Hasan v Macerich Co. 2024 NY Slip Op 30895(U) March 19, 2024 Supreme Court, New York County Docket Number: Index No. 151984/2020 Judge: Paul A. Goetz Cases posted with a "30000" identifier, i.e., 2013 NY Slip Op 30001(U), are republished from various New York State and local government sources, including the New York State Unified Court System's eCourts Service. This opinion is uncorrected and not selected for official publication. INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
SUPREME COURT OF THE STATE OF NEW YORK NEW YORK COUNTY PRESENT: HON. PAUL A. GOETZ PART 47 Justice ----------------------------------------------------------------- ----------------X INDEX NO. 151984/2020 MOHAMMED HASAN, 07/18/2023, MOTION DATE 07/21/2023 Plaintiff,
- V - MOTION SEQ. NO. _ _0_02_00_3_ _
THE MACERICH COMPANY, MACERICH QUEENS CENTER LIMITED PARTNERSHIP, MACERICH PROPERTY MANAGEMENT COMPANY, THE MACERICH DECISION + ORDER ON PARTNERSHIP, L.P., THE CADILLAC FAIRVIEW CORPORATION LIMITED, MAC. COSMETICS, INC., MOTION
Defendants. ------------------------------------------------------------------- --------------X
THE MACERICH COMPANY, MACERICH QUEENS CENTER Third-Party LIMITED PARTNERSHIP, MACERICH PROPERTY Index No. 595502/2020 MANAGEMENT COMPANY, THE MACERICH PARTNERSHIP, L.P., THE CADILLAC FAIRVIEW CORPORATION LIMITED, MAC. COSMETICS, INC.
Plaintiffs,
-against-
ABC IMAGING, INC.
Defendant. --------------------------------------------------------------------------------X
THE MACERICH COMPANY, MACERICH QUEENS CENTER Second Third-Party LIMITED PARTNERSHIP, MACERICH PROPERTY Index No. 595718/2021 MANAGEMENT COMPANY, THE MACERICH PARTNERSHIP, L.P., THE CADILLAC FAIRVIEW CORPORATION LIMITED, MAC. COSMETICS, INC.
DEZAIO PRODUCTIONS, INC., A NEW JERSEY CORPORATION
Defendants. -------------------------------------------------------------------------------- X
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 1 of 15 Motion No. 002 003
1 of 15 [* 1] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
The following e-filed documents, listed by NYSCEF document number (Motion 002) 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81,82,83, 84, 85,86, 87, 88, 89, 90,91,92, 93, 94,95,96, 97, 98, 99, 134, 160, 168, 174, 175, 176, 192, 193, 194, 195, 196, 197, 198,199,200,201,202,203,204, 205,206,207,208,209,210,211,212,213,214,215,216,217,218,245,246,248,249,254,257,258, 259,260,261,262,263,264,269,270,271,272,273,274,275,276,277,278 were read on this motion to/for SUMMARY JUDGMENT(AFTER JOINDER
The following e-filed documents, listed by NYSCEF document number (Motion 003) 100, 101,102,103, 104,105,106,107,108,109,110,111,112,113,114,115,116,117,118,119,120,121,122,123,124, 125,126,127,128,129,130,131,132,161,169,177,178,179,180,181,182,183,184,185,186,187, 188,189,190,191,219,220,221,222,223,224,225,226,227,228,229,230,231,232,233,234,235, 236,237,238,239,240,241,242,243,244,247,250,251,252,253,255,265,266 were read on this motion to/for JUDGMENT-SUMMARY
In this Labor Law personal injury action, plaintiff Mohammed Hasan moves for summary
judgment as to liability on his Labor Law§ 240(1) claim as (MS #2) against defendants
Macerich Property Management Company, LLC (i/s/h/a The Macerich Company, Macerich
Property Management Company, The Macerich Partnership, L.P. and The Cadillac Fairview
Corporation Limited); Queens Center SPE LLC (i/s/h/a Macerich Queens Center Limited
Partnership); and M.A.C. Cosmetics Inc. (collectively "Defendants").
