Michael T. Lewis, Sr. and Pauline S. Lewis v. Atmos Energy Corporation

CourtDistrict Court, N.D. Mississippi
DecidedMarch 27, 2026
Docket4:24-cv-00076
StatusUnknown

This text of Michael T. Lewis, Sr. and Pauline S. Lewis v. Atmos Energy Corporation (Michael T. Lewis, Sr. and Pauline S. Lewis v. Atmos Energy Corporation) is published on Counsel Stack Legal Research, covering District Court, N.D. Mississippi primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Michael T. Lewis, Sr. and Pauline S. Lewis v. Atmos Energy Corporation, (N.D. Miss. 2026).

Opinion

IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF MISSISSIPPI GREENVILLE DIVISION

MICHAEL T. LEWIS, SR. and PLAINTIFFS PAULINE S. LEWIS

v. No. 4:24-cv-00076-MPM-JMV ATMOS ENERGY CORPORATION DEFENDANT

MEMORANDUM OPINION This matter comes before the Court on Defendant Atmos Energy Corporation’s (“Atmos Energy”) Motion for Partial Summary Judgment [118]. Plaintiffs’, Michael T. Lewis, Sr. and Pauline S. Lewis (collectively “the Lewises”), have responded in opposition to the motion [130]. The Court, having reviewed the record and applicable case law, is now prepared to rule. RELEVANT BACKGROUND Atmos Energy owns natural gas pipelines in Friars Point, Mississippi, one of which runs through farmland owned by the Lewises. This case arises from negotiations, contracts, and repairs following the Lewises’ discovery of the gas pipeline (subsequently “the Pipeline”) under the incorrect side of their property. The Lewises purchased the farmland in 1999, and they were aware of the Pipeline mentioned in a 1956 easement, as being located on the west side of McKee Road. The Pipeline runs for approximately 7,270 feet under the Lewises’ land. On October 15, 2015, Atmos Energy acquired the Pipeline from Friars Point which included the existing easement for the Pipeline on the Lewises’ property. In 2023, the Lewises discovered the Pipeline emerging from the soil on the east side of McKee Road. As a result, they found that the Pipeline was unknowingly located underneath their farmland which they leased to Coldwater Planting Company. The Lewises contacted Atmos Energy about the misplaced pipeline and the parties entered into a settlement agreement. As per the settlement agreement, Atmos Energy paid the Lewises for an easement and right-of-way to the Pipeline, a release for any claims they may have regarding the Pipeline’s presence on the east side of their property, and the agreement required that Atmos Energy repair or replace the Pipeline located within the easement and “remove any exposed natural gas pipeline abandoned from any repair or replacement” so as not to interfere with their farming operations by April 1, 2024. [130]

Ex. 5. Atmos Energy performed the repair by replacing an over 1,200-foot segment of the Pipeline and abandoned-in-place the removed segment. The Lewises argue that by not removing the old pipeline and by allegedly not completing the work by April 1, 2024, that Atmos Energy breached the contract. Additionally, the Lewises subsequently discovered that approximately 60% of the Pipeline on their property was located outside of the tract of land outlined in the easement and that other sections of the Pipeline were exposed on their property interfering with farming operations despite Atmos Energy’s contractual duty to repair or replace the Pipeline. The Lewises then sued Atmos Energy for breach of contract, fraudulent inducement, and a multitude of tort

claims. Atmos Energy filed a counterclaim for prescriptive easement in response. Atmos Energy moves to dismiss most of the Lewises’ claims against them. STANDARD OF REVIEW Summary judgment is proper “if the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.” Fed. R. Civ. P. 56(a). A genuine dispute as to material fact exists “if the evidence is such that a reasonable jury could return a verdict for the nonmoving party.” Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 258 (1986). A fact is “material” if its resolution in favor of one party may affect the outcome of the case. See Saketkoo v. Adm’rs of Tulane Educ. Fund, 31 F.4th 990, 997 (5th Cir. 2022) (citing Hamilton v. Segue Software Inc., 232 F.3d 473, 477 (5th Cir. 2000)). At the summary judgment stage, “the court must draw all reasonable inferences in favor of the nonmoving party, and it may not make credibility determinations or weigh the evidence.” Reeves v. Sanderson Plumbing Prods., 530 U.S. 133, 150 (2000). If a moving party shows that there is no genuine dispute as to any material fact and that it is entitled to judgment as a matter of law, the nonmoving party “must come forward with specific facts showing a genuine factual issue for trial.” Harris ex rel. Harris v.

