Lamela v. City of New York

560 F. Supp. 2d 214, 2008 U.S. Dist. LEXIS 47980, 2008 WL 2436152
CourtDistrict Court, E.D. New York
DecidedJune 16, 2008
DocketCV-06-5366(BMC)(SMG)
StatusPublished
Cited by8 cases

This text of 560 F. Supp. 2d 214 (Lamela v. City of New York) is published on Counsel Stack Legal Research, covering District Court, E.D. New York primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Lamela v. City of New York, 560 F. Supp. 2d 214, 2008 U.S. Dist. LEXIS 47980, 2008 WL 2436152 (E.D.N.Y. 2008).

Opinion

MEMORANDUM DECISION AND ORDER

COGAN, District Judge.

This is a diversity action for personal injuries and loss of consortium. Plaintiff *219 Jose Lamela alleges he was injured while working on a site owned by defendant the City of New York and under the supervision and control of defendant Urbitran Associates, Inc. Plaintiff claims that both defendants violated New York State Labor Laws § 200, § 241, and were negligent under common law. Presently before this Court are defendants’ respective motions for summary judgment as to plaintiffs’ claims and defendants’ cross-claims. Because plaintiffs have failed to produce evidence of any facts that could support a finding of liability, defendants’ motions for summary judgment as to the plaintiffs’ claims are granted. Defendants’ motions for summary judgment as to their cross-claims are denied as moot.

BACKGROUND

Defendant, the City of New York (“City”), through its agent, the Department of Design and Construction (“DDC”), entered into a contract with DeMicco Brothers, Inc. (“DeMicco”), for the reconstruction of a section of Flushing Avenue in Brooklyn, New York in January of 2003. The reconstruction of Flushing Avenue required installation of a new sewer pipe on a portion of Flushing Avenue between Broadway and Humboldt Street. Plaintiff was a foreman for DeMicco overseeing the work. The City had also entered into a contract with defendant Urbitran Associates, Inc. (“Urbitran”) for “Resident Engineering Inspection Services” for the project.

As foreman, plaintiff took direction from the DeMicco superintendents on-site. Plaintiff or another DeMicco foreman had to determine how to fill the area between the panels reinforcing the vertical walls of the excavation and the ground behind them. The installation of the sheeting and shoring system was also the responsibility of a DeMicco foreman. In addition, the City’s contract with DeMicco stated that DeMicco was to choose the “means and methods of construction,” which was defined as “the labor, materials, temporary structures, tools, plant and construction equipment, and the manner and time of their use necessary to accomplish the result intended by this Contract.”

Urbitran had inspectors on-site everyday to oversee DeMieco’s work. In particular, it had a Resident Engineer, who visited the site throughout the day, supervise the work. The Resident Engineer had the right to reject DeMiceo’s choice of the means and methods of construction if he believed they would create a hazard.

The incident that is the subject of this action occurred on August 17, 2005. Plaintiff was with his crew performing the back-filling of the excavation for the new sewer pipe. Plaintiff stood approximately one foot from the edge of the trench while speaking to his workers, who were within the trench itself. The trench was about ten feet deep, six feet wide, and 250-350 feet long. Sheeting had been placed along the walls of the excavation to prevent their collapse, and fill had been deposited on the exterior side of the sheeting to the extent that the fill was flush with the ground. When called by a worker behind him, plaintiff turned to respond, shifting his weight. The ground beneath his right foot collapsed and his right leg sunk into the ground up to his knee. Plaintiff toppled backward into the trench, though his leg remained stuck in the ground, keeping him suspended in the air upside-down, parallel to the wall of the trench. Within fifteen or twenty seconds plaintiffs co-workers were able to free him. Plaintiff was then taken by ambulance to the hospital for treatment of his injuries.

Neither plaintiff nor his co-worker, Pedro Bouzas, saw the hole until the incident. Mr. Bouzas testified that, prior to the incident, when he saw the area, the dirt was “hard, dry.”

*220 In their initial complaint, plaintiffs sued the City and a number of its departments for common law negligence and violations of New York State Labor Law § 200 1 , § 240, and § 241 2 . Plaintiff sought $5 million in damages for his injuries and his wife, Consuela Lamela, requested $1 million for loss of consortium. Plaintiffs filed an amended complaint, adding a cause of action against Urbitran, and Urbitran and the City each cross-claimed.

Plaintiffs have subsequently narrowed their claims, withdrawing those under Labor Law § 240, and for their § 241(6) claim, they rely solely on Industrial Code regulation § 23-4.2(h). 3

DISCUSSION

I. Summary Judgment Standard,

A court shall grant a motion for summary judgment “if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue of material fact and that the moving party is entitled to judgment as a matter of law.” Fed.R.Civ.P. 56(c); see Celotex Corp. v. Catrett, 477 U.S. 317, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). The burden of demonstrating the non-existence of any genuine issue of material fact falls on the party moving for summary judgment. Adickes v. S.H. Kress & Co., 398 U.S. 144, 157, 90 S.Ct. 1598, 1608, 26 L.Ed.2d 142 (1970); Rodriguez v. City of New York, 72 F.3d 1051, 1060-61 (2d Cir.1995). In determining the applicability of a grant of summary judgment, the court shall “resolve all ambiguities and draw all reasonable inferences against the moving party.” Matsushita Elec. Indus. Co. v. Zenith Radio Corp., 475 U.S. 574, 587, 106 S.Ct. 1348, 89 L.Ed.2d 538 (1986). If a moving party meets their burden, the non-moving party must then present “specific facts showing that there is a genuine issue for trial.” Fed.R.Civ.P. 56(e). The court may not “weigh the evidence, or assess the credibility of witnesses, or resolve issues of fact.” Rodriguez, 72 F.3d at 1061. If there is any evidence from which a reasonable inference could be drawn in favor of the non-moving party, summary judgment is *221 impermissible. Chambers v. TRM Copy Centers Corp., 43 F.3d 29 (2d Cir.1994).

II. Labor Law § 200 and Common Law Claims

New York State Labor Law § 200 is a codification of the common law duty on the part of landowners and general contractors to maintain a safe workplace. Wojcik v. 42nd Street Dev. Project, Inc., 386 F.Supp.2d 442, 455-56 (S.D.N.Y.2005); Ross v. Curtis-Palmer Hydro-Elec. Co.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Zsuffa v. Britt Realty, LLC
E.D. New York, 2022
WROBEL, MICHAEL v. COUNTY OF NIAGARA
Appellate Division of the Supreme Court of New York, 2014
Wrobel v. Town of Pendleton
120 A.D.3d 963 (Appellate Division of the Supreme Court of New York, 2014)
State of Tennessee v. Dale Keith Larkin
443 S.W.3d 751 (Court of Criminal Appeals of Tennessee, 2013)
Baklous v. Amtrak
933 F. Supp. 2d 444 (E.D. New York, 2013)

Cite This Page — Counsel Stack

Bluebook (online)
560 F. Supp. 2d 214, 2008 U.S. Dist. LEXIS 47980, 2008 WL 2436152, Counsel Stack Legal Research, https://law.counselstack.com/opinion/lamela-v-city-of-new-york-nyed-2008.