Third-party defendant, ABC Imaging Co. ("ABC") cross-moves (on MS #2) for summary
judgment, dismissing plaintiffs Labor Law 240(1) claim. ABC also cross-moves for summary
judgment seeking to dismiss the third-party claims for common law indemnity, contribution,
contractual indemnity, and breach of contract for failure to procure insurance asserted against
them by defendant/ third-party plaintiffs.
Defendants/ third-party plaintiffs separately move (MS #3) for summary judgment on
their contractual indemnification, and breach of contract for failure to procure insurance claims
asserted against ABC. They also move for summary judgment dismissing plaintiffs common
law negligence, and violations of Labor Law§ 200, 240(1), and 241(6) claims as against them.
BACKGROUND
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 2 of 15 Motion No. 002 003
2 of 15 [* 2] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
Plaintiff was an employee of ABC, and was working on installing a temporary wall or
barricade in from of the M.A.C. Cosmetics store at the Queens Center Mall on January 8, 2020 at
approximately 1:30 AM (NYSCEF Doc 131 ,i 1). Defendant, Queens Center SPE LLC i/s/h/a
Macerich Queens Center Limited Partnership (hereinafter referred to as Queens Center SPE),
was the owner of the Queens Center Mall located in Elmhurst, Queens, New York (NYSCEF
Doc No 66 ,i 4). Defendant, Macerich Property Management Company LLC (i/s/h/a The
Macerich Company, Macerich Property Management Company, The Macerich Partnership, L.P.
and The Cadillac Fairview Corporation Limited) was the property management company for the
Queens Center Mall on January 8, 2020 (id. ,i 2). Defendant MAC Cosmetics was a lessee of
defendant Queens Center SPE (id. at ,i 8) Defendant, The Macerich Partnership, L.P. entered into
an agreement with Third-Party defendant ABC for the purpose of ABC installing barricades in
front of tenants' stores in the Macerich Malls throughout the United States (NYSCEF Doc No
175 i15).
The temporary wall ran in front of the MAC store (NYSCEF Doc No 66 ,i 13). At the top
of the wall was a section known as a "Gerry board" and it was connected at the top of the
temporary wall to the storefront (id.). To get his ladder in to position to install the Gerry boards
plaintiff would wiggle his ladder to move it while he was standing on it, a practice he observed
his supervisor Mohammed Juned also perform (id. at ,i 19). No other equipment was offered to
plaintiff other than the ladder (id. at ,i 20). Plaintiff alleges that he was on the top rungs of a
ladder, and while attempting to lift the Gerry board into place he fell from the ladder injuring
himself (id. at ,i 17).
Plaintiff asserts claims under common law negligence, and Labor Law § 200, 240( 1), and
241(6) (NYSCEF Doc No. 1). Defendants/ third-party plaintiffs assert claims against ABC for
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 3 of 15 Motion No. 002 003
3 of 15 [* 3] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
common law indemnity, contribution, contractual indemnity, and breach of contract for failure to
procure insurance (NYSCEF Doc No 7).
DISCUSSION
Labor Law§ 240(1)
Labor Law 240( 1) states that:
All contractors and owners and their agents, except owners of one and two-family dwellings who contract for but do not direct or control the work, in the erection, demolition, repairing, altering, painting, cleaning or pointing of a building or structure shall furnish or erect, or cause to be furnished or erected for the performance of such labor, scaffolding, hoists, stays, ladders, slings, hangers, blocks, pulleys, braces, irons, ropes, and other devices which shall be so constructed, placed and operated as to give proper protection to a person so employed
The statute was "designed to prevent those types of accidents in which the scaffold, hoist, stay,
ladder or other protective device proved inadequate to shield the injured worker from harm
directly flowing from the application of the force of gravity to an object or person" (Hill v Stahl,
49 AD3d 438,442 [1st Dept 2008]). "To prevail on a Labor Law§ 240(1) claim, a plaintiff must
demonstrate the existence of an elevation-related hazard contemplated by the statute and that the
failure to provide an appropriate safety device proximately caused injury" ( Gonzalez v DOLP
205 Properties IL LLC, 206 AD3d 468,469 [1st Dept 2022]). [A]n accident alone does not
establish a Labor Law § 240( 1) violation or causation [and] 'strict' or 'absolute' liability is
necessarily contingent on a violation of section 240(1) (Blake v Neighborhood Haus. Services of
New York City, Inc., I NY3d 280,289 [2003]). While, "comparative negligence is not a defense
to absolute liability under the statute ... there can be no liability under section 240(1) when ...
the worker's actions ... are the "sole proximate cause" of the accident" (id. at 289-290).
