Hessell v. Healey

280 P.2d 124, 131 Cal. App. 2d 144, 1955 Cal. App. LEXIS 2026
CourtCalifornia Court of Appeal
DecidedFebruary 28, 1955
DocketCiv. No. 20357
StatusPublished

This text of 280 P.2d 124 (Hessell v. Healey) is published on Counsel Stack Legal Research, covering California Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Hessell v. Healey, 280 P.2d 124, 131 Cal. App. 2d 144, 1955 Cal. App. LEXIS 2026 (Cal. Ct. App. 1955).

Opinion

FOX, J.

The basic issue on this appeal is whether a paint spray booth which was installed in a building at a gasoline service station was so attached as to become an integral part of the premises. The trial court made affirmative findings on this question. Appellants challenge the sufficiency of the evidence to sustain such findings, assert that findings were not made on material issues and claim prejudicial error in the admission and exclusion of evidence. We find no merit in any of these attacks.

The real property on which the service station was located was owned by respondent Healey. From August, 1946, to February, 1951, Rogers Automotive Service, Inc., was the lessee of the service station and Will E. Rogers, president of the corporation, was in active operation of it. In February, 1949, Rogers purchased through his corporation the paint [146]*146spray booth here in controversy from appellants on a conditional sales contract. It was installed without the knowledge or consent of the owner of the property, Mrs. Healey, although the lease provided that “the lessee shall not make any alterations in or upon or any additions to the improvements now located and situated upon the said premises without the written consent of the lessor. ...”

Rogers, who was delinquent on the conditional sales contract, sold his service station business, equipment and inventory to the plaintiffs, Hessell, in February, 1951. The Hessells were informed that the paint spray booth was being purchased from appellants on a conditional sales contract. They paid the appellants the balance due of $1,476.60, receiving a bill of sale providing that appellants “covenant and agree to warrant and defend the title to the property . . . against the just and lawful claims and demands of all persons whomsoever.” When Mrs. Healey learned of the installation and claimed title to the booth as part of the realty, the Hessells demanded that appellants defend their title pursuant to the terms of he bill of sale. This demand was refused. Plaintiffs thereupon brought this action to quiet title to the paint spray booth, or for damages against appellants in the event the court found that title was in Mrs. Healey. Plaintiffs joined Mrs. Healey, the owner of the realty, and the vendors of the paint spray booth, Charles G. Russell and P. T. Johnston, individually, and as copartners doing business as Motor Parts Depot. The latter parties have appealed from the judgment which decreed that Mrs. Healey is the owner of the paint spray booth and that plaintiffs recover from them $1,476.60 (plus interest and attorneys’ fees) which is the amount plaintiffs paid Russell and Johnston when the latter issued their bill of sale to the said booth, warranted title thereto, and agreed to defend the same against all claims and demands.

The booth was 28 feet long, 14 feet wide, and 9 feet high. It had a top but no floor. It was delivered unassembled. Such equipment in the city of Los Angeles, where this service station is located, is required to be installed inside a building. The building, however, at this service station was not large enough to completely house the paint spray booth. It protruded between 9 and 10 feet. The surface outside the building, which was blacktop, was not level with the concrete floor inside the building. It was therefore necessary at the outset to pour a concrete slab over the asphalt on the outside and thus build up the foundation so that it would be level with the floor of [147]*147the building. This slab was around 19 feet by 16 or 17 feet. It varied in thickness from a fraction of an inch to 5 inches. Since the booth was not entirely within a building it was necessary to build a roof over the portion that protruded. This roof was about 3% feet above the top of the booth and was affixed to the brick wall of the building.

The attachment of the booth to the inside of the building can be best described by quoting briefly from the testimony of two of the witnesses. Mr. O’Connor, the agent of the owner of the property, and respondent Healey, described the situation as follows: “Then when I stepped inside the building I noticed the spray booth was in two sectional metal tops and sides and back. The front part had been—it had channel iron which was practically about two and a half to three inches in width, and put at right angles to the brick walls, and those channel irons were adhered by nails and by screws to the side of the wall.

“Looking up to the top, the spray booth had channel iron about three or four inches wide, heavy metal coming from the top of the metal spray booth bent down around to an I-beam, and that was welded.

“Q. They were welded!
“A. Yes.
“Q. You mean they welded the paint spray booth to the I-beam of the building!
“A. They were welded to the I-beam to give support and to hold the front part of that booth.
“Q. What else did you observe!
“A. And then I stepped inside, and inside that stall there was a wall which I presume was about fourteen inches of brick, and there was channel irons against it with which part of the spray booth was bolted—I should say nailed to the wall and a screw—and then on the top similarly like they had on the outside, but the ones that went on the inside they were bolts besides the welding, as over in the corners, and the spray booth was even welded in the open panels on the top. ’ ’

Mr. Fulton, a witness on behalf of appellants, on cross-examination by Mr. Bisse, gave the following picture of the manner in which the booth was affixed to the building:

“Q. Now, is this paint spray booth, as it is now affixed, is it rigid in the building!
“A. The way it is fixed—yes, it is very rigid.
“Q. And it is permanently affixed, when I am using the [word] ‘permanently’ I mean it will stay there and remain [148]*148there, and could be operated for many years to come, could it not?
“A. Yes, it could,
"Q. And it is affixed solidly to the building from the floor to the ceiling, is it not?
“A. Yes.
“Q. You have got these lag screws in the floor?
“A. That’s right.
‘'Q. And you have it welded to the ceiling ?
“A. In four spots, yes.
“Q. And on the front part there is some angle iron that ties it to the pillars?
“A. The front section of the booth that protrudes, yes.
‘ ‘ Q. And there is angle iron bolted to the top of the paint spray booth that is welded to the building?
“A. Yes. . . .
“Q. And how many pieces of iron would you say were welded to the I-beam ?
“A. Three.”

It was necessary to provide a vent for the paint spray booth so a hole about three feet in diameter was cut in the roof of the building. Two joists 2" x 12" were cut. The vent extended above the roof about three feet and had a sheet of metal placed over it to keep the rain from coming down.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Crawford v. Southern Pacific Co.
45 P.2d 183 (California Supreme Court, 1935)
Estate of Bristol v. Young
143 P.2d 689 (California Supreme Court, 1943)
Alderman v. Baggett
25 P.2d 532 (California Court of Appeal, 1933)