Miller v. Chicago, Milwaukee & St. Paul Railway Co.

115 N.W. 269, 103 Minn. 443, 1908 Minn. LEXIS 856
Supreme Court of Minnesota·Decided February 28, 1908·No. Nos. 15,506—(204)·Published·Cited by 1 cases

Opinion

BROWN, J.

Action to recover, for personal injuries caused by the alleged negligence of defendants, in which plaintiff had a verdict, and defendants appealed from an order denying their alternative motion for judgment notwithstanding the verdict or for a new trial.

The record discloses the following facts: "Plaintiff was in the employ of defendant railway company as a pump repairer. The pumps under his control were those used by the company in supplying its locomotives with water, and were stationed at different points along its line of road. Some were operated by gasolene engines, and others by means of windmills. Plaintiff claimed that his duties required him to look after and keep in repair the machinery connected with and which operated the pumps, to oil and keep the same in run[444] ning order, but that he was not charged with any duty respecting the windmill towers or the repairing of platforms thereon. On the day of the accident he was ordered by defendant Catón, chief carpenter of the railway company on this division of the road, with general management of bridges, buildings, and windmills, and the direction and control of pump repairers and other subordinate employees in his department, to repair the windmill at Cresco, Iowa, in complying with which order he received the injuries complained of. This-windmill is of the Aermotor manufacture and sixty five feet in height. The windmill proper is supported by a tower of steel posts, at the top of which, about sixty feet from the ground, is a platform thirty inches square, designed for use by those repairing the fans or machinery of the mill, or when oiling the gearing. The negligence relied upon for recovery consists in the claim that this platform was, and had been for a considerable time prior to the accident, defective and out of repair, in that the bolts and fastenings sustaining it in position had become so worn by long use as to cause the platform to tilt when stepped upon by a person using it; that long prior to the accident the chief carpenter, Catón, had been informed of this condition and had neglected to have proper repairs made.

The evidence tends to show that plaintiff ascended to and stood upon one side of the platform for the purpose of oiling the machinery of the windmill, that it became necessary to pass to the other side to-complete his work, and that when he stepped upon that side the platform tilted or dropped down about two inches by reason of the looseness of its fastenings, causing plaintiff to lose his balance, and that to save himself from falling he grabbed the vane attached to the windmill and his hand was caught in the gearing, resulting in serious injuries. Plaintiff had a verdict for $6,400, which the trial court rediiced to $5,000.

It is contended on this appeal (1) that the evidence is wholly insufficient to justify recovery by plaintiff, and a verdict should have been directed for defendants; and (2) that the court below erred in certain of its instructions to the jury.

1. The performance of plaintiff’s duties on this occasion was attended with more or less danger. He was required to ascend to the [445] top of the windmill, and to occupy a position, while performing his work, upon the platform provided for that purpose. It is apparent from the situation presented that it was essential to the safety of those ■engaged on the platform that it be kept and maintained in suitable •condition for use, and if the platform in question was not in that condition, but was negligently permitted to become out of repair arid in ■a dangerous condition for use, defendant failed in its obligation to ■provide plaintiff a reasonably safe place in which to perform his work, .and he may recover, unless he knew or ought to have known its condition before using it. A careful consideration of the evidence leads to the conclusion that the verdict should not be disturbed.

The evidence tends to show that the platform was out of repair and defective to such an extent that it was not reasonably safe for use by one not knowing its condition. The testimony is that its fastenings were loose, and had been for some seven or eight months prior to the accident. It is not material whether this condition is referable to the iron bolts upon which the platform rested at the points where they were attached to the steel frame, or to the loosening from the natural wear of the wood at the ends projecting through the boards of the platform, or both. The court submitted thé question tp the jury whether the “fastenings” of the platform were loose, ■and did not confine them to any particular fastening. A defect in either respect would sustain the finding of the jury that the platform was out of repair. ' Plaintiff testified that the platform tilted when he stepped upon it by reason of the looseness of the fastenings, .and in his claim that the fastenings were loose he was corroborated by witness Pawling, a former employee of defendant company, who had been engaged in the work of pump repairing upon this line of road. This witness testified that he was familiar with this particular windmill, and that it was out of repair in the respect stated, and that the platform tipped when stepped upon by reason of the fact that the holts fastening the same to the tower had worn themselves loose to such an extent as to cause it to wabble, and, further, that the fastenings had always been loose, and that he had called the attention of ■Catón, the chief carpenter of the road, to- the fact seven months be[446] fore the accident, and requested him to make proper repairs and put the platform and tower in suitable condition for use. On the other hand, the evidence offered by defendants tends strongly to show that the platform was in no way defective or out of repair, that it was in the usual condition of such appliances, and reasonably safe for those accustomed to performing work about such places. This evidence was for .he consideration of the jury, and the pivotal question -was submitted to them under fair instructions from the trial court; and, the evidence being conflicting, the verdict should not, under the rule guiding this court in such cases, be disturbed.

Free access — add to your briefcase to read the full text and ask questions with AI

Miller v. Chicago, Milwaukee & St. Paul Railway Co., 115 N.W. 269, 103 Minn. 443, 1908 Minn. LEXIS 856 (Mich. 1908).

115 N.W. 269 (Miller v. Chicago, Milwaukee & St. Paul Railway Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Lagerman v. Casserly
120 N.W. 1086 (Supreme Court of Minnesota, 1909)