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 4 of 15 Motion No. 002 003
4 of 15 [* 4] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
As a threshold matter, defendants first argue that Labor Law§ 240(1) does not apply to
defendants Macerich Property Management Company, The Macerich Company, The Cadillac
Fairview Corporation Limited, Queens Center SPE LLC (i/s/h/a Macerich Queens Center
Limited Partnership), and M.A.C. Cosmetics because pursuant to the terms of the statue, Labor
Law§ 240 only applies to "contractors and owners ... who contract for ... the work." (NYSCEF
Doc 176 at 3). They further argue that only defendant, The Macerich Partnership, contracted for
the work, but they too can not be found liable because they are not an owner of the property (id.)
However, the full section defendants rely on states "All contractors and owners and their
agents, except owners of one and two-family dwellings who contract for but do not direct or
control the work" (NY LABOR§ 240[1]). The modifier defendants rely on only refers to owners
of one or two-family dwellings. The purpose of this language is to exempt ownership liability to
single and two-family homeowners, and not as defendants argue to exempt owners oflarge
buildings who do not directly contract for the work (Urquiza v Park and 76th St., Inc., 172 AD3d
518 [1st Dept 2019]). Indeed," Liability rests upon the fact of ownership and whether
[defendants] had contracted for the work or benefitted from it are legally irrelevant" (Gordon v
E. Ry. Supply, Inc., 82 NY2d 555, 560 [1993]).
Here, defendant Queens Center SPE LLC (i/s/h/a Macerich Queens Center Limited
Partnership), is the owner of the property and defendant Macerich Property Management
Company, LLC (i/s/h/a The Macerich Company, Macerich Property Management Company, The
Macerich Partnership, L.P. and The Cadillac Fairview Corporation Limited 1) contracted with
1 Defendants simultaneously refer to each named defendants as separate identities but also refer to the group of defendants being Macerich Property Management Company, LLC. Since defendant admits that Macerich Property Management Company, LLC is the property management company which managed the Queens Center Mall and refers to all parties as if they were agents ofMacerich Property Management Company, LLC, the claims can not be dismissed against any of the named defendants. 151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 5 of 15 Motion No. 002 003
5 of 15 [* 5] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
defendant third-party defendant ABC to have the barricade installed. Thus, all the named
defendants are subject to liability under Labor Law§ 240(1) as contractors, owners, and their
agents.
Plaintiff argues that he is entitled to summary judgment on his Labor Law § 240( 1) claim
because the ladder provided to him was not tall enough for the work being performed, and that
additional safety equipment should have been provided for the work. Plaintiff submits his own
deposition testimony that while he was attempting to install a Gerry board at the top of the
barricade, he had to lift the board above the ladder, and during that process he lost his balance
and fell (NYSCEF Doc No 77 at 94:23 - 95:4). Plaintiff also submits an affidavit from a
construction safety expert, Anthony Corrado (NYSCEF Doc No 92). Mr. Corrado opines that,
"because the task necessitated [plaintiff] to reach forward and upward to connect the Gerry board
to the storefront wall; and the type of work required him to use two hands to perform the task of
attaching the Gerry board; and [plaintiff] could not access the highest point of work while using
a IO-foot ladder2" that the ladder was not a safe device for the required work (NYSCEF Doc No
92 at p 3).
