Marino v. Pennsylvania Railroad

119 A.2d 836, 180 Pa. Super. 179, 1956 Pa. Super. LEXIS 543
Superior Court of Pennsylvania·Decided January 17, 1956·No. Appeal, No. 159·Published

Opinion

Opinion by

Ross, J.,

This is a trespass action involving a grade crossing collision between plaintiff’s automobile and defendant’s freight train. After a jury verdict for the plaintiff for damages to his automobile, the defendant’s motion for judgment n.o.v. was refused and it took this appeal. The only question involved is whether the negligence of the defendant was shown.

At 9 o’clock on the night of November 11, 1950, a clear moonlight night, the plaintiff and his wife started across the Morgan Street railroad crossing in Bracken-ridge, Pennsylvania. The road was clear and visibility very good. Through no fault of plaintiff’s his car stalled on the tracks of the defendant, and for several minutes, he attempted, unsuccessfully, to start the motor. The crossing signal lights began blinking, indicating the approach of a train, so plaintiff’s wife left the car and proceeded up the track, wearing white gloves and a white headdress, and began flagging down the train. Plaintiff left the vehicle soon after and followed her up the track for a distance of about forty feet and he began signalling also. He saw the train when it was about 2000 feet away from the ■ crossing and at that time it was proceeding at about 35 to 40 miles an hour. When the distance narrowed to 1500 feet, the train slowed to about 20 miles an hour speed [181] and when it was ahont 40 feet from the crossing the plaintiff heard a “grinding noise” of the wheels. The train proceeded, however, struck and damaged plaintiff’s car, and came to a final halt 400 feet beyond the crossing. The engine’s headlight was lit as were the lights on plaintiff’s car and the track for approximately 900 feet is practically straight as it approaches the crossing.

The plaintiff was obliged to provide the jury with sufficient evidence to conclude that the defendant’s engineer saw, or by due diligence should have seen, his vehicle stalled upon the track while the train was of sufficient distance away from the crossing that it could have been stopped before reaching the point of collision. Tallman v. Reading R. Co., 117 Pa. Superior Ct. 148, 177 A. 228. Examined against this standard, the evidence, viewed in a light most favorable to plaintiff, giving him the benefit of every reasonable inference (Stoner v. Penn-Brixite, Inc., 177 Pa. Superior Ct. 189, 110 A. 2d 904), indicates ample factual basis for the jury’s conclusion of negligence on the part of the defendant. The crossing is located in a populated area, and is approached by the train from around a curve which straightens out about 900 feet distant. It is visible to the engineer for at least this distance and probably slightly more as the engine rounds the bend. Whether it was because he saw the stalled car or from his ordinary caution as he approached the crossing, the engineer slackened from a speed of 40 miles an hour to 20 miles an hour when still 1500 feet away. He proceeded at this rate of speed until within 40 feet of the crossing when the plaintiff heard the “grinding noise” of the wheels. The jury could well infer that this was the application of the full brakes too late, of course to prevent the collision, but sufficient to stop within 440 feet, and that the train could have been stopped [182] before reaching the crossing by application of the brakes 1500 feet away or at latest, 900 feet away when the engine entered the straight approach to the crossing which was in clear view of the engine’s headlamp.

The very physical nature of this crossing with its straightaway approach, coupled with the weather condition and the clear visibility sufficiently indicates that the engineer could and should have seen the car while at least 900 feet away. Under these circumstances, if he did not see it, he simply was not looking. It is precisely this situation which distinguishes this case from Grotefend v. Pennsylvania R. R. Co., 380 Pa. 439, 441, 110 A. 2d 362; Veres v. Pennsylvania R. R. Co., 161 Pa. Superior Ct. 177, 181, 54 A. 2d 77; Tallman v. Reading Company, 117 Pa. Superior Ct. 148, 154, 177 A. 228; and Guyler v. Lehigh Valley R. R. Co., 165 Pa. Superior Ct. 196, 198, 67 A. 2d 575, cited by appellant, in each of which cases the plaintiff failed to show any circumstances indicating that the engineer saw or could and should have seen the stalled vehicle while still at sufficient distance to stop. In the Grotefend case, the plaintiff’s witnesses testified that there was a curve in the track and that the view was obstructed by other cars; the Veres case involved a clear track of only 500 feet on a foggy, drizzling night and the plaintiff’s vehicle was wedged against a snowbank with but one headlight visible. In the Tallman case, there was a clear view from the engine of from only 300 to 550 feet while plaintiff’s own expert testified that the train would require at least 450 to 500 feet in which to stop, and we held such margin too narrow to infer negligence on the part of the engineer; and in the Guyler case, the crossing was located in open country, the speed of the train was reasonable under the circumstances, it was a dark and misty night, and the plaintiff’s stalled vehicle was not in a position to [183] be easily seen. In contrast, the engineer here had the opportunity of a clear view.

Free access — add to your briefcase to read the full text and ask questions with AI

Marino v. Pennsylvania Railroad, 119 A.2d 836, 180 Pa. Super. 179, 1956 Pa. Super. LEXIS 543 (Pa. Ct. App. 1956).

119 A.2d 836 (Marino v. Pennsylvania Railroad) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Grotefend v. Pennsylvania Railroad
110 A.2d 362 (Supreme Court of Pennsylvania, 1955)
Stoner v. Penn-Brixite, Inc.
110 A.2d 904 (Superior Court of Pennsylvania, 1955)
Rhinehart v. Jordan
169 A. 151 (Supreme Court of Pennsylvania, 1933)
Broad v. Pennsylvania R. R. Co.
55 A.2d 359 (Supreme Court of Pennsylvania, 1947)
Doran v. Pittsburgh Railways Co.
22 A.2d 826 (Supreme Court of Pennsylvania, 1941)
Veres v. Pennsylvania Railroad
54 A.2d 77 (Superior Court of Pennsylvania, 1947)
Guyler v. Lehigh Valley Railroad Co.
67 A.2d 575 (Superior Court of Pennsylvania, 1949)
Naugle v. Reading Company
21 A.2d 109 (Superior Court of Pennsylvania, 1941)
Tallman v. Reading Company
177 A. 228 (Superior Court of Pennsylvania, 1934)
Donegal Township School District v. Crosby
90 A.2d 341 (Superior Court of Pennsylvania, 1952)