Louisville & Nashville Railroad v. McKenna

81 Tenn. 280
CourtTennessee Supreme Court
DecidedApril 15, 1884
StatusPublished

This text of 81 Tenn. 280 (Louisville & Nashville Railroad v. McKenna) is published on Counsel Stack Legal Research, covering Tennessee Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Louisville & Nashville Railroad v. McKenna, 81 Tenn. 280 (Tenn. 1884).

Opinion

Cooper, J.,

delivered the opinion of the court.

The McKennas recovered judgmeni against the railroad company for injuries to the wife as a passenger [281]*281on the company’s train, occasioned by the cars being thrown from the track by an obstruction put thereon by an unknown person. Upon the appeal in error of the company, the Referees report in favor of affirmance. The company except to the report, their exceptions going to the law of the charge.

The accident occurred to a regular passenger train at a trestle on mile 60 of the road, about half after five o’clock in the morning of November 12, 1873. The obstruction was caused by placing a T rail diagonally across the track about midway of a trestle, one end being under the South rail of the road-way and the other end resting on the North rail, and braced on both sides by cross-ties. The proof is conflicting as to whether the morning was clear, or dark, cloudy and foggy. The engineer saw the obstruction about seventy-five or eighty feet before the train struck it. The train was moving at between eight and ten miles an hour, the air-brakes having been applied, and the speed of the train slackened before reaching the trestle in obedience to an order of the superintendent, which was to slow up. run carefully and keep a sharp lookout at mile 60. This order of the superintendent had been given because six weeks before that time a similar accident had occurred at the • same trestle. And the employes admit that they were acting on the' order as still in1 force. The instruction of the trial judge to the jury complained of related to the duly of the engineer, in consequence of the order mentioned.

-The charge objected to is: “But- if the evidence shows that the obstruction was put on the track by [282]*282a stranger, and further shows that by reason of a previous accident at the same place from a similar cause-a short time before, the engineer had been warned to ‘slow up’ when approaching this trestle, and to keep-a sharp lookout ahead, and he failed in either of these duties, or failed to slow up enough to stop his-train on short notice when it was possible for him to do so; in other words, failed to prepare as fully as possible for the emergency which he was warned might arise at the place of the accident, and by reason of such failure was unprepared to stop quickly his-train when the emergency did arise of which he had been forewarned, and the accident occurred by reason of such failure, I charge you to find for the plaintiff.”’

The company requested the court to add to the charge quoted above the following qualification: “But if you believe from the testimony that the order to slow up and keep a sharp lookout meant that the engineer should reduce the speed of the train to ten,, fifteen or twenty miles per hour; or if you believe from the testimony that the order in this case was to reduce the speed of (he train to ten or fifteen miles an hour, and keep a sharp 1 >okout, and that the engineer obeyed the order, then the defendant would not be liable, although the engineer did not reduce his speed to a point below the order, so as fully'to prepare for the emergency that actually occurred.”

The company also requested the trial judge to give the following instruction: “If the jury believe that said order was a proper and prudent order and regulation for the running of the passenger train at the [283]*283time and place of said accident, and that the same' was properly obeyed by the engineer in its true sense- and meaning by slowing up to a speed not exceeding-ten miles an hour, running carefully and keeping a sharp lookout at the time and place of the accident and further, that the accident was occasioned by an obstruction maliciously placed on the track by some third person unknown, and that the same was seen by the engineer as soon as it was possible to see it, and that then every means in his power were promptly used to prevent an accident, the jury should find for the defendant. It was not, as a question of law, the duty of the engineer, in the circumstances supposed, to stop whenever he approached the space covered by said order, or to reduce the speed of his train so that it could be instantly stopped at any moment while passing over said space. But it is for the jury to say from the evidence whether what was done by the engineer was sufficient to relieve the company from the slightest imputation of negligence.” These requests were-refused.

The Referees say: “ On the part of the plaintiffs in error, it is insisted that negligence in reference to the failure to slow up could only be predicated of disobedience to the order, and inasmuch as the plaintiffs in error proved that to 'slow up’ in railroad orders meant to reduce speed to ten, fifteen dr twenty miles per hour, that the charge of the judge, imposing upon the engineer a duty far more stringent than the order,, was erroneous. This objection undertakes to limit the-issue to the letter of the order. The charge was cor[284]*284rect. If they in whose employment the engineer was, for any reasons satisfactory to themselves, anticipated an accident at a given point, or gave special instructions for care at a given point, in consequence- of past or apprehended accidents, so as to bring home to him notice of the necessity of extra precaution at the place indicated, it is not error to charge that his precautions must be such as might arrest an anticipated danger, although they exceeded the letter of his order from the company. For under the circumstances producing, and as now „ appears justifying the order, • it was the proper duty of the company not only to issue an order for such precaution, but it was equally its -duty through the engineer, to enforce it in its full spirit and intent, the avoidance of the danger feared, by taking such control of the train by the use of brakes, slackening speed, etc., as would effectuate the object intended, and enable him to stop the train on short notice.”

It is not contended that the mere fact that a similar accident had occurred at the same place, six weeks before, would of itself impose upon the railroad company any particular duty in running its trains over that part of the road. There is no presumption that because an obstruction has been maliciously put upon the track of a railroad at one place, a similar obstruction will afterwards be put at the same place, or for that matter on any other part of the road. The law never presumes the occurrence, much less the recurrence of an illegal act, and human experience would ■scarcely sustain the conclusion that the same crime will be repeated in the same place. While this pre[285]*285cise point seems never to have passed into judgment, it has been held that a railway company is not liable for an injury inflicted by a stray dog at their station, although a few hours before it had there bitten another person, if it was then driven away: Smith v. Great Eastern Railroad Company, L. R., 2 C. P., 1. It must be left to the railroad company to determine what directions, if any, it will give its employes under the circumstances of the particular case, under the usual rule which regulates the duties of the company to the public. If the company undertakes to give special instructions to its employes at the time, these instructions must be the measure of the action of the employes.

Free access — add to your briefcase to read the full text and ask questions with AI

Cite This Page — Counsel Stack

Bluebook (online)
81 Tenn. 280, Counsel Stack Legal Research, https://law.counselstack.com/opinion/louisville-nashville-railroad-v-mckenna-tenn-1884.