Grade Concrete Co., 238 Or 513, 395 P2d 553 (1964). In that case plaintiff, an employee of a building contractor, was injured at the construction site by a ready-mix concrete truck operated by the defendant’s [334] employee. Although there are some factual distinctions between Hadeed and the present case, we do not regard them significant enough to distinguish the cases.

The judgment is affirmed.

Footnotes

Free access — add to your briefcase to read the full text and ask questions with AI

Miller v. River Bend Sand & Gravel Co., 516 P.2d 1300, 267 Or. 331, 1973 Ore. LEXIS 307 (Or. 1973).

516 P.2d 1300 (Miller v. River Bend Sand & Gravel Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Perkins v. Willamette Industries, Inc.
542 P.2d 473 (Oregon Supreme Court, 1975)