Jennett v. Colorado Fuel & Iron Corp.

398 N.E.2d 755, 9 Mass. App. Ct. 823, 1980 Mass. App. LEXIS 972
CourtMassachusetts Appeals Court
DecidedJanuary 11, 1980
StatusPublished
Cited by10 cases

This text of 398 N.E.2d 755 (Jennett v. Colorado Fuel & Iron Corp.) is published on Counsel Stack Legal Research, covering Massachusetts Appeals Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Jennett v. Colorado Fuel & Iron Corp., 398 N.E.2d 755, 9 Mass. App. Ct. 823, 1980 Mass. App. LEXIS 972 (Mass. Ct. App. 1980).

Opinion

By their actions the plaintiffs sought to recover for damages they sustained when they were thrown from a lifting beam because of a failure in one of the upper “legs” of a steel cable sling. Both plaintiffs brought actions for negligence against United Industrial Syndicated, Inc., d/b/a Portland Co. (Portland), which had entered into a contract with Stone & Webster Engineering Corporation (Stone & Webster) to construct a “stop-log structure,” including the lifting beam and steel cable-sling. The plain[824]*824tiffs also sought recovery for negligence against Colorado Fuel & Iron Corp. (Colorado), which had agreed to manufacture the sling for Portland.

In each of the two actions Colorado impleaded Walter Boyko, the actual manufacturer of the sling, as a third-party defendant. (The jury found that Boyko was not negligent and that although he had breached an implied warranty of merchantability to Colorado, that breach was not a proximate cause of the injuries of either plaintiff.) Portland impleaded Sargent, Lord and Co. (no longer a party) and Stone & Webster as third-party defendants in both actions. Portland was subsequently granted leave to implead Colorado for negligence in the manufacture, servicing and inspection of the sling, as well as for breaches of both express and implied warranties that the sling was merchantable and fit for its normal intended use.

All the actions were tried together and submitted to a jury on twenty-eight special questions. In their answers the jury found that Colorado had been negligent “in its role as the supplier of [the] steel cable sling” and that such negligence had been a direct and proximate cause of the injuries sustained by the plaintiffs. The jury also found that Colorado was guilty of breaches of both the express and implied warranties and that those breaches were proximate causes of the plaintiffs’ injuries.

The jury found that Portland was negligent in its role as the supplier of the stop-log structure, which included the steel cable sling, and found that its negligence had been a direct and proximate cause of the plaintiffs’ injuries.

The jury also found that Stone & Webster was negligent in permitting use of the steel cable sling without evidence that the sling had been tested, and concluded that its negligence was a direct and proximate cause of the plaintiffs’ injuries.

1. Colorado appeals from the denials of its motion for a new trial, its motion for a directed verdict and its two motions for judgment notwithstanding the verdict (one directed to the original plaintiffs’ claims and the other directed to Portland’s third-party action for breach of warranty). There was no error.

a. We agree with the trial judge that there was sufficient evidence for the jury to conclude that Colorado was negligent in failing to test the sling before delivery and that its negligence was a direct and proximate cause of the injuries sustained by the plaintiffs. See Carter v. Yardley & Co., 319 Mass. 92, 96 (1946). See also Restatement (Second) of Torts § 400 and Comment c (1965).

b. We also agree that there was sufficient evidence to warrant a finding that Colorado breached both its express and implied warranties to Portland and that Portland gave timely notice of such breaches. See Nugent v. Popular Mkts., Inc., 353 Mass. 45, 49 (1967). Cf. G. L. c. 106, § 2-607(3). (We have assumed that these issues are properly before us.)

[825]*825c. Colorado has raised no question as to the propriety of the judge’s ordering it to indemnify Portland.

d. For all that appears, Colorado’s argument with regard to the allowance of Portland’s third-party motion to implead it (see Mass.R.Civ. P. 14(a), 365 Mass. 760 [1974]), was not raised below, and thus that allowance cannot now be reviewed here. See John B. Deary, Inc. v. Crane, 4 Mass. App. Ct. 719, 724 (1976). In any event, it was properly within the judge’s discretion to allow that motion. See 6 Wright & Miller; Federal Practice and Procedure § 1454, at 293-294 (1971).

e. Colorado did not properly raise below the questions relating to the plaintiffs’ alleged contributory negligence, see Mass.R.Civ.P. 50(b) and 51(b), 365 Mass. 814 and 816 (1974), nor has the question with regard to the judge’s charge been properly argued here within the meaning of Mass. R.A.P. 16(a)(4), as amended, 367 Mass. 921 (1975). In any event, both questions are without merit.

