Edith Davis Elmore v. Dixie Pipeline Company

245 So. 3d 500
CourtCourt of Appeals of Mississippi
DecidedOctober 3, 2017
DocketNO. 2015–CA–01499–COA
StatusPublished
Cited by4 cases

This text of 245 So. 3d 500 (Edith Davis Elmore v. Dixie Pipeline Company) is published on Counsel Stack Legal Research, covering Court of Appeals of Mississippi primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Edith Davis Elmore v. Dixie Pipeline Company, 245 So. 3d 500 (Mich. Ct. App. 2017).

Opinion

GRIFFIS, P.J., FOR THE COURT:

¶ 1. Edith Davis Elmore appeals the exclusion of her expert witness and the entry of summary judgment on all asserted claims. Upon review, we find no error and affirm.

FACTS AND PROCEDURAL HISTORY

¶ 2. Dixie Pipeline Company ("Dixie") operates a buried pipeline through which liquid propane is transported. The pipeline, which was constructed in 1961, extends approximately 1,100 miles from Texas to North Carolina, and includes various sizes of pipe. The particular segment at issue consists of a 395-mile stretch of 12-inch-diameter pipe, which runs from the west side of the Mississippi River near Erwinville, Louisiana, eastward to Opelika, Alabama, and passes through Clarke County, Mississippi. Lone Star Steel Company manufactured the pipe using a low-frequency electric resistance welding (ERW) process.

¶ 3. In 1988 and 1989, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued an alert notice to all hazardous-liquid-propane operators who had in place ERW pipe manufactured before 1970. The notices advised of operational failures of pipeline constructed with ERW pipe manufactured prior to 1970. The notices included certain recommendations by the PHMSA. Neither notice required pipeline operators to cease operating pre-1970 manufactured ERW pipe, or remove and replace the pipe.

¶ 4. On November 1, 2007, the pipeline ruptured near Carmichael, Mississippi. As a result of the rupture, liquid propane was released, some of which vaporized and exploded. At the time of the explosion, Elmore owned a house located approximately 1.1 miles from the accident site. Elmore claims her house suffered structural damage as a result of the shockwaves from the explosion.

¶ 5. The National Transportation Safety Board (NTSB) investigated the pipeline rupture. The NTSB noted that the pipeline segment at issue was hydrostatically pressure tested in 1961, and again in 1984. 1 Additionally, in-line inspections were subsequently performed in 1998, 2005, and 2006. Based on the inspections, the NTSB determined that no defects or anomalies in the subject pipe joint could be correlated with the 2007 rupture. The NTSB ultimately concluded that "the probable cause" of the subject pipeline rupture "was the failure of a weld that caused the pipe to fracture along the longitudinal seam weld, a portion of the upstream girth weld, and portions of the adjacent pipe joints." Importantly, the NTSB concluded that the following were not factors in the rupture: corrosion, excavation damage, the controller's actions, or the operating conditions of the pipeline.

¶ 6. In her amended complaint, Elmore asserted claims of negligence, strict liability, and punitive damages against Dixie, as the operator of the pipeline. Following the agreed-upon discovery deadline, Elmore filed a motion to direct Dixie to produce the transcript of the corporate deposition taken in a case that involved the same pipeline rupture, but was litigated in Texas. 2 The circuit court denied the untimely motion.

¶ 7. Dixie subsequently filed motions for summary judgment on all claims asserted by Elmore. The circuit court granted summary judgment in favor of Dixie on the strict-liability and punitive-damages claims, but denied the motion as to Elmore's negligence claim.

¶ 8. Dixie further filed a motion to exclude the opinions and testimony of Elmore's expert witness, Dr. Kendall Clarke. Following a hearing, the circuit court granted the motion, in part, and excluded Dr. Clarke from offering opinion testimony regarding the standard of care for pipeline operators, or any violation of that standard of care by Dixie.

¶ 9. Prior to trial, Dixie filed a renewed motion for summary judgment on Elmore's negligence claim. On reconsideration, and in light of the partial exclusion of Dr. Clarke's testimony, the circuit court granted summary judgment as to Elmore's negligence claim. Elmore now appeals and argues the circuit court erroneously: (1) denied her motion to produce the transcript of the corporate deposition taken in the Texas litigation, (2) excluded Dr. Clarke, (3) granted summary judgment on her strict-liability claim, (4) granted summary judgment as to her negligence claim, and (5) granted summary judgment on her punitive-damages claim.

ANALYSIS

I. The Denial of the Production of the Corporate-Deposition Transcript

¶ 10. Elmore first argues the circuit court erroneously denied her "motion to direct [Dixie] to produce the corporate deposition taken in the Texas litigation." "[Circuit] courts are afforded broad discretion in discovery matters, and this Court will not overturn a [circuit] court's decision unless there is an abuse of discretion." Ashmore v. Miss. Authority on Educ. Television , 148 So.3d 977 , 981 (¶ 9) (Miss. 2014).

¶ 11. On February 27, 2014, an agreed order extending case-scheduling deadlines was entered by the circuit court, which extended the discovery-completion date to March 28, 2014. This was the second extension entered by the circuit court to allow the parties to complete discovery. On April 15, 2014, almost three weeks after the expiration of the agreed-upon discovery deadline, Elmore filed the subject motion and sought the production of "a true and correct copy of the deposition [transcript], with all exhibits, given by representatives of Dixie in the referenced Texas litigation."

¶ 12. Prior to the agreed-upon discovery deadline, Elmore propounded written discovery to Dixie and deposed two corporate representatives of Dixie. At no time before the close of discovery did Elmore request Dixie to produce prior corporate depositions taken in Texas. In fact, Elmore acknowledged that a formal request was not made until the filing of the motion at issue, which was after the expiration of the discovery deadline.

¶ 