Hatcher v. General Electric Co.

145 S.E.2d 647, 112 Ga. App. 585, 1965 Ga. App. LEXIS 781
Court of Appeals of Georgia·Decided October 15, 1965·No. 41504·Published·Cited by 3 cases

Opinion

Felton, Chief Judge.

At the outset it will be necessary to determine just what the issues are which must be decided. Plaintiff in error contends that the only pleading to be con[592] sidered is the recompiled petition, filed as an amendment. If this is true no ruling would be necessary on the question whether new causes of action were added by the amendment by way of the recompiled petition. In other words, he claims that the original petition is to be disregarded in considering those questions. If this is correct there could be no addition of a new cause of action by the filing of the recompiled petition. This view is incorrect because the recompiled petition is an amendment and the questions of the additions of new causes of action must be determined by comparing the original petition with the recompiled petition, which we shall do later on in the opinion. The defendants in error contend that in determining these questions the recompiled petition must be compared with the original petition as twice amended. This view is not correct because if the recompiled petition (not redrafted petition after rulings on amendments and demurrers were made) omitted allegations made in the two amendments before rulings were made on them, the omission of such allegations was withdrawal of the omitted amendments and they would not be compared with the recompiled allegations. The original petition alleged as follows in counts 1 and 2: “8. The aforesaid fire and the resulting loss and damage to petitioner was caused by the negligent and improper installation in said building of air conditioning equipment which was defective and which was negligently manufactured and designed. 9. The defendant, General Electric Company, hereinafter referred to separately as General, is a well and nationally known manufacturer of electrical equipment, including air conditioning equipment, and owes to the public generally, including petitioner, the duty to exercise due care and skill in the manufacture, design and distribution of its electrical products to the public, and impliedly represents to the public that its products are free from defects which create fire hazards and danger from fire to life and property. The air conditioning equipment installed in the aforesaid building was designed, manufactured and made available to the public by General. 10. The defendant, Thompson Company, hereinafter referred to separately as Thompson, is the wholesale distributor for the State of Georgia of the electrical heating and cooling equipment [593] of General, and is so recognized and dealt with by General and by the purchasers in the State of Georgia of such General products. Thompson is possessed of or is supposed and represented to be possessed of the requisite engineering skill and knowledge of the products of General to plan and promote the sale and distribution of said products, and to advise and consult with the public with respect to the plans and designs which are involved in the use of said products and with respect to the installation and use thereof. Thompson did in fact assist in the planning and designing of, and as such wholesale distributor did distribute and cause to be used, the electrical equipment involved in the aforesaid air conditioning installation. 11. Both General and Thompson knew, or in the exercise of ordinary care should have known, of the defective condition of said equipment and of the danger from fire caused thereby. 12. The defendant, Conditioned Air, Inc., hereinafter separately referred to as Conditioned Air, planned, designed and installed said air conditioning equipment, maintained and serviced the same, was in complete charge of said installation, maintenance and service, and was in fact engaged in servicing and making changes in said system in an effort to make it workable and to perform the use and purpose for which it was purchased, at and immediately prior to the time of said fire. 13. The defendants, General, as the producer, and Thompson, as the Georgia wholesale distributor, were negligent, and their negligence was a proximate cause of said fire, in the following respects: (a) In producing and supplying defective electrical equipment which created a fire hazard and which constituted a danger to life and property; (b) In permitting such defective equipment to be installed by Conditioned Air in petitioner’s building; (c) In failing to adequately warn Conditioned Air and petitioner of the danger involved in the installation and use of said equipment; (d) In failing to adequately and properly advise Conditioned Air with respect to the installation of said equipment; (e) In failing to provide adequate safeguards against fire from the installation and use of said defective equipment. 14. Defendant, Conditioned Air, was negligent and its negligence constituted a proximate cause of said fire loss, in the following respects: (a) In [594] using and permitting the use of equipment which constituted a fire hazard; (b) In failing to comply with the national electrical or Macon electrical codes in the electrical installation in the vicinity of the duct heating elements for the following reasons: (1) The 230 volt conductors supplying the heating elements were not enclosed in conduit. (2) The splices made between conductors were not installed in metallic boxes, and were not insulated. (3) The connections to the controlling-relays and the heating elements were not made in a metallic enclosure, (c) In poorly accomplishing the installation of the heating elements in the duct work with respect to the location of the opening made in the side of the duct, the ragged edges, and the method of support, the presence of a steel bar across the top of the element supports tending to cause the lower portion to contact the duct; (d) In failing to leave adequate electrical clearances between the lower portion of the No. 2 heating element and the bottom of the duct, establishing a partial or high resistance contact with the duct; (e) In failing to provide protection, electrically, other than the 6-ampere fuses in the safety switches, which would not melt until at least 6900 watts of heat was developed at 115 volts. 15. The foregoing acts of negligence of General, Thompson and Conditioned Air concurred to cause the said fire loss.”

The recompiled petition does not state a new and distinct cause of action when viewed in light of allegations of the original petition. The allegation in the recompiled petition that Thompson Company was the agent of General Electric does not change the cause of action for the reason that merely designating a party as a “distributor” does not import either agency or an independent contractor relationship as it does not disclose whether the employer exercises control over the one employed. The allegation is in the nature of a duplicitous one and in the absence of a special demurrer specifically pointing out the defect the plaintiff could have shown liability on either premise if the facts so warranted. If there had been a demurrer here based on uncertainty or duplicity an amendment electing to allege agency would not have been the adding of a new cause of action. This is especially true here in view of the allegations of the [595] duties and practices of the distributor in the original petition. The court erred in sustaining Thompson Company’s objections to that part of the recompiled petition which' substituted the allegation of “agency” for “distributorship,” the latter of which was contained in the original petition.

Free access — add to your briefcase to read the full text and ask questions with AI

Hatcher v. General Electric Co., 145 S.E.2d 647, 112 Ga. App. 585, 1965 Ga. App. LEXIS 781 (Ga. Ct. App. 1965).

145 S.E.2d 647 (Hatcher v. General Electric Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

General Motors Corporation v. Jenkins
152 S.E.2d 796 (Court of Appeals of Georgia, 1966)