Florida East Coast Railway Co. v. United States
Opinion
In this appeal, which has as its focus the damage done a railroad by the washout of its line near a flood control project, the controversy revolves around the liability of the United States, a flood control district, and a general contractor. The central issues are the immunity of the United States, the jurisdiction of the court on a pendent basis over the contractor, and the alleged negligence of the flood control district.
I. Factual Background.
Pursuant to authorization under the Flood Control Act of 1948,1 the United States Army Corps of Engineers (Corps), an instrumentality of the federal government, undertook to implement the con-gressionally approved Central and Southern Florida Flood Control Project. The purpose of the project was to control high water conditions in the area in question during the rainy season, and to impound additional water in Lake Okeechobee for use during the dry season.2
Levees 64 and 65 of the flood control project parallel one of the branch lines, known as the K-line, of the Florida East Coast Railway. That portion of the Kline between mileposts 29 and 40.08 runs north to south, along the eastern side of Levees 64 and 65. The interceptor canal adjacent to Levee 64 lies to the north of and flows into the canal adjacent to [1188] Levee 65. Between them is Culvert No. 1.3
At the southern terminus of Levee 65 —where its interceptor canal empties into the St. Lucie Canal — is Structure 153 which, the district court found, regulates the water level and the rate of flow in the interceptor canals for the two levees. By controlling the flow and level of the water in the interceptor canals, Structure 153 in turn affects the velocity of water draining from the surrounding area.
The land both east and west of the stretch of the K-line in question is extremely flat and swampy. Prior to construction of the flood control project, surface waters in the area flowed in a southwesterly direction, under three bridges and through numerous equalizer culverts underlying the railway’s roadbed. Between the time it was constructed in 1925 and October 1969, when the first washout in this case occurred, the K-line never suffered a washout or serious erosion, even during hurricanes and other periods of heavy rainfall. Building the levees and the structures appurtenant to them, the trial judge found, destroyed the natural drainage in the area.
The Central and Southern Florida Flood Control District (Flood Control District) acquired the land and the right-of-way upon which the project was to be constructed. It assured the Corps that it would hold the United States free from damages resulting from the building and operation of the project, and would maintain and operate the flood control system after its completion.
Although the Corps had primary responsibility for the design of the project, the trial judge found that the Flood Control District worked closely with the Corps in the planning stages. The Flood Control District, according to'the trial judge, “reviewed, in detail, and commented on the General Design Memorandum . . ., the Detailed Design Memorandum . . . and the Project Plans and Specifications. It was responsible for alignment of the project. . The Flood Control District also provided advice and assistance to the Corps with regard to the actual construction of the project.” In addition, the Flood Control District furnished 15 per cent of the funds for completing the undertaking.
On April 3, 1968, the Corps awarded the principal construction contract to Troup Brothers, Inc. The trial court found that Troup, as the prime contractor, worked under the supervision of the Corps and was responsible for seeing that the project was completed in accordance with the plans and specifications drawn up by the Corps. Troup in turn hired Cross Contracting Company to perform all the excavation work and to install the flood control project structures.
During an extraordinarily heavy rainfall on October 29, 1969 a washout occurred at milepost 37.76 on the K-line. The washout resulted from the following: leaving Structure 153 open, removing “earth plugs”
Footnotes
519 F.2d 1184 (Florida East Coast Railway Co. v. United States) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.