Kubista v. Jordan

422 N.W.2d 78, 228 Neb. 244, 1988 Neb. LEXIS 139
CourtNebraska Supreme Court
DecidedApril 15, 1988
Docket86-417
StatusPublished
Cited by7 cases

This text of 422 N.W.2d 78 (Kubista v. Jordan) is published on Counsel Stack Legal Research, covering Nebraska Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Kubista v. Jordan, 422 N.W.2d 78, 228 Neb. 244, 1988 Neb. LEXIS 139 (Neb. 1988).

Opinion

Grant, J.

Plaintiff, Joe Kubista, appeals from the district court for Saunders County, where he brought an action against Harold Jordan, doing business as Jordan Plumbing & Heating, for breach of contract. The plumbing which defendant installed in plaintiff’s new residence was inoperable in that, due to the relative elevation, it was impossible for sewage to flow from the house to the existing sewer line in the adjoining street. The trial court, after a trial to the court, found generally in favor of the defendant on all issues. We affirm.

In August of 1983, construction of plaintiff’s new residence in Wahoo, Nebraska, began. Plaintiff had selected a floor plan from a booklet of floor plans and had modified the plan himself to fit his needs. Plaintiff had hired a firm he described as cabinetmakers and builders to be the coordinator of the construction project.

The excavation for the basement and the installation of the basement walls and footings were completed by the end of August. The concrete basement floor was not poured at that time. Plaintiff testified that the construction coordinator knew that plumbing was to be installed in the basement and that *245 plaintiff did not know how the coordinator knew how deep to have the basement dug.

Plaintiff hired defendant to install plumbing in the new house. Defendant testified he had two oral contracts with plaintiff, the first to install plumbing in the house, and the second, entered into later, to connect the house sewer to the existing city line. Installation of the house plumbing began in early September and was completed to the point where a pipe was installed on the excavated floor and “stubbed out” a few inches from the house below the installed footings. Defendant testified that it was normal procedure to run the sewer pipe out of the house under the footings. The basement floor was apparently then poured. Plaintiff paid defendant for this work.

Defendant testified that plaintiff contacted him a second time, with regard to the hookup of the sewerline and waterline, in the first part of October. A different contractor began digging a trench from the house to the street so that a sewerline could be run from the stubbed-in pipe down to the city sewerline. The pipe must protrude from the house at a higher level than the city sewerline in order to permit gravity flow. After defendant had laid a couple of sections of pipe, he then realized that the stubbed-out line was too deep to allow a downhill flow to the city line.

After defendant informed plaintiff of the problem and explained to him that the problem could be corrected by either installing a sewage pump or tearing up a section of the basement floor and raising the pipe to a sufficient level, plaintiff dismissed defendant. Plaintiff then hired new contractors to correct the problem. The general contractor arranged to cut the concrete floor in the basement and arranged for the existing floor to be partially removed. The plumber then raised the pipes under the basement floor to match the necessary sewer line. To get enough height, the plumber testified, “Well, we broke the floor out and broke the center footing, we had to break it out, and we took a little bit of the underside of the front footing to get enough height.”

On appeal to this court, plaintiff assigns as error: (1) The district court erred in not finding that an oral contract existed between plaintiff and defendant and was breached by *246 defendant’s defective performance, and in dismissing plaintiff’s petition; (2) the district court erred in failing to award damages to plaintiff for the expense he incurred in correcting the defective performance of defendant, which runs counter to the preponderance of evidence; (3) the district court erred in not finding that the plaintiff had met his burden of proof.

At trial, plaintiff testified that at the time he hired defendant to install the plumbing, he provided defendant with a copy of the floor plan of the first floor and the basement. While testifying, plaintiff noted that the floor plan, which was admitted into evidence, included an instruction stating: “3. Third Street sewer line will be used for the drainage pipe.” Plaintiff further testified that he had arranged at the outset for defendant to do both the plumbing and the sewerline. Plaintiff stated that he gave defendant a choice between two contractors to dig the trench for the sewerline from the house to the city line in the street. With regard to the depth at which the plumbing protruded from the house and the proper depth for the sewerline, plaintiff testified as follows:

A. ... I never mentioned anything about the depth of the city sewer because whatever I asked him he was able to answer and when I asked about the idea of cap plumbing he said, “We have been doing it for 20 years.” And, well, he wanted me — it was like his way of saying, “I have been at this a long time, I know what to do or what should be done.”
Q. You had just mentioned that you discussed the depth or you did not discuss the depth of the sewer with Mr. Jordan, is that correct?
A. No, no, I didn’t because how was I to know where he should — what the depth should be in the house, that is in the basement and then how much they allow for drainage because if I was a true contractor or plumbing contractor I would not, that would be like subcontracting and, of course, I was a customer not a contractor.
Q. At the time of this conversation did you have any knowledge as to what the depths of the city sewer was on West Third Street?
A. Well, I did check in July of 1983 with the light and *247 water commissioner, Don Peterson, and he checked.a large map that they have there and he said it’s approximately seven feet deep.
Q. Did you communicate this knowledge to Mr. Jordan?
A. No. No, I didn’t because when I asked about other things, well, he made me feel like I was asking questions that he knows by heart.

Defendant, Harold Jordan, testified regarding the depth of the stubbed-in pipe he installed:

Q. Have you done work like this before where you have hooked up to city utilities?
A. Oh, yes.
Q. Do you generally check as to the depth of the existing utility?
A. Yes, before we started we asked Mr. Kubista and he told us six feet deep.
Q. Do you generally rely upon information given to you by home owners such as Mr. Kubista?
A. Yes.
Q. Are you aware of the fact that the city has information pertaining to the depth of their utilities?
A. Yes.
Q. Which would you deem the more appropriate source for that information?
A. Well, we asked him, Mr. Kubista, and he told us he had got this information from the city, so it would be one in [sic] the same.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Suess v. Lee Sapp Leasing, Inc.
428 N.W.2d 899 (Nebraska Supreme Court, 1988)
Fisbeck v. Scherbarth, Inc.
428 N.W.2d 141 (Nebraska Supreme Court, 1988)
Kramer v. Mid-Western Development, Inc.
425 N.W.2d 336 (Nebraska Supreme Court, 1988)
Kearney Centre Investments, Ltd. v. Thomas
424 N.W.2d 620 (Nebraska Supreme Court, 1988)
Wells Fargo Alarm Services v. Nox-Crete Chemicals, Inc.
424 N.W.2d 885 (Nebraska Supreme Court, 1988)
Allen v. AT & T TECHNOLOGIES, INC.
423 N.W.2d 424 (Nebraska Supreme Court, 1988)
Kuehl v. DIESEL POWER EQUIPMENT CO.
422 N.W.2d 361 (Nebraska Supreme Court, 1988)

Cite This Page — Counsel Stack

Bluebook (online)
422 N.W.2d 78, 228 Neb. 244, 1988 Neb. LEXIS 139, Counsel Stack Legal Research, https://law.counselstack.com/opinion/kubista-v-jordan-neb-1988.