FCCC v. King County

150 P.3d 1147
CourtCourt of Appeals of Washington
DecidedJanuary 22, 2007
Docket56594-0-I
StatusPublished

This text of 150 P.3d 1147 (FCCC v. King County) is published on Counsel Stack Legal Research, covering Court of Appeals of Washington primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
FCCC v. King County, 150 P.3d 1147 (Wash. Ct. App. 2007).

Opinion

150 P.3d 1147 (2007)

FRANK COLUCCIO CONSTRUCTION COMPANY, INC., Respondent,
v.
KING COUNTY, Appellant.

No. 56594-0-I.

Court of Appeals of Washington, Division 1.

January 22, 2007.

*1150 Stevan David Phillips, Christina L. Haring, Margarita V. Latsinova, Stoel Rives LLP, Oma Lynn La Mothe, King Co. Courthouse, Seattle, for Appellant.

Bryan Patrick Coluccio, Cable Langenbach Kinerk & Bauer LLP, Seattle, WA, for Respondent.

DWYER, J.

¶ 1 King County hired Frank Coluccio Construction Co., Inc. (FCCC) as general contractor for a public works project involving construction of a small utility tunnel under the Duwamish Waterway. FCCC hired Donald B. Murphy Contractors, Inc. (DBM) as a subcontractor. DBM was responsible for constructing an access shaft at the eastern end of the tunnel. Problems arose during construction, including a "blow in" of the access shaft. FCCC and DBM incurred substantial monetary losses resulting from repairs and delays.

¶ 2 Under the project contract, King County was obligated to purchase an insurance policy to "insure against physical loss or damage by perils included under an `All Risk' Builder's Risk policy form." However, King County failed to obtain such insurance. When FCCC and DBM submitted builder's risk claims to King County in accordance with contractual requirements, King County denied the claims. Ultimately, FCCC sued King County, alleging, among other claims, that King County was liable for breaching the project contract by failing to obtain the builder's risk insurance. After a bench trial, FCCC prevailed on its claims and on DBM's pass-through claims. King County appeals from the judgment entered in FCCC's favor. We affirm.

I.

¶ 3 King County undertook a public works project known as the Alki Transfer/CSO Project West Duwamish Waterway Crossing, Contract W/F 6-95 (the Project). King County hired FCCC as general contractor for the Project. FCCC hired DBM as a subcontractor. The Project involved the construction of a small tunnel under the Duwamish Waterway for utility services. FCCC was responsible for constructing the tunnel. DBM was responsible for constructing an access shaft at the eastern end of the tunnel (East Access Shaft).

¶ 4 King County drafted the General Conditions portion of the Project contract. The General Conditions of the Project contract provide:

The County will purchase and maintain property damage insurance upon the entire work, including materials and supplies, at the site, storage offsite or while in transit, to the insurable value thereof. The insurance shall include the interests of the County, the Contractor, subcontractors and sub-subcontractors of all tiers in the work and shall insure against physical loss or damage by perils included under an "All Risk" Builder's Risk policy form.[1]

Under the General Conditions, King County assumed the right and responsibility of adjusting any claim under the builder's risk policy, and to act as trustee for the insureds with regard to any payments made on such claims.

¶ 5 King County did not purchase a builder's risk insurance policy for the Project as *1151 mandated by the General Conditions of the Project contract. During the Project, King County had a general property damage insurance policy through Arkwright Mutual Insurance Company[2] (the Arkwright Policy).

¶ 6 DBM designed and constructed the East Access Shaft. The East Access Shaft wall was designed as a circular series of 34 interlocking columns, known as "piles," consisting of concrete poured into holes drilled in the ground. Following construction of the shaft wall, the shaft would be excavated and dewatered, and a thick concrete slab placed at the bottom of the structure, approximately 60 feet below the ground surface. The first 33 piles were constructed without incident.

¶ 7 Although DBM employees followed the same construction methods and procedures used on the previously constructed piles, problems arose during the installation of the final pile, Pile 8S. While the concrete was being pumped into the hole drilled for Pile 8S, the pipe used to convey concrete into the hole (the "tremie pipe") became stuck while the concrete level was 70 feet below surface level. DBM employees responded by taking remedial measures, continuing to pump concrete into the hole and attempting to remove the tremie pipe with a large crane. After the concrete pour was completed, the stuck tremie pipe was cut off at surface level and left embedded in the pile. Only 39.5 cubic yards of concrete was used to construct Pile 8S, approximately 12 cubic yards less than was used on comparable piles.