In opposition defendants argue that plaintiff has not established that the ladder was
defective. Further they argue, that even if the protection provided was not adequate, the claim
should be dismissed because plaintiffs testimony establishes that he his actions were the sole
proximate cause of the accident. Defendants note that in his deposition, plaintiff admits that in
order to move the ladder closer to the wall, plaintiff would wiggle the ladder while standing on
2 While there is an issue of fact regarding the height of whether the ladder was 10 or 12 feet tall, Mr. Corrado also opined that "I add that a 12 foot ladder would likewise have been unsafe, as was the 10 foot one that was provided and my findings and opinions would be the same if the ladder had been 12-foot high, (NYSCEF Doc No 92 at p 4). Plaintiff has also submitted photographs which show that the ladder was clearly shorter than the height of the barricade (NYSCEF Doc No 258). 151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 6 of 15 Motion No. 002 003
6 of 15 [* 6] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
it, to inch it into a better position (NYSCEF Doc 77 at 101 :4 - 103: 15). Defendants argue that
this use of the ladder was inappropriate and was the sole proximate cause of his fall.
Testimony that establishes that a ladder was "too short to enable [performance of the
task] establishes prima facie that defendants failed to provide him with an adequate safety device
under Labor Law§ 240 (1) and that their failure proximately caused his injuries" (Cuentas v
Sephora USA, Inc., 102 AD3d 504 [1st Dept 2013]; see alsoAjche v Park Ave. Plaza Owner,
LLC, 171 AD3d 411,413 [1st Dept 2019] [finding that testimony establishing that a worker was
"standing on the second to the last rung [of a ladder], with his hands over his head toward the
duct, which he could barely reach ... establishes prima facie that the ladder did not provide
proper protection for plaintiff']). "Because the record is clear that the ladder did not prevent him
from falling, his inability to identify the precise manner in which he fell is immaterial" (id.).
Here, plaintiff's testimony and the testimony of expert witness Mr. Corrado, establishes
that the ladder was not tall enough to safely install the Gerry boards. Further, plaintiff's
testimony establishes that he did not fall during the process of wiggling the ladder but rather, 30
seconds after he stopped repositioning the ladder, "when I tried to fix the gerry board, that's
when I fell" (NYSCEF Doc No 77 at 108: 11 - 108: 12). Plaintiff has established that he was not
provided with adequate safety equipment, and defendants have failed to create an issue of fact.
Accordingly, he will be granted summary judgment as to liability on his Labor Law§ 240(1)
claim.
Labor Law 241 (6)
Defendants also move for summary judgment on plaintiff's Labor Law§ 241(6) claim.
Plaintiff does not submit any opposition to this portion of the motion. However, defendants'
arguments for dismissal are the same as they presented for dismissal of the Labor Law§ 240(1)
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 7 of 15 Motion No. 002 003
7 of 15 [* 7] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
claim. Specifically, they argue that the statute can not apply to them because of the statute uses
the same language as 240(1) stating "All contractors and owners and their agents, except owners
of one and two-family dwellings who contract for but do not direct or control the work, when
constructing or demolishing buildings or doing any excavating in connection therewith, shall
comply with the following requirements" (Labor Law § 241 ). As discussed above the exception
does not apply to defendants.
Additionally, they argue that plaintiff was the sole proximate cause of his injury.
However as discussed above plaintiff has submitted evidence establishing, he was not the sole
proximate cause of the injury and thus the claim can not be dismissed on these grounds.
Accordingly, defendants' motion for summary judgment on plaintiffs Labor Law§ 241(6) claim
will be denied.
Labor Law§ 200 and Common Law Negligence
"Section 200 of the Labor Law is a codification of the common-law duty imposed upon
an owner or general contractor to provide construction site workers with a safe place to work"
(Comes v New York State Elec. and Gas Corp., 82 NY2d 876, 877 [1993]). "Where the alleged
defect or dangerous condition arises from the contractor's methods and the owner exercises no
supervisory control over the operation, no liability attaches to the owner under the common law
or under Labor Law§ 200" (id.).
Here, it is undisputed that the owner did not exercise any control over the operation and
plaintiff does not submit opposition to this part of the motion. Accordingly, defendants will be
granted summary judgment on plaintiffs Labor Law § 200 and common law negligence claims
and the claims will be dismissed.
