Humeston & Shenandoah Railway Co. v. Chicago, St. Paul & Kansas City Railway Co.
This text of 38 N.W. 413 (Humeston & Shenandoah Railway Co. v. Chicago, St. Paul & Kansas City Railway Co.) is published on Counsel Stack Legal Research, covering Supreme Court of Iowa primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Opinion
The provision of the statute prescribing and governing the rights of the parties is found in section 1265 of the Code, which is as follows: “ Any such corporation may construct and carry its railroad across, over or under any railway, canal or water-course, when it may be necessary in the construction of the same; and, in such cases, said corporation shall so construct its crossing as not unnecessarily to impede the travel, transportation or navigation upon the railway, canal or stream so crossed. * * * ’ ’ The inquiry in the case is whether the travel and transportation would be unnecessarily impeded by the construction of a gráde crossing at the point selected by defendant for crossing its [556]*556track. Under chapter 163, Acts Twentieth General Assembly, a railroad company whose track intersects or is intersected by other railroad tracks on the same level is required to bring all trains to a stop before reaching the crossing. Under that requirement, grade crossings necessarily have the effect to impede to some extent travel and transportation on the lines. But the right to construct and maintain such crossings under proper conditions is clearly recognized both by that chapter and section 1265, and the inconvenience and delay which arise from their use under such circumstances must be borne by the companies whose business is thus interfered with. But by the latter section the duty is imposed upon the company constructing the intersecting line to so construct the crossing as not unnecessarily to interfere with the operation of the other road; and whether a crossing at grade would in any case amount to an unnecessary obstruction of the business must be determined from the circumstances of that particular case. The condition of the track, the grades at and near the point of intersection, the relative cost of an over or under crossing as compared with that of a grade crossing, and the increase of danger in the operation of the road, are proper matters to be considered. It is very apparent, from the foregoing statement, as to the grades in plaintiff’s track near the point of intersection, that the operation of its trains will be greatly impeded if a crossing at grade should be maintained. All trains approaching the crossing from the east must, under the requirements of the statute, be brought to a stop not less than two hundred feet from it. They must necessarily be stopped on the ascending, grade. The difficulty of starting a heavy train under such circumstances is known to all persons v/ho have had any opportunity to observe the operation of railroads; and in addition to this would be the difficulty of acquiring sufficient momentum before reaching the ascending grade to the west of the crossing to carry the train over it. The trains approaching from the west would necessarily be required to stop on the descending grade. This would [557]*557be attended with many difficulties, and there would be constant danger of collision upon the crossing. The cost of an over crossing in excess of that of one at grade would be fifty thousand dollars or more, and its construction would necessitate a grade in defendant’s track of fifty-three feet per mile. If there was no election except between an over crossing and one at grade, we might not be disposed to require defendant to incur this additional cost and the inconvenience which would arise from the construction of its track at that grade. But the evidence shows that a crossing under plaintiff’s track can be constructed at a cost of less than fifteen thousand dollars in excess of that of a crossing at grade, and by adopting that course the objectionable grade can be also avoided. In view of these facts, we think plaintiff should not be required to incur the inconvenience and cost and danger which the construction of a crossing at grade would necessarily create. It is true that the business done on its road is very small in comparison with that done on the great lines of the country. Its trains are comparatively light, and the inconvenience of the grade crossing would not be as great as in the case of a more important road; but that is not controlling. The grade crossing, we think, would unnecessarily impede the travel and transportation on its road.
Affirmed.
Free access — add to your briefcase to read the full text and ask questions with AI
Related
Cite This Page — Counsel Stack
38 N.W. 413, 74 Iowa 554, 1888 Iowa Sup. LEXIS 59, Counsel Stack Legal Research, https://law.counselstack.com/opinion/humeston-shenandoah-railway-co-v-chicago-st-paul-kansas-city-iowa-1888.