Metallograph Corp. v. Arma Engineering Co.

205 A.D. 100, 199 N.Y.S. 347, 1923 N.Y. App. Div. LEXIS 4957
Appellate Division of the Supreme Court of the State of New York·Decided April 20, 1923·Published·Cited by 6 cases

Opinion

Smith, J.:

It appears that the defendant had some government contract by which it was to furnish certain aeronautical instruments. A part of those instruments consisted of certain rings which were to be cut in a certain way and which were to have certain scales thereupon. The defendant made a contract with the plaintiff for the furnishing of these rings, providing for the furnishing of 200 sets absolutely and 4,800 sets thereafter contingently. It seems that in order to make these rings it was necessary to make tools and dies, and, therefore, it was provided that for the first 200 for which an absolute contract was made they should charge sixty-seven dollars and fifty cents a set, and for all amounts ordered up to the 4,800 they should charge four dollars and fifty cents a set. The plaintiff proceeded to make these tools and dies and had completed them and had nearly completed some of the rings which were to be manufactured under the contract, when the defendant sent to the plaintiff a letter from the Director of Aircraft Production, directing the defendant to limit the production upon the order for these navigation sets to ten. This letter was sent by the defendant to the plaintiff, although the defendant did not cancel any part of its contract, other than may be inferred from the sending of this letter. It will be noted that the plaintiff had no contract with the Director of Aircraft Production, but simply [102] had its contract with the defendant, and there is evidence to the effect that the defendant said that however much was needed by the government, there would be a market for these instruments and thereupon the contract was made for 200 sets absolutely and contingently for the balance up to 5,000 sets.

After this letter from the Director of Aircraft Production, which was forwarded to the plaintiff, and upon February 17, 1919, the defendant wrote to the plaintiff as follows: We have received instructions from the Bureau of Aircraft Production to proceed with the completion of special tools, dies, jigs and fixtures for the manufacture of the McKnight Aerial Navigation Sets, the work upon which was recently suspended by order of that Bureau.

They can give us at the present time no definite information as to the quantity of equipments they will desire, but assure us they will place an order for some of these equipments, and at their request we have submitted quotations .on lots of 500 and 1,000. They further state that by the time we have tools and special fixtures completed they will have determined the number of equipments they will, purchase.

It is therefore requested that you resume the manufacture of tools for the parts covered by our order #2347 to you; also furnish us with an estimate of the cost involved in the manufacture of these special tools, dies, jigs and fixtures. Kindly advise us by return mail when you expect to have tools completed.”

To this letter of February seventeenth, the plaintiff replied, upon February eighteenth:

Gentlemen.— We have come into possession of your favor of the 17th inst., from which we note with pleasure that you have received instructions from the Bureau of Aircraft Production to proceed with the manufacture of the McKnight Aerial Navigational sets, and that you have submitted now new quotations on lots of 500 and 1,000.
“ From the three sets handed to you yesterday by our Mr. Newell, you will note that our die and tool work, as well as that of the graduations, is completely finished and the bill rendered to you under date of Feb. 15th shows you that there will be no additional charge to you beyond the amount of $13,400 which includes delivery of 200 sets in accordance with your order of Jan. 15th, as amended in your letter to us of Jan. 16th.
Awaiting your further instructions, we beg to remain,
“ Yours very truly.”

The court submitted to the jury the question as to whether this contract had been rescinded and the jury found for the [103] plaintiff. The court thereupon set aside the verdict and ordered a new trial.

I think the order was wrong and should be reversed and the verdict reinstated. The contract was not made upon a contingency of any contract between the defendant and the government, but was an absolute contract for the manufacture of 200 sets upon which the price was so fixed as to include the cost of manufacturing tools and dies. The reduction of the amount by the Aircraft Bureau to ten sets was a matter with which the plaintiff was not concerned.

There is no act shown in this case to the effect that this original contract was ever canceled or intended to be canceled by - the defendant. When the letter from the Bureau of Aircraft Production was forwarded to the plaintiff there was no direction to stop production of the 200 sets as called for by the contract. Two hundred sets were then made by the plaintiff. Three of these sets were forwarded to the defendant upon the fifteenth of February with a bill for the entire 200 sets. There is no letter making complaint of that bill or making claim that the original contract was canceled and the plaintiff might well have considered its importance simply as bearing upon the remaining 4,800 sets which were to be produced only as ordered by the defendant.

Free access — add to your briefcase to read the full text and ask questions with AI

Metallograph Corp. v. Arma Engineering Co., 205 A.D. 100, 199 N.Y.S. 347, 1923 N.Y. App. Div. LEXIS 4957 (N.Y. Ct. App. 1923).

205 A.D. 100 (Metallograph Corp. v. Arma Engineering Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Strychalski v. Mekus
54 A.D.2d 1068 (Appellate Division of the Supreme Court of New York, 1976)
Associated Food Stores, Inc. v. Siegel
10 A.D.2d 1003 (Appellate Division of the Supreme Court of New York, 1960)
Frank Associates, Inc. v. John J. Ryan & Sons, Inc.
281 A.D. 665 (Appellate Division of the Supreme Court of New York, 1952)
Rogers-Pyatt Shellac Co. v. Starr Piano Co.
212 A.D. 792 (Appellate Division of the Supreme Court of New York, 1925)