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 8 of 15 Motion No. 002 003
8 of 15 [* 8] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
Timeliness of Cross-Motion
As an initial matter, defendants/ third-party plaintiffs object to third-party defendant,
ABC's cross-motion for summary judgment as untimely. Pursuant to the status conference order
dated March, 10, 2023 all dispositive motions were to be made no later than 60 days after the
filing of the note of issue (NYSCEF Doc No 45). The Note oflssue was filed on May 25, 2023
making the deadline to file dispositive motions July 24, 2023 (NYSCEF Doc No 46). However a
"cross motion for summary judgment made after the expiration of the [deadline for making
dispositive motions] may be considered by the court, even in the absence of good cause, where a
timely motion for summary judgment was made seeking relief nearly identical to that sought by
the cross motion" (Alonzo v Safe Harbors of the Hudson Haus. Dev. Fund Co., Inc., I 04 AD3d
446, 448-49 [1st Dept 2013]).
Here, ABC cross moves on plaintiffs summary judgment motions seeking to dismiss
plaintiffs Labor Law§ 240(1) claim, and to dismiss defendants/ third-party plaintiffs common
law indemnity, contribution, contractual indemnity, and breach of contract for failure to procure
insurance claims. It should be noted that defendants / third-party plaintiffs did not cross move on
any of its third-party claims against ABC on plaintiffs summary judgment motion (MS #2).
Defendants / third-party plaintiffs did however move for summary judgment in MS #3 on their
contractual indemnification and breach of contract for failure to procure insurance claims. ABC
could have but failed to separately cross-move on defendants/ third-party plaintiffs' summary
judgment motion (MS #3) seeking to dismiss the same claims. Notwithstanding this procedural
defect, since MS #2 and MS #3 are being decided together, that portion of ABC's cross-motion
on MS #2 seeking dismissal of the contractual indemnification and breach of contract for failure
to procure insurance will be deemed timely and will be decided on the merits. However, since
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 9 of 15 Motion No. 002 003
9 of 15 [* 9] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
third-party plaintiffs did not move for summary judgment on their common law indemnity and
contribution claims, there is no motion that is seeking "identical [relief] to that sought by the
[cross-motion]" and thus that portion of the cross-motion is untimely and must be denied
(Alonzo, 104 AD3d at 448-49).
Contractual Indemnification
"Entitlement to full contractual indemnification requires a clear expression or
implication, from the language and purpose of the agreement as well as the surrounding facts and
circumstances, of an intention to indemnify" (Martins v Little 40 Worth Assoc., Inc., 72 AD3d
483,484 [1st Dept 2010]). "A contractual indemnification provision must be strictly construed to
avoid imposing a duty which the parties did not intend" (Baginski v Queen Grand Realty, LLC,
68 AD3d 905, 907 [2d Dept 2009]).
The contract between The Macerich Partnership, L.P and ABC (the "Barricade
Agreement") contains an indemnification clause that provides:
Contractor Indemnification. Except to the extent caused by Macerich's or Macerich Indemnitee's gross negligence or willful misconduct, or breach of this Agreement, Contractor agrees to defend, indemnify, and hold harmless Macerich, the owner(s) of the Center and Its management company, and The Macerich Company, and all owned, managed, controlled, non-controlled and subsidiary companies, corporations, entities, members, joint ventures, limited liability companies and partnerships and all of their constituent partners and members and such other entities as Macerich and any person or entity having an ownership or possessory interest in any portion of the Center (including, without limitation, lessors or tenants), and each of them, and each of their respective affiliates, partners, directors, officers, agents, employees, representatives, consultants, contractors, and insurers (collectively, "Macerich Indemnitee(s)"), utilizing legal counsel acceptable to Macerich, from and against any and all claims, damages, losses and expenses (including, without limitation, all fees and expenses of engineers, architects, attorneys, paralegals, experts and all court, arbitration or other dispute resolution costs), to the extent arising out of or resulting from any of the following: (i) any accident, injury, damage,
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 10 of 15 Motion No. 002 003
10 of 15 [* 10] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
fine, penalty or resulting costs whatsoever caused to any person or property arising directly out of the business conducted in or the use or occupancy of the Centers or occurring in on, from, or about the Centers or any part of them, or (ii) arising directly or indirectly from any violation oflaw, or the ADA, or (iii) the Barricades and (iv) any alleged or actual act or omission of Contractor or any concessionaire or their respective licensees, servants, agents, employees, or contractors, and from and against any and all costs, expenses, attorneys' fees and liabilities incurred in connection with any claims or proceedings brought.
