Gardner v. United States

68 F. Supp. 598, 1946 U.S. Dist. LEXIS 1969
CourtDistrict Court, M.D. Tennessee
DecidedSeptember 25, 1946
DocketCiv. No. 616
StatusPublished

This text of 68 F. Supp. 598 (Gardner v. United States) is published on Counsel Stack Legal Research, covering District Court, M.D. Tennessee primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Gardner v. United States, 68 F. Supp. 598, 1946 U.S. Dist. LEXIS 1969 (M.D. Tenn. 1946).

Opinion

DAVIES, District Judge.

The cause was submitted upon the pleadings, evidence, exhibits, and argument of counsel for plaintiff and defendant, and, after due consideration thereof, the Court enters its Findings of Fact and Conclusions of Law, as follows:

Findings of Fact

1. The plaintiff, David W. Gardner, was and is a citizen and resident of Davidson County, Tennessee, and for several years has been engaged in the construction business under the trade name of Gardner Construction Company.

2. The plaintiff’s claim is for money alleged to be due and owing to plaintiff under a written contract with the defendant for the construction and erection of a general hospital located at Humboldt, Tennessee, the amount of the claim being less than $10,000.

3. In August, 1943, the defendant, acting through the Federal Works Agency, Public Buildings Administration, Emergency Operations Unit, publicly advertised for bids for the construction and erection of a 50-bed general hospital at Humboldt, Tennessee, upon' designated terms, conditions, plans and specifications,and all amendments thereof and addenda thereto on file in the office of Dent & Aydelott, Architects, 801 National Bank Building, Memphis, Tennessee, and plaintiff in due course made application for a full and complete copy of [599]*599said plans and specifications and all amendments thereof, and the defendant’s agents furnished to plaintiff a complete copy of such plans and specifications, including Addendum No. 1 attached thereto as part of said specifications, all of which would be used by plaintiff as a basis for submitting his bid for the construction of said hospital. Said specifications provided in part as follows:

“Section 10, Rough Carpentry:

“A. General
“1. This work shall include all labor and materials necessary to complete the work according to the plans and specifications. Furnish all scaffolding, tools, and other equipment as required for the proper completion of the work.
*{»
“B. Materials and Applications
* * * * sfc *
“4. All wall sheathing and wood sub-flooring shall be 1" x 8" shiplap No. 2 common Short Leaf Yellow Pine applied diagonally. All building paper used between siding and sheathing shall be 15 lb. saturated rag felt. Building paper between finish floor and sub-floor shall be 30 lbs. saturated rag felt.
* * * * * #
“Section 12, Interior Finished Carpentry and Millwork:
“A. General ‘
“1. The work shall include all labor and materials necessary to complete the work according to the plans and specifications.
“2. Carefully examine the plans and specifications, and especially details pertaining to concrete, brickwork, etc., ascertaining dimensions and details. It is important that possible discrepancies between the plans and specifications or between the various trades dependent on carpentry work foreseen be reported to the Constructions Engineer.
******
“8. The contractor shall provide and install T' x 4" tongue and Groove B and Better Yellow Pine flooring over all sub-flooring where linoleum finish flooring is required. This flooring shall be blind nailed and sanded to a smooth even surface before installation of linoleum finished floor.
* * sjc * £
“Section 19, Linoleum:
“A. General
“1. Furnish all necessary labor and materials for the installation complete of all linoleum floors, bases and wainscots, counter tops, and other linoleum work according to the plans and specifications.
# í|í ?}; :js %
“B. Materials and application
V v í ¡1-
“6. ‘Armstrong’s’ or equal lining felt shall be bonded to the wood subfloor with ‘Armstrong’ or equal linoleum paste.”

4. The aforesaid Addendum No. 1, issued prior to the receipt of bids, and on which all bids, including that of plaintiff, were made, changed the above specifications as follows:

“Section 19, Linoleum
“Omit all linoleum specified for floors and bases but retain the linoleum for wainscots, counter tops and other linoleum work as shown and specified.
“Where linoleum is indicated for floors and bases, substitute asphalt title as specified below:
“Section 19A, Asphalt Tile
“1. Scope. Where linoleum coverings for floors and bases are indicated on drawings, substitute asphalt tile coverings as herein specified.
******
“5. Lining Felt. Asphalt-saturated and weighing at least 1.40 pounds per square yard, is required over wood subfloors; the felt to be pasted to the subfloor, and the tile stuck to the felt.
“6. Laying. The subfloors shall be clean and dry.
“7. Wood subfloors shall be sound and have close, flush joint. Cover with lining felt pasted over its entire under surface. Lay the felt with butted joints and brush or roll to remove all air and insure permanent adhesion.”

5. Plaintiff filed a formal bid dated October 29, 1943, for the total aggregate base [600]*600sum of $336,400, and the defendant awarded the contract to plaintiff on said bid and in due course a written contract was entered into between the parties for the construction of said hospital for said sum of $336,400, said contract being dated November 10, 1943.

6. During the performance of the contract, a controversy arose between the plaintiff and the Construction Engineer in charge of the project as to the type of wood floor that was specified to be used under the asphalt tile which had by Addendum No. 1 been substituted in lieu of linoleum for finished floors and bases, it being the insistence of plaintiff that the specifications, including Addendum No. 1, did not require a top or finished wood floor under the asphalt tile; on the other hand, it being the insistence of the Construction Engineer in charge of the project that, according to his interpretation, the specifications, including Addendum No. 1, required the installation under the asphalt tile of a finished floor of 1" x 4" Tongue and Groove B and Better Yellow Pine over all subflooring where linoleum had been specified before the issuance of Addendum No. 1. The plaintiff was required by the Construction Engineer in charge of the project to install, and he did install, a finished floor of 1” x 4" Tongue and Groove B and Better Yellow Pine over all subflooring where linoleum had been specified before the issuance of said Addendum No. 1, at a cost to plaintiff of $4,248.37, and it is to recover this amount, with interest, that the plaintiff’s action was brought.

7. The general conditions upon which all bids were required to be based, which were part of the specifications and which were incorporated by reference into the contract between the parties, provided in part as follows:

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
68 F. Supp. 598, 1946 U.S. Dist. LEXIS 1969, Counsel Stack Legal Research, https://law.counselstack.com/opinion/gardner-v-united-states-tnmd-1946.