Matter of EZ Properties, LLC v. City of Plattsburgh

128 A.D.3d 1212, 9 N.Y.S.3d 440
Appellate Division of the Supreme Court of the State of New York·Decided May 14, 2015·No. 519924·Published·Cited by 5 cases

Opinion

Garry, J.

Appeal from a judgment of the Supreme Court (Muller, J.), entered December 31, 2013 in Clinton County, which, in a proceeding pursuant to CPLR article 78, dismissed the petition.

In 2011, petitioner applied to the Planning Board of respondent City of Plattsburgh for site plan approval to develop an apartment complex. The plans were approved with a stipulation requiring the use of exterior brick veneer in a color that matched neighboring buildings. In 2012, after revising the construction plans, petitioner filed a new application for site plan approval and submitted architectural drawings indicating that the exterior would be “V2 Brick Veneer Siding” and that the veneer material would be “Boral Stone Products Cultured Stone Brick Veneer ‘Antique Red.’ ” In April 2012, the Planning Board issued a letter that conditionally approved the site plan *1213 and specifically referenced the architectural drawings as part of the approved plan. 1

Upon commencing construction, petitioner used an alternate veneer material instead of the Boral Stone material. In August 2012, respondent Joseph McMahon — the City Building Inspector — wrote to petitioner advising it to discontinue use of the alternate material, and directing petitioner either to use the specified material or obtain approval for a modification from the Planning Board. Petitioner refused to comply and continued to install the alternate material. In September 2012, a City representative advised petitioner that the City considered the requirement to use the Boral Stone material to be valid and enforceable. Thereafter, in October 2012, the City informed petitioner that a certificate of occupancy would not be issued unless the Boral Stone was installed or petitioner posted financial security. Petitioner posted the security, signed a completion agreement and was issued a certificate of occupancy.

In January 2013, petitioner commenced this CPLR article 78 proceeding challenging respondents’ authority to require the specified veneer and seeking, among other things, an order directing the issuance of an unconditional certificate of occupancy. Supreme Court dismissed the petition as time-barred under CPLR 217 (1). Petitioner appeals.

A proceeding pursuant to CPLR article 78 “must be commenced within four months after the determination to be reviewed becomes final and binding upon the petitioner” (CPLR 217 [1]; see Matter of Thornton v Saugerties Cent. Sch. Dist., 121 AD3d 1253, 1254 [2014]). Supreme Court found the petition to be untimely because it was not filed within four months after the Planning Board’s April 2012 approval of the site plan. Petitioner argues that the court erred, as the proceeding was timely filed within four months after the City refused to issue an unconditional certificate of occupancy, and it is this determination that is at issue. However, “[a]n administrative determination is considered final and binding when an agency has reached a definitive position on the issue that inflicts actual, concrete injury and administrative remedies have been exhausted” (Matter of Selective Ins. Co. of Am. v State of N.Y. Workers’ Compensation Bd., 102 AD3d 72, 76 [2012] [internal quotation marks and citation omitted]). Here, six of the petition’s eight causes of action — although phrased as challenges to the City’s failure to issue an unconditional certificate of occupancy — are, in substance, challenges to the validity and *1214 enforceability of the Planning Board’s requirement that the Boral Stone material be used. Petitioner was aggrieved by this requirement when it was included in the Planning Board’s site plan approval in April 2012 and not, as it contends, when petitioner’s refusal to comply subsequently led to the withholding of an unconditional certificate of occupancy (see Matter of Loparco v Napierala, 96 AD3d 1213, 1214 [2012]; Matter of Save the Pine Bush v Town Bd. of Town of Guilderland, 272 AD2d 689, 692 [2000]).

We reject petitioner’s contention that the site plan approval was not final and binding because it was ambiguous in that the drawings specified the use of both “V2 Brick Veneer Siding” and the Boral Stone material. Petitioner’s representative attended several Planning Board meetings in February and March 2012 at which materials and colors for the building exterior were discussed, and brought samples of various siding materials. During these meetings, the representative specifically advised the Planning Board that 3 U [inch] real brick” would be used on the exterior, and obtained verbal approval from Planning Board members for a particular sample of this brick — apparently the Boral Stone material. 2 After these meetings, petitioner submitted the drawing — dated April 2, 2012 — in which the Boral Stone specification appears. The record thus fails to support this argument.

The City’s September 2012 letter indicated that no determination had yet been made as to whether to withhold the certificate of occupancy, but this did not constitute a de novo review by the Planning Board, and did not result in a lack of finality (see Matter of Boston Culinary Group, Inc. v New York State Olympic Regional Dev. Auth., 18 AD3d 1103, 1104-1105 [2005], lv denied 5 NY3d 712 [2005]). Nor did this letter serve to toll or extend the limitations period (see Matter of Pettus v New York State Ins. Dept., 93 AD3d 1067, 1068 [2012], lv denied 19 NY3d 814 [2012]). Thus, we agree with Supreme Court that the petition was not filed within four months after the site plan approval became final and binding, and these causes of action were untimely. 3

Free access — add to your briefcase to read the full text and ask questions with AI

Matter of EZ Properties, LLC v. City of Plattsburgh, 128 A.D.3d 1212, 9 N.Y.S.3d 440 (N.Y. Ct. App. 2015).

128 A.D.3d 1212 (Matter of EZ Properties, LLC v. City of Plattsburgh) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Matter of Hoffmann v. New York State Ind. Redistricting Commission
217 A.D.3d 53 (Appellate Division of the Supreme Court of New York, 2023)
Matter of Duffy v. Town of Guilderland
2020 NY Slip Op 05108 (Appellate Division of the Supreme Court of New York, 2020)
Walker v. Sullivan
148 A.D.3d 1379 (Appellate Division of the Supreme Court of New York, 2017)
Jimenez v. New York State Department of Taxation & Finance
143 A.D.3d 1221 (Appellate Division of the Supreme Court of New York, 2016)