Fooshee & Hungerford v. City of Victoria

54 S.W.2d 220
CourtCourt of Appeals of Texas
DecidedOctober 19, 1932
DocketNo. 8875.
StatusPublished
Cited by3 cases

This text of 54 S.W.2d 220 (Fooshee & Hungerford v. City of Victoria) is published on Counsel Stack Legal Research, covering Court of Appeals of Texas primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Fooshee & Hungerford v. City of Victoria, 54 S.W.2d 220 (Tex. Ct. App. 1932).

Opinion

FLY, C. J.

This is a suit for $25,000, instituted by appellants against appellee. A general demurrer to the petition was sustained. The facts alleged in the petition must be assumed to be true for the purposes of this appeal.

It was alleged that a regular' election was held as to whether the city of Victoria should issue bonds in the sum of $250,000, the proceeds from the sale of which were to be used for the construction and improvement of the roads, bridges, and streets of said city. The proposition to issue the bonds was favored by the voters of the city and authority given for issuance of the bonds. It was alleged that after the bonds had been voted the city of Victoria entered into a contract with appellants, in terms as follows; unnecessary parts being omitted herefrom:

“First Party contemplates the installation of Street Paving for the City on streets to be hereinafter designated from the proceeds of $250,000.00 bond issue authorized by vote in the City of Victoria September 2nd., 1930, with the property owners to pay a proportionate part of said streets to be hereinafter designated, and Second Party agrees to do all engineering work in connection with making and constructing all such contemplated improvements.
. “A. Second Party agrees to make all necessary field surveys, prepare all plans, estimates and specifications, proposals, contract and bond for work contemplated. Field surveys to include any adjacent areas necessary for establishing drainage provisions.
“B. Plans and specifications to include detailed design of all work necessary to complete the project, including grading, grade and alignment of any drainage ditches, storm sewers, or other drainage provisions necessary to the proper drainage of said street paving.
“C. Supervision of construction to include all assistants, and inspectors necessary to properly supervise the work, preparation of all estimates and the furnishing of any reports of progress or cost data desired by the City.
“D. Compensation as agreed upon shall include all expenses including transportation and testing of materials incidental to the engineering of the project. And it is further agreed that either Mr. Fooshee or Mr. Hungerford is to be present during construction:
“It is further agreed that the work herein undertaken to be done by the Second Party shall be commenced immediately, and same shall be continued with due diligence until completed, the good of all parties concerned being considered, and that First Party, on their part, shall cooperate to the end that said work to be done by and under the supervision of Second Party shall be commenced and completed with due diligence, consistent of the good of all parties concerned.
“For and in- consideration of the' above mentioned and described engineering services, in connection with said street paving which is to be performed by Second Party, the City, First Party, hereby agrees to pay Second Party five per cent (5%) of the total cost of the construction of paving, storm sewers or ditches, including cost of material in construction of same, it being agreed that one per cent (1%) based on the estimated cost of construction to be paid to Second Party upon1 the completion of survey on any one street which may be hereinafter designated, and an additional one per cent (1%) to be paid upon completion and approval of the plans and specifications for the said improvements by First Party. The remainder of five per cent (5%) heretofore mentioned to be paid in proportion to the amount of construction done monthly.”

Appellants allowed a credit of $9,332.19 on a sum alleged to be due them of $24,728; after deducting the said credit, the amount of the indebtedness was $15,395.81, for which the suit was filed. The city seems to have changed mayors, and afterwards, by ordinance, canceled, abrogated, and revoked the contract made with appellants.

It was alleged that the contracts for the building of storm sewers, drainage ditches, and other improvements had already been made and said work practically completed, and that the sum of over $55,000 has been or will be paid for such improvements.

The allegations as to the storm sewers and drainage ditches are as follows:

“Plaintiffs allege that, of said sum of approximately $250,000.00 realized from the sale of said bonds, approximately $55,000.00 has been and will be expended for the con *222 struction of storm sewers, drainage ditches and other improvements contemplated by said contract and bond issue other than the paving of streets in said City. Plaintiffs are informed and believe, and therefore allege, that contracts have already been made, since the execution of the contract herein sued upon, between said City and various contractors, and work has been begun, for the construction of storm sewers and drainage ditches in said City, being those mentioned in paragraph X hereof, and an additional storm sewer beginning at the intersection of Church Street and De Deon Street in said City and extending eastward along said Church Street to Depot Street, thence northward along said Depot Street to Goodwin Avenue, the length of eight blocks, all of which storm sewers and ditches will be constructed for the estimated cost of approximately $49,350.00, including cost of en-: gineering, such estimated cost to be paid for out of the proceeds of said bond issue, without any contribution by owners of prop; erty situated adjacent thereto. The plaintiffs allege that an additional amount of approximately $5,650.00 will probably be expended out of the proceeds of said bond issue for storm sewers and improvements not above mentioned and not now contemplated, and that no other storm sewers and improvements other than street paving will be necessary. Plaintiffs allege that the sum of approximately $55,000.00 will be all of the money expended from the proceeds of said bond issue for the construction of such sewers, ditches, and improvements, other than street paving.”

The paragraph referred to in the language copied contains a description of the streets upon which the improvements were being made. The allegations as to the improvements in question separate and segregate them from the allegations seeking to hold the appellee liable for work not designated and which is merely anticipatory.

Appellants have based their suit for recovery for profits on the $250,000 bond issue, and contend that work on designated streets was to be done, such designations to be made at once and the whole of the amount of the bonds expended thereon. It is insisted that, when the bond issue was authorized by a vote of the people, such authorization was equivalent to a mandate to the municipal governing body to spend the money as fast as possible, no matter what inflation or depression existed, no matter what the market value of the bonds might be, the city council had been ordered to get what money they could and then spend it as fast as possible. The mandatory order to sell bonds and spend it at once on street paving carried with it an imperative order to levy assessments on owners of city lots in sums which in the end would result in an expenditure- of $500,000. The suit of appellants contemplates such assessments and such expenditures, and they are seeking to recover the modest sum of 5 per cent, on that vast outlay of money.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Untitled Texas Attorney General Opinion
Texas Attorney General Reports, 1959
City of Del Rio v. Ulen Contracting Corporation
94 F.2d 701 (Fifth Circuit, 1938)
Chattanooga Boiler & Tank Co. v. City of Collinsville
111 S.W.2d 1170 (Court of Appeals of Texas, 1937)

Cite This Page — Counsel Stack

Bluebook (online)
54 S.W.2d 220, Counsel Stack Legal Research, https://law.counselstack.com/opinion/fooshee-hungerford-v-city-of-victoria-texapp-1932.