Pontotoc Cnty. Sch. Dist., 635 F.3d 685, 690 (5th Cir. 2011). “[A] party cannot defeat summary judgment with conclusory allegations, unsubstantiated assertions, or ‘only a scintilla of evidence.’” Turner v. Baylor Richardson Med. Ctr., 476 F.3d 337, 343 (5th Cir. 2007) (quoting Little v. Liquid Air Corp., 37 F.3d 1069, 1075 (5th Cir. 1994)). “If the nonmoving party fails to meet this burden, the motion for summary judgment must be granted.” Little, 37 F.3d at 1076. ANALYSIS Atmos Energy’s motion asserts that the Lewises’ claims against them fail to raise a genuine dispute of material fact outside of the breach of contract claim pertaining to whether Atmos Energy performed the contracted work on or before April 1, 2024. As a result, the Court will analyze whether Atmos Energy is entitled to summary judgment for the Lewises’ other claims. I. Breach of Contract Claim

Atmos Energy asserts that the Lewises’ breach of contract claim should be limited in its scope. They argue that the allegations claiming Atmos Energy breached the contract by leaving the abandoned pipe on the Lewises’ property and by failing to remove and replace the entirety of the pipeline on the property should be dismissed as a matter of law. Atmos Energy claims that these allegations are subject to summary judgment because Atmos Energy’s conduct to repair the Pipeline was within the parameters of the contract and does not constitute a breach, and that the only breach in dispute is the timing of their work rather than the work itself. Under Mississippi law, to establish breach of contract, the plaintiff must show “(1) the existence of a valid and binding contract, and (2) a showing that the defendant has broken, or breached it.” Maness v. K & A Enters. of Mississippi, LLC, 250 So. 3d 402, 414 (Miss. 2018) (citing Bus. Commc'ns, Inc. v. Banks, 90 So.3d 1221, 1224 (Miss. 2012)). “A breach is material where there is ‘a failure to perform a substantial part of the contract or one or more of its essential

terms or conditions, or if there is such a breach as substantially defeats’ the purpose of the contract.” Ferrara v. Walters, 919 So. 2d 876, 886 (Miss. 2005) (quoting Gulf S. Cap. Corp. v. Brown, 183 So.2d 802, 805 (Miss. 1966)). Atmos Energy argues that the Lewises’ breach of contract claim fails because the Right-of-Way and Easement expressly states that Atmos Energy has “the right to...abandon-in-place...one or more gas pipelines, service lateral and extensions thereto.” [118] (citing [93] Ex. 9). Atmos Energy asserts that any abandonment of the Pipeline was within the scope of the right-of-way which is insufficient to establish a breach of contract.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Little v. Liquid Air Corp.
37 F.3d 1069 (Fifth Circuit, 1994)
Hamilton v. Segue Software Inc.
232 F.3d 473 (Fifth Circuit, 2000)
Turner v. Baylor Richardson Medical Center
476 F.3d 337 (Fifth Circuit, 2007)
Anderson v. Liberty Lobby, Inc.
477 U.S. 242 (Supreme Court, 1986)
Harris Ex Rel. Harris v. PONTOTOC COUNTY SCHOOL
635 F.3d 685 (Fifth Circuit, 2011)
Reeves v. Sanderson Plumbing Products, Inc.
530 U.S. 133 (Supreme Court, 2000)
Whitaker v. T & M FOODS, LTD.
7 So. 3d 893 (Mississippi Supreme Court, 2009)
Ferrara v. Walters
919 So. 2d 876 (Mississippi Supreme Court, 2005)
Gulf South Capital Corporation v. Brown
183 So. 2d 802 (Mississippi Supreme Court, 1966)
Phyllis Maness v. K & A Enterprises of Mississippi, LLC
250 So. 3d 402 (Mississippi Supreme Court, 2018)
Business Communications, Inc. v. Banks
90 So. 3d 1221 (Mississippi Supreme Court, 2012)
Saketkoo v. Admin Tulane Educ
31 F.4th 990 (Fifth Circuit, 2022)

Cite This Page — Counsel Stack

Bluebook (online)
Michael T. Lewis, Sr. and Pauline S. Lewis v. Atmos Energy Corporation, Counsel Stack Legal Research, https://law.counselstack.com/opinion/michael-t-lewis-sr-and-pauline-s-lewis-v-atmos-energy-corporation-msnd-2026.