ABC contends that while the Barricade Agreement states that "this Agreement shall
commence on January 6, 2020 (the "Effective Date"), and shall terminate five (5) years later on
December 31, 2024, unless sooner terminated as provided for herein", that since the Agreement
was signed on March 2, 2020 it did not understand that the effective date was retroactive. Phillip
Cockrell, the former Controller of ABC and the agent who signed the agreement for ABC
testified that "when I look at a contract, I looked at the date it initiates, and it is a five-year
agreement and did not notice that it says January 6th, which wouldn't make sense to me, I never
heard of a retroactive contract, so it's not something that I was looking for" (NYSCEF Doc No
210 at 45:5 - 45: 12). ABC argues that as the injury to plaintiff occurred on January 8th, 2020, it
would not have agreed to the contract had it known of the agreement's retroactive effect.
"[W]hen interpreting an unambiguous contract term [e]vidence outside the four comers
of the document is generally inadmissible to add to or vary the writing" (R/S Assoc. v New York
Job Dev. Auth., 98 NY2d 29, 33 [2002] [internal quotation marks removed]). "An
indemnification 'clause in a contract executed after a plaintiffs accident may ... be applied
retroactively where evidence establishes as a matter of law that the agreement pertaining to the
contractor's work was made as of [a pre-accident date], and that the parties intended that it apply
as of that date"' (Kolakowski v 10839 Assoc., 185 AD3d 427,428 [1st Dept 2020] [internal
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 11 of 15 Motion No. 002 003
11 of 15 [* 11] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
quotation marks removed]; see also Pena v Chateau Woodmere Corp., 304 AD2d 442 [1st Dept
2003] [finding that when a "retroactive term [in an indemnification provision] ... is clear and
unambiguous on its face" then it should be applied from the stated date"]).
Here, the first term of the Barricade Agreement states:
1. TERM . The "Term" of this Agreement shall commence on January 6, 2020 (the "Effective Date"), and shall terminate five (5) years later on December 31, 2024, unless sooner terminated as provided for herein. Notwithstanding the foregoing, Macerich may terminate this Agreement, at any time during the Term, with or without cause, on thirty (30) days prior written notice thereof as to any Center or all Centers. Contractor shall have 60 days from the date of termination to remove the Barricades from the Center. Notwithstanding the foregoing, should Macerich require the removal of a Barricade sooner, Contractor shall remove the Barricade from the storefront within twenty-four (24) hours of the request, but Contractor shall continue to have sixty (60) days to remove the Barricade from the Center. For the avoidance of doubt, if Macerich requires the removal of a Barricade sooner, Contractor shall remove the Barricade from in front of the tenants space within twenty-four (24) hours of the request, but the Contractor shall still have 60 days to remove the taken down Barricade from the Center. (NYSCEF Doc No. 195 at p 1).
The Barricade Agreement is clear and unambiguous on its face and the its meaning must
be interpreted based on its unambiguous terms. Therefore, the commencement date of the
Barricade Agreement was January 6, 2020 and ABC's motion for summary judgment will be
denied based on this theory.
