Rodman, J.

Appellant assigns several errors, but the basic question is this: Does the evidence, viewed in the light most favorable to plaintiff, suffice to impose a duty on defendant to warn of the specific hazard complained of? Unless this question can be answered in the affirmative, the judgment must be affirmed.

Necessarily the answer requires a review of the evidence. Summarized, the evidence shows these facts: The Highway Commission, desirous of facilitating the flow of traffic on U. S. 1, in the summer of 1957, contracted with defendant to construct the road at a new location so as to by-pass Henderson. The work to be done covered a distance slightly in excess of 10 miles. U. S. 1 is a north-south highway. Highway 158 is an east-west road. On and prior to 27 December 1957 these roads merged into a single highway near Greystone, three miles northeast of Henderson. From the point of merger they continued northeastwardly as a single highway some 10-12 miles to Nor-lina. The junction of 1 and 158 near Greystone was the northern terminus of defendant’s work. The southern terminus was near Kit-trell, some seven miles south of Henderson. To facilitate the movement [199]*199of traffic at the junction, the contract required the construction of a bridge over 158, a short distance west of the point where the two roads merged. Traffic moving north but desiring to go west on 158 would proceed up a ramp and pass over this bridge, then down an arc or. semicircle and into 158 headed westwardly and in the right or northern lane. It thus permitted such travelers to pass over eastbound traffic on 158 rather than intersecting it at that level. The bridge was about 14 feet above 158. The radius of the semicircle leading down from the bridge to 158 was short, resulting in a sharp right curve and decline. (The record does not disclose the length of this arc or the grade.) Trafile moving north and expecting to continue on No. 1 would not use the overpass. Such traffic would remain in its right-hand lane, curving eastwardly at ground level to the junction of 1 and 158. Southbound travel from Norlina would use the ramp to pass over 158. The ramp on the south side of the bridge was straight. The curve was on the north side. Travel from Norlina wishing to go west on 158 would remain at ground level, continuing in its right-hand lane, and pass under the bridge. The road, as designed by the Highway Commission, permitted all traffic to remain in its right-hand lane without having to cross another line at ground level.

The contract between the Highway Commission and defendant contained these provisions: “The contractor shall maintain the work during construction and until the work is finally accepted.”

“The time of actual completion of a project shall be considered the date on which all work has been satisfactorily completed in accordance with the contract and these specifications.”

“The contractor shall at all times so conduct his work as to insure the least possible obstruction to traffic. The safety and convenience of the general public and the residents along the highway and the protection of persons and property shall be provided for by the contractor at all times.”

“The contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient red lights, danger signals, detour and other signs, provide a sufficient number of watchmen and take all necessary precautions for the protection of the work and the safety of the public.”

“The contractor shall indemnify and save harmless the commission . . . because of any act or omission, neglect, or misconduct of said contractor.”

“The contract will be considered complete when all work has been finished, the final inspection made by the Engineer, and the project accepted by the Commission. The contractor’s responsibility shall then cease, except as set forth in his bond.”

[200]*200When any project, or portion thereof, or any structure, has been completed, it may be opened to traffic, if and as deemed expedient by the Engineer. Such opening shall not be held in any way a final acceptance of the work or any part of it or a waiver to any provisions of the contract.”

Plaintiff began work in the summer of 1957. The work was accepted and final payment made in the summer of 1958. Defendant, having completed its work except for the construction of some drains and other details not related to the movement of traffic over the road, requested permission from the Highway Commission to suspend operations until the weather improved in the spring. At that time traffic was prevented from using the overpass by blockades.

Acting on this request, the Highway Commission erected traffic signals at points selected by it. This was done on 21 December 1957. When these signs had been erected, the barricades were removed and the road opened for traffic.

On the afternoon of 27 December 1957 plaintiff’s intestate, hereafter abbreviated to plaintiff, her husband, Michael Madak, and her kinsman, David King, left Fort Bragg in her husband’s automobile. Their destination was Detroit, Michigan. The husband drove from Fort Bragg to a point just north of Raleigh. There he changed places with King, who was driving at the time of the accident which happened about 7:00 p.m. Plaintiff was in the back seat. King testified: “We planned to follow U.S. #1 from Raleigh to Richmond. As we approached Plenderson, we drove on the by-pass around the town. The surface of this road was very dark asphalt. The surface of the road was smooth and sufficiently wide for our travelling purposes, and the road was in good condition the whole length of the by-pass. I do not remember the bridge or seeing the concrete guard rails on the bridge, but I do remember the incline. I observed one speed sign which I would say was a quarter or half a mile in distance back from the scene of the accident. I might have seen other signs but I was looking for signs pointing to Richmond where I was going. I did not see a Route #1 sign directing traffic off to the right, or a second sign directing traffic to U.S. 1 to turn to the right. I might have seen a sign with the name ‘Norlina’ and an arrow pointing to the right but I did not know where Norlina was. I cannot say positively that I did see that sign, nor did I see the sign that read ‘Stop Sign Ahead’ in the vicinity of the accident. I was traveling at a speed between 45 and 50 m.p.h.” He further stated that he did not see any signs of any description.

There was evidence that the posted speed limit at the point re-fered to by King was 55 m.p.h., but a safe speed to negotiate the curve and decline from the bridge to enter 158 would be 25 m.p.h., and the [201]*201vehicle in which plaintiff was riding ran off the road because of the inability of the driver to negotiate the curve and decline at the speed at which he was travelling.

At the time of the accident, King, the driver, should have seen on the right-hand side of the road, if he had been observant, standard highway signs erected by the Commission which gave the following information: (1) A sign saying Junction 158. This sign was located some 1000 feet or more south of the point where U.S. 1 divided; (2) 300 to 500 feet north of the junction sign, a sign showing that Route 1 had a right turn or curve, No. 158 west was straight ahead, 158 east likewise had a right turn or curve; (3) about 300 feet north of the second sign a sign with directions similar to those on the second sign; (4) at the point where the right and left lanes of U.S.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Knighten v. Barnhill Contracting Co.
468 S.E.2d 564 (Court of Appeals of North Carolina, 1996)

Cite This Page — Counsel Stack

Bluebook (online)
123 S.E.2d 504, 256 N.C. 197, 1962 N.C. LEXIS 424, Counsel Stack Legal Research, https://law.counselstack.com/opinion/gilliam-v-propst-construction-co-nc-1962.