¶ 8 On January 9, 1998, as the shaft was being dewatered, a "blow-in" occurred. The shaft filled with water, soil, and debris. After the blow-in, a diver observed that Pile 8S and two adjoining piles were damaged, and that the blow-in occurred in the area of this damage. Again, DBM employees were forced to take remedial action. After three failed attempts, DBM employees were eventually able to able to repair the shaft by freezing the ground around the shaft with liquid nitrogen. Thereafter, the shaft was successfully excavated and dewatered. The repairs delayed construction of the tunnel by two months. FCCC incurred expenses during the delay related to costs of equipment, site maintenance, and labor.

¶ 9 Following the blow-in, FCCC, King County, and Arkwright corresponded with each other about the builder's risk claims related to the East Access Shaft. King County denied the builder's risk claims on June 30, 1999. FCCC and King County also corresponded about the fact that the Project would "close out" while the builder's risk claims were still pending. The General Conditions of the Project contract provide:

By accepting final payment, the Contractor shall be deemed thereby to have released the County from all claims of and all liability to the Contractor . . . other than timely written claims identified in detail and stated amounts that were submitted prior to the final payment and in strict compliance with the requirements of this Contract.

King County issued a warrant to FCCC, dated August 23, 1999, for final payment on the contract.

¶ 10 In August 1999, DBM filed an action against King County for breach of contract, breach of the implied covenant of good faith and fair dealing, negligent misrepresentation, promissory estoppel and implied contractual indemnity. King County moved for summary dismissal of DBM's claims. The trial court granted the motion. This court affirmed the dismissal, holding that DBM was not a third-party beneficiary to the contract and, thus, its claim for breach of the duties of good faith and fair dealing was properly dismissed because King County owed no contractual duty to DBM. Donald B. Murphy Contractors, Inc. v. King County, 112 Wash. App. 192, 194-98, 49 P.3d 912 (2002).

¶ 11 DBM then brought an action against FCCC for wrongful withholding of sums due under the subcontract. DBM and FCCC settled their dispute in December 2001, and entered into a Settlement and Joint Prosecution Agreement. This agreement provided that FCCC would sponsor and pass through *1152 DBM's builder's risk claim against King County.

¶ 12 FCCC subsequently initiated the present action, asserting claims against King County for breach of contract, promissory estoppel, implied indemnification, breach of the covenant of good faith and fair dealing, breach of fiduciary duties, tortious interference with FCCC's economic interests, and violation of the Washington Insurance Code.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Allstate Insurance Company v. Dwight H. Smith, M.D.
929 F.2d 447 (Ninth Circuit, 1991)
Boeing Company v. Sierracin Corporation
738 P.2d 665 (Washington Supreme Court, 2000)
Diamaco, Inc. v. Aetna Cas. & Sur. Co.
983 P.2d 707 (Court of Appeals of Washington, 1999)
Hillhaven Properties Ltd. v. Sellen Construction Co.
948 P.2d 796 (Washington Supreme Court, 1997)
Kohn v. Georgia-Pacific Corp.
850 P.2d 517 (Court of Appeals of Washington, 1993)
Absher Const. Co. v. KENT SCHOOL DIST.
917 P.2d 1086 (Court of Appeals of Washington, 1996)
Findlay v. United Pacific Ins. Co.
917 P.2d 116 (Washington Supreme Court, 1996)
Brewer v. Copeland
542 P.2d 445 (Washington Supreme Court, 1975)
Cowiche Canyon Conservancy v. Bosley
828 P.2d 549 (Washington Supreme Court, 1992)
DeHeer v. Seattle Post-Intelligencer
372 P.2d 193 (Washington Supreme Court, 1962)
McDonald v. State Farm Fire & Casualty Co.
837 P.2d 1000 (Washington Supreme Court, 1992)
In Re the Marriage of Greene
986 P.2d 144 (Court of Appeals of Washington, 1999)
Boggs v. Aetna Casualty and Surety Co.
252 S.E.2d 565 (Supreme Court of South Carolina, 1979)
Steamboat Development Corp. v. Bacjac Industries, Inc.
701 P.2d 127 (Colorado Court of Appeals, 1985)

Cite This Page — Counsel Stack

Bluebook (online)
150 P.3d 1147, Counsel Stack Legal Research, https://law.counselstack.com/opinion/fccc-v-king-county-washctapp-2007.