ABC also argues that the indemnity provision is invalid as it violates General Obligation
Law§ 5-321. General Obligations Law§ 5-322.1 states:
a contract or agreement relative to the construction ... purporting to indemnify or hold harmless the promisee against liability for damage arising out of bodily injury to persons or damage to property contributed to, caused by or resulting from the negligence of the promise ... is against public policy and is void and unenforceable
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 12 of 15 Motion No. 002 003
12 of 15 [* 12] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
"[A] n agreement calling for full indemnification is void and unenforceable under General
Obligations Law § 5-322.1 where the indemnitee is found to be at least partially negligent"
(Pardo v Bialystoker Ctr. & Bikur Cholim, Inc., IO AD3d 298, 301 [1st Dept 2004]). "However,
the statute does not bar enforcement of a contractual indemnity provision where the indemnitee
was held strictly liable under Labor Law § 240(1) and there was no evidence of its negligence"
(Masciotta v Morse Diesel Intl., Inc., 303 AD2d 309, 312 [1st Dept 2003] [internal quotation
marks removed]).
Here, the Barricade Agreement requires ABC to indemnify defendants/ third-party
plaintiffs for claims arising out the performance of ABC's work, except to the extent caused by
defendant's gross negligence or willful misconduct. It is undisputed that the accident occurred
during the performance of ABC's work as plaintiff was an ABC employee performing the work
that was to be done under the Barricade Agreement. Further, since liability under Labor Law §
240(1) is strict liability and there is no evidence of direct negligence by defendants/ third-party
plaintiffs, the indemnity provision is triggered and ABC must defend and hold defendants / third-
party plaintiffs harmless. Accordingly, summary judgment will be granted in defendants / third-
party plaintiffs favor on their contractual indemnification claim against ABC.
Breach of Contract for Failure to Procure Insurance
A party seeking summary judgment based upon an alleged failure to procure insurance
naming it as an additional insured must demonstrate that ( 1) a contract provision required such
insurance must be procured and (2) the provision was not complied with (Marquez v L & M.
Dev. Partners, Inc., 141 AD3d 694 [2nd Dept 2016]).
ABC's insurance obligations in the Barricade Agreement state:
Macerich, the owners of each of the Centers, The Macerich Company, and all owned, managed, controlled, non-controlled and
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page 13 of 15 Motion No. 002 003
13 of 15 [* 13] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
subsidiary companies, corporations, entitles, joint ventures, limited liability companies and partnerships and all of their constituent partners and members shall be named as additional Insureds to the extent of the insurance limits prescribed in this section and to the extent of the indemnification obligations of Contractor described herein.
A defendant will be entitled to dismissal for failure to procure insurance where it establishes that
it procured the requisite insurance (Georges v Resorts World Casino New York City, 189 AD3d
1549, 1551 [2d Dept 2020]).
Here, ABC has provided the Certificate of Insurance issued to the Macerich defendants
(NYSCEF Doc No 239). Accordingly, ABC is entitled to dismissal of the breach of contract for a
failure to procure insurance claim.
Based on the foregoing, it is
CONCLUSION
ORDERED that the plaintiff's motion (MS #2) is granted on the issue of liability on his
Labor Law § 240(1) claim; and it is further
ORDERED that the part of defendants' motion (MS #3) to dismiss plaintiffs common
law negligence and Labor Law § 200 claims is granted; and it is further
ORDERED that the part of defendants' motion (MS #3) to dismiss plaintiffs Labor Law
§ 241(6) claim is denied; and it is further
ORDERED that the part of defendants/third party plaintiffs' motion (MS #3) for
summary judgment on their contractual indemnification is granted as against third-party
defendant ABC; and it is further
ORDERED that third-party defendant's cross motion (on MS # 2) to dismiss
defendants/third party plaintiffs' breach of contract for a failure to procure insurance is granted
151984/2020 HASAN, MOHAMMED vs. MACERICH COMPANY Page14of15 Motion No. 002 003
14 of 15 [* 14] INDEX NO. 151984/2020 NYSCEF DOC. NO. 280 RECEIVED NYSCEF: 03/19/2024
and the claim is dismissed.
3/19/2024 DATE PAUL A. GOETZ, J.S.C.
~ ~ CHECK ONE: CASE DISPOSED NON-FINAL DISPOSITION
□ DENIED □ GRANTED GRANTED IN PART OTHER
APPLICATION: SETTLE ORDER SUBMIT ORDER