Heatley v. George A. Fuller Co.

166 Ill. App. 85, 1911 Ill. App. LEXIS 30
CourtAppellate Court of Illinois
DecidedNovember 14, 1911
DocketGen. No. 15,789
StatusPublished

This text of 166 Ill. App. 85 (Heatley v. George A. Fuller Co.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Heatley v. George A. Fuller Co., 166 Ill. App. 85, 1911 Ill. App. LEXIS 30 (Ill. Ct. App. 1911).

Opinion

Mr. Justice Smith

delivered the opinion of the court.

This action was brought by appellant ag’ainst ap-pellee for wrongfully causing the death of plaintiff’s testator. Upon the trial at the close of plaintiff’s evidence the trial court peremptorily instructed the jury to find the defendant not guilty, and entered judgment upon the verdict returned in accordance therewith.

The declaration consisted of four original and four additional counts. Upon examination of the different counts in the declaration we think they all set out substantially the slime negligence.

In the first count, which may be taken as a fair sample of all as to the negligence averred, it is alleged that the defendant was engaged in the erection of a certain building, and that it erected and constructed, or caused to be erected and constructed, a certain temporary platform, framework, staging or scaffolding; that the deceased was in the employ of the defendant as a carpenter and was then and there working about said building; that it became necessary for Heatley, the deceased, in the performance of his duties to go and be upon said temporary platform, framework, staging or scaffolding; that it was the duty of the defendant to exercise reasonable care to furnish said deceased with a reasonably safe and suitable place to perform his duties as such servant, and to keep and maintain said platform, framework, staging or scaffolding at all times in a reasonably safe and suitable condition; that the defendant negligently failed and neglected to perform its said duty, and carelessly permitted and allowed said platform, framework, staging or scaffolding to become, be and remain in an unsafe and dangerous condition, and that while the deceased in the exercise of ordinary care for his own safety, went and was upon the temporary platform, framework, staging or scaffolding lie was caused to fall and received injuries from which, he died, by reason of the unsafe and dangerous condition of the scaffolding.

The evidence of the plaintiff in the action tended to show the following facts:

At the time of the accident, September 4, 1907, the deceased, Thomas Heatley, was in the employ of the appellee, the George A. Fuller Company, as carpenter, and was working at the Montgomery Ward building, which was being constructed by appellee at the corner of Chicago avenue and Larrabee street, adjoining tlje Chicago river, in the city of Chicago. The building was about 600 feet long from north to south and about 200 feet wide from east to west and was to be constructed about eight stories high. The west side of the building adjoined the Chicago river. The building was being constructed of reinforced concrete construction, and at the time in question the second floor had been completed, and Heatley and his companions were at work on the third floor, under the direction of ap-pellee’s foreman, John O’Toole, laying panels or frames into which the concrete for the floor was to be poured. The floor of the building was divided by the main girders of the building into squares or sections 16 feet square and in each of these squares 2 by 10 joists were laid, four in number, dividing the sections into equal spaces each a little more than three feet wide. Upon these joists panels were laid, each panel being 4 feet wide and 16 feet long. Four of these panels would completely fill the square or section. Hpon these panels in each section cement would be poured until it completely filled the section and would be six or eight inches deep. These joists and panels and in fact the entire wood construction were merely temporary, and, as soon as the cement had sufficiently hardened, the joists, panels and wood construction would be taken ont. The sections in the row along the west side of the building were not square, because the west side of the building following the line of the river and the west wall instead of running directly north and south ran northwest and southeast. This made the east and west dimensions of the sections in the row on the west side of the building vary, some of the sections being less than 16 feet from east to west while others were somewhat more than 16 feet. The north and south dimensions of all the sections were the same. It was through one of these river sections that the deceased fell. Some of the sections on the third floor where deceased was working had already been filled with cement and had hardened or were in process of hardening. In others the joists and panels had already been placed ready to receive the cement, while in others only the joists had been placed and had no panels in them at all.

The deceased at the time of the accident was working with a gang of carpenters engaged in placing and fitting panels into the sections, making them ready to be filled with cement. At the time of the accident he with three other men was carrying one of the panels to the section which he was helping to prepare. As they carried this panel the deceased and one of the other men were at the front end of the panel and two others at the rear end of it. The deceased occupied a position at the right front corner. As he approached his section carrying this panel he stepped upon one of the 2 by 10 joists which was in a section immediately adjoining the one upon which he was engaged, the joist turned with him, he lost his balance and fell to the.floor below. At the very time that he approached the place where he fell and the joist upon which he stepped, two carpenters were actually engaged at work upon the joist, one of them at one end and one at the other. Everything there was in plain sight and -immediately before deceased’s eyes. It was broad open daylight. It was the top floor of the building as it then stood, with no structure or construction of any kind, built above the floor. The two men working on the particular joist were sitting on top of it, one at either end of the joist, and were actually working on it at the time that the deceased stepped on the joist and fell.

The contentions are that the court erred in instructing the jury to find the defendant not guilty, and erred in overruling plaintiff’s motion for a new trial.

It appears from the theory of the case as set out in the various counts of the declaration, that the defendant was negligent in constructing and maintaining the scaffolding or platform upon which the deceased was at work, and that the defendant was also negligent in not giving the deceased a safe place in which to work. Upon that theory of the case the authorities cited by counsel for appellant are in point, for it is no doubt a sound proposition of law that if the master provides a platform or staging or scaffolding for his employes to work upon, it is his duty to make such structure reasonably safe for the purpose of use by his servants; and if the evidence proved the averments of the declaration the plaintiff would undoubtedly have a right to recover, and the court erred in taking the case from the jury. But, in our opinion, the evidence does not tend to show that the defendant had erected any scaffolding, platform or other structure designed for the purpose of furnishing a reasonably safe place for its employes, including the deceased, to work.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Armour v. Hahn
111 U.S. 313 (Supreme Court, 1884)
Murphy v. Greeley
15 N.E. 654 (Massachusetts Supreme Judicial Court, 1888)
Village of Montgomery v. Robertson
82 N.E. 396 (Illinois Supreme Court, 1907)
Richardson v. Anglo-American Provision Co.
72 Ill. App. 77 (Appellate Court of Illinois, 1897)
Western Wrecking & Lumber Co. v. O'Donnell
101 Ill. App. 492 (Appellate Court of Illinois, 1902)
F. J. McCain Co. v. Kingsley
126 Ill. App. 165 (Appellate Court of Illinois, 1906)
Falkeneau Construction Co. v. Ginley
131 Ill. App. 399 (Appellate Court of Illinois, 1907)