WALLACE, Circuit Judge.

This is a writ of error by both defendants in the court below to review a several judgment for the plaintiff against each, entered upon the verdict of a jury. By the verdict the jury found against the defendant the Leroy & Caney Valley Air-Line Railroad Company in the sum of $23,414, exclusive of interest, and against the defendant the Missouri Pacific [28]*28Railway Company in tlie sum of $41,238, exclusive of interest; and thereupon judgment in favor of the plaintiff was entered against each defendant for the amount of the verdict against each. The action was founded on a written contract made by one Loss, and assigned by him to Sidell & Simmons, with the two companies. Under this contract, Sidell & Simmons became contractors to build a railway for the Leroy & Caney Valley Air-Line Railroad Company (hereafter called the “Leroy Company”), from a point in Wilson county, Kan., to or near Elgin, Chautauqua county, near the south line of the state. By the terms of the contract, the railroad was to be a single-track road, with grades to be not over 56 feet per mile, and curves not less than 6 degree curvature; and all work was to be subject to the approval of the engineer of the Missouri Pacific Railway Company. The Leroy Company, on its part, agreed to execute bonds to the amount of $10,000 per mile, to be secured by a first mortgage on its property, and pay over the same and all its ' capital stock, together with all township local-aid bonds received by it, to the contractors, as a consideration for the construction of the railroad, the payment of first mortgage bonds to be made in full for each five miles of road, as the same should be completed, and payments of the township aid bonds to be made as soon as the conditions upon which they were voted should be complied with. , The Missouri Pacific Railway Company agreed on its part to execute a guaranty upon the back of all the first mortgage bonds, as each lot thereof should be issued at the completion of each five miles of road, for the payment of the principal and interest of said bonds. The contract also required the contractors.to deliver to the Missouri Pacific Railway Company all the stock of the Leroy Company received by them under the contract, except so much, not exceeding in amount $250,000, as it might be necessary for them to deliver, to townships for local aid granted by them. It reserved to the Missouri Pacific Railway Company the right to complete the railroad in case of failure of the contractors to do so seasonably, and in that event to receive in payment all first mortgage bonds, capital stock, and local-aid bonds which would otherwise be due to the contractors.

The complaint is framed upon the legal theory that both defendants were liable for extra work done by Sidell & Simmons in laying side tracks upon a portion of the railway which had been built by the contractors, and accepted by the defendants; and also for damages for a breach of the contract, whereby Sidell & Simmons were prevented from completing the unfinished part of the railroad. The complaint also alleged that the Leroy Company had refused to deliver to the contractors certain township aid bonds, those of Washington township, in the sum of $18,000, which had been earned under the terms of the contract. Upon the trial the court ruled that the Missouri Pacific Railway Company was not liable for the claim in respect to the Washington township bonds, nor for the extra work done in the construction of side tracks, and instructed the jury that any recovery upon these items was to be included in a separate verdict against the Leroy Company. The [29]*29verdict against that company seems to ha.ve been based exclusively upon these claims. In respect to the cause of action for breach of contract whereby Sidell & Simmons were prevented from completing a part of the railroad, evidence was given upon the trial that in October, 1886, while the first 52 miles of the railroad were in process of construction, the remaining portion of the road having been located and graded in places, Mr. Gould, the president of the Missouri Pacific Railway Company, notified them that the road must stop at Peru Junction, and that the Missouri Pacific Railway Company would guaranty no bonds deliverable for construction beyond that place; that thereupon the contractors had a conference with the directors of the Leroy Company, and the result was a notification from them to the contractors that they would have to abide by the orders of Mr. Gould in reference to the completion of the road; and that thereupon, inasmuch as the contractors were to be deprived of the benefit of the guaranty of the bonds by the Missouri Pacific Railway Company, they abandoned the building of the road beyond Peru Junction. Evidence was also given to show what it would have cost the contractors to build the road to the original terminus, and of the market value of the township aid bonds which, they would have received had it been completed pursuant to contract. The verdict against the Missouri Pacific Railway Company was based exclusively upon this cause of action.

We are not called upon by any exceptions taken at the trial to consider the question whether there was any liability on the part of the Missouri Pacific Railway Company to the plaintiff, under the contract, for the profits which would have inured to the contractors if the contract had been fully performed; nor the further question whether it was proper to permit a recovery against one defendant upon one or more causes of action, and against another for a different cause of action, in an action at law, where the defendants were sued for a joint liability; nor, inasmuch as there has been no motion made to dismiss the writ of error*, are we called upon to consider the question whether a writ of error taken by both defendants jointly, to review a several judgment against each, is correct practice. Many of the assignments of error have not been argued or noticed in the brief of counsel for the plaintiff in error, and, in disposing of the case, we shall not deem it necessary to refer to those which have been thus ignored.

The only exceptions taken upon the trial by the defendant, aside from those respecting the admission of testimony, relate to instructions given and refused by the trial judge to the jury. The defendant excepted to that part of the instructions concerning the responsibility of the Missouri Pacific Railway Company for the act of Mr. Gould in notifying the contractors that, if the road was built beyond Peru Junction, the Missouri Pacific Railway Company would not guaranty a,ny of the bonds deliverable therefor. The instructions were as follows:

“The first question is, if Mr. Gould, as president of the Missouri Pacific, did improperly and unjustifiably break the contract, and refuse to carry out its provisions in regard to guarantying the bonds of the Leroy Company, [30]*30and tiras compel the contractors to abandon work, was such act one which he was authorized to do within the scope oJ! the powers conferred upon him by the hoard of directors, and for which, therefore, the Missouri Pacific is responsible? You have heard the testimony of Mr. Hox>kins, the second vice president, as to the scope of Mr. Gould’s power, what he was authorized to do, what he was permitted to do by the board, and what, in the usual discharge of his duties as president, he did do in regard to the business of the Missouri Pacific, with the assent of his board. ' I think you will not have any difficulty in finding as a fact that, if Mr.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Kent v. Addicks
126 F. 112 (Third Circuit, 1903)
First Nat. Bank of Hailey v. G. V. B. Min. Co.
89 F. 439 (U.S. Circuit Court for the District of Idaho, 1898)
Columbia Nav. Co. v. Vancouver Trans. Co.
52 P. 513 (Oregon Supreme Court, 1898)
Missouri Pac. Ry. Co. v. Sidell
67 F. 464 (Second Circuit, 1895)

Cite This Page — Counsel Stack

Bluebook (online)
66 F. 27, 13 C.C.A. 308, 1895 U.S. App. LEXIS 2288, Counsel Stack Legal Research, https://law.counselstack.com/opinion/leroy-c-v-air-line-r-v-sidell-ca2-1895.