2. Portland appeals from the denials of its motions for a directed verdict and for judgment notwithstanding the verdict on the grounds that it, as an intermediate distributor, had no duty to test and that even if it had such a duty and it was breached, such breach was not a proximate cause of the plaintiffs’ injuries. There was no error. We agree with the reasoning and determination of the judge that even if Portland was a mere intermediate distributor (which we believe he properly concluded it was not), it had an additional duty to the plaintiffs arising out of the written contract it had entered into with Stone & Webster (acting on behalf of the owners) which specified that “ [a]ll materials, supplies and parts and assemblies thereof entering into the work . . . shall be tested” before delivering it to the customer, Portland’s contractual duty (which it breached) to test the sling or have it tested ran to all foreseeable plaintiffs (see Banaghan v. Dewey, 340 Mass. 73, 80 [1959], and cases cited), and accordingly, the jury were warranted in finding that its negligence was a proximate cause of the plaintiffs’ injuries. See Bulpett v. Dodge Associates, 5 Mass. App. Ct. 593, 598 (1977).

3. Portland and Colorado appeal from the denial of their separate motions for a new trial on the issue of damages with regard to the plaintiff Morris. (Stone & Webster does not argue that issue here.) See Bartley v. Phillips, 317 Mass. 35, 40-44 (1944). After careful and detailed analysis the judge found that the jury’s verdict was not excessive. As we are unable to say that “the act of the judge in permitting [that award] to stand was an abuse of discretion constituting error of law,” id. at 44, the verdict will not be disturbed. See Hartmann v. Boston Herald-Traveler Corp., 323 Mass. 56, 61 (1948).

4. Stone & Webster appeals from the denial of its motion for a directed verdict (and its postverdict motion to the same effect), primarily on the ground that it is not guilty of any negligence. We cannot agree. [826]*826See Sieracki v. Seas Shipping Co., 149 F.2d 98,100 (3d Cir. 1945), aff’d, 328 U.S. 85 (1946). There was sufficient evidence to warrant the jury finding that Stone & Webster in its capacity as supervising engineer of the project was negligent in permitting use of the steel cable sling without having obtained evidence that the sling had been tested, and such negligence directly caused the plaintiffs’ injuries. See Restatement (Second) of Torts § 416 (1965).

Alfred J. Monahan for Colorado Fuel & Iron Corp. Philip J. Callan, Jr., for United Industrial Syndicated, Inc., d/b/a Portland Co. Richard F. Faille (Donald A. Beaudry with him) for Stone & Webster Engineering Corporation.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Alexander v. Daley
28 Mass. L. Rptr. 186 (Massachusetts Superior Court, 2011)
Capstone Building & Construction, LLC v. Payne
26 Mass. L. Rptr. 215 (Massachusetts Superior Court, 2009)
Williams v. Roche Bros. Supermarkets, Inc.
1999 Mass. App. Div. 174 (Mass. Dist. Ct., App. Div., 1999)
Quintanilla v. City of Worcester
9 Mass. L. Rptr. 309 (Massachusetts Superior Court, 1998)
Parent v. Stone & Webster Engineering Corp.
556 N.E.2d 1009 (Massachusetts Supreme Judicial Court, 1990)
Laaperi v. Sears, Roebuck & Co.
787 F.2d 726 (First Circuit, 1986)
Henrick v. Coats Co.
458 N.E.2d 773 (Massachusetts Appeals Court, 1984)
Stone & Webster Engineering Corp. v. United Industrial Syndicated, Inc.
451 N.E.2d 131 (Massachusetts Appeals Court, 1983)

Cite This Page — Counsel Stack

Bluebook (online)
398 N.E.2d 755, 9 Mass. App. Ct. 823, 1980 Mass. App. LEXIS 972, Counsel Stack Legal Research, https://law.counselstack.com/opinion/jennett-v-colorado-fuel-iron-corp-massappct-1980.