In Re APPLICATION OF ENBRIDGE ENERGY TO REPLACE AND RELOCATE LINE 5

Michigan Supreme Court·Decided July 31, 2026·No. 168335, 168336, 168337, 168338, 168339, and 168346·Published

Opinion

Michigan Supreme Court Lansing, Michigan

Syllabus Chief Justice: Justices: Megan K. Cavanagh Brian K. Zahra Richard H. Bernstein Elizabeth M. Welch Kyra H. Bolden Kimberly A. Thomas Noah P. Hood

This syllabus constitutes no part of the opinion of the Court but has been Reporter of Decisions: prepared by the Reporter of Decisions for the convenience of the reader. Kimberly K. Muschong

In re APPLICATION OF ENBRIDGE ENERGY TO REPLACE AND RELOCATE LINE 5

Docket Nos. 168335, 168336, 168337, 168338, 168339, and 168346. Argued March 16, 2026 (Calendar Nos. 2 and 3). Decided July 31, 2026.

These consolidated appeals involve the intersection of three legal frameworks—1929 PA 16 (Act 16), MCL 483.1 et seq. (giving the PSC primary authority to regulate pipelines in Michigan); Michigan’s environmental protection act (MEPA), MCL 324.1701 through MCL 324.1706; and the common-law public trust doctrine—and the order of the Michigan Public Service Commission (PSC) approving Enbridge Energy Limited Partnership’s application to construct a tunnel under the Straits of Mackinac to house a portion of its Line 5 pipeline (the “Replacement Project”). The PSC granted Enbridge’s predecessor approval to construct Line 5 in 1953, and the Michigan Conservation Commission also granted it an easement to construct two 20-inch pipes (referred to as the dual pipelines) located on or suspended above the lakebed across the Straits. As part of a negotiated agreement between the state and Enbridge in 2017 through 2018, the Replacement Project contemplated the decommissioning of the dual pipelines and the construction of a concrete-lined tunnel under the Straits’ lakebed and a new 30-inch pipe through the tunnel. In 2018, the Legislature created the Mackinac Straits Corridor Authority (MSCA) and authorized it to enter into an agreement to build a “utility tunnel” under the Straits. The Department of Natural Resources granted the MSCA an easement to construct a tunnel under the Straits, and once Enbridge completes the tunnel, the MSCA will take ownership of the tunnel and provide Enbridge with a 99-year lease.

After Enbridge filed its application for the Replacement Project with the PSC, appellants, Bay Mills Indian Community, Grand Traverse Band of Ottawa and Chippewa Indians, Little Traverse Bay Bands of Odawa Indians, Nottawaseppi Huron Band of the Potawatomi, Environmental Law and Policy Center, Michigan Climate Action Network, and For Love of Water, intervened in the proceedings to oppose the Replacement Project. Appellees Michigan Laborers’ District Council, Michigan Propane Gas Association, and National Propane Gas Association intervened to support the project.

The PSC referred the matter to an administrative law judge (ALJ) to conduct proceedings and build a record. Relevant to this appeal, the parties disputed the proper scope of the PSC’s analysis under MEPA. Enbridge filed a motion in limine seeking to exclude as legally irrelevant various issues from the PSC’s consideration, including the construction of the utility tunnel, the environmental impact of the tunnel construction, the public need for and continued operation of Line 5, the current operational safety of Line 5, whether Line 5 has an adverse impact on climate change, and the intervening parties’ climate change agendas. The ALJ granted the motion as to all issues other than the construction of the utility tunnel, and several intervenors appealed the ruling to the PSC. While that appeal was pending, Governor Gretchen Whitmer issued a notice of revocation of the 1953 easement. The PSC remanded the case to the ALJ to consider the impact of the Governor’s actions.

On remand, the ALJ reached the same conclusions as he had before. He found that the PSC’s 1953 order had already established that Line 5 served a public need and that this finding had no expiration date. The ALJ further concluded that Governor Whitmer’s actions could not “be used to expand the scope of this case to include an examination or determination of the public need for Line 5, or any aspect of its operation and safety.” The intervenors again appealed, and the PSC largely affirmed the ALJ’s ruling. Like the ALJ, the PSC determined that its 1953 decision approving Line 5, as well as earlier Supreme Court caselaw, established that the pipeline complied with Act 16 and that there was no expiration date for this finding. Accordingly, it concluded that the Act 16 analysis in this case should be limited to the Replacement Project and not the pipeline as a whole. The PSC limited its MEPA analysis “to the conduct at issue in this case,” i.e., the Replacement Project, and refused to consider evidence of potential pollution, impairment, and destruction of Michigan’s natural resources resulting from existing sections of Line 5, including the danger of oil spills. It also concluded that its MEPA analysis did “not extend to the entirety of Line 5,” but was limited to the single new pipeline and tunnel. However, the PSC also determined that the conduct at issue included the products flowing through the new pipeline section and allowed the introduction of evidence of the greenhouse gas emissions that would result from the consumption of the products. The PSC also concluded that greenhouse gases were “pollution” within the meaning of MEPA and that although the Replacement Project was limited to the 4-mile section of the pipeline described in the application, MEPA review was necessary because that pipeline section would involve hydrocarbons that may result in pollution.

After the presentation of additional evidence and testimony, the ALJ closed the record and transferred the case to the PSC for a final decision. The PSC issued an order granting Enbridge approval under Act 16 to construct the Replacement Project. It found that the requirements of both Act 16 and MEPA were satisfied and that there were no feasible or prudent alternatives to the Replacement Project, but it declined to consider the public trust doctrine in its analysis.

Appellants appealed the PSC’s ruling to the Court of Appeals. In a published per curiam opinion, the Court of Appeals, M. J. KELLY, P.J., and LETICA and WALLACE, JJ., affirmed. ___ Mich App ___ (February 19, 2025) (Docket Nos. 369156, 369157, 369159, 369161, 369162, 369163, 369165, and 369231). Appellants sought leave to appeal, and the Supreme Court granted the applications. ___ Mich ___; 25 NW3d 327 (2025) (Docket Nos. 168335 to 168339); ___ Mich ___; 25 NW3d 319 (2025) (Docket No. 168346).

In an opinion by Justice WELCH, joined by Chief Justice CAVANAGH and Justices BERNSTEIN, BOLDEN, THOMAS, and HOOD, the Supreme Court held: Courts must review de novo an agency’s application of MEPA, regardless of whether a case commences in court or in administrative proceedings. MEPA requires (1) consideration of the environmental impact factually and proximately caused by the conduct at issue, (2) a fair and reasoned comparison of the environmental impacts of any alternatives to the conduct considered, and (3) consideration of the conduct’s potential effects on public trust resources. The Court of Appeals erred in this case by applying a deferential standard of review to the PSC’s decision, and the PSC erred by (1) failing to consider whether the tunnel project will factually and proximately cause the extension of Line 5’s operational life, potentially resulting in additional environmental harm; (2) comparing alternatives in an inconsistent manner; and (3) failing to consider the project’s impact on public trust resources.

1. The Court of Appeals erred by applying a deferential standard of review to the PSC’s MEPA determination rather than analyzing de novo whether the proposed conduct satisfies MCL 324.1705(2).

Free access — add to your briefcase to read the full text and ask questions with AI

In Re APPLICATION OF ENBRIDGE ENERGY TO REPLACE AND RELOCATE LINE 5, (Mich. 2026).

In Re APPLICATION OF ENBRIDGE ENERGY TO REPLACE AND RELOCATE LINE 5 (In Re APPLICATION OF ENBRIDGE ENERGY TO REPLACE AND RELOCATE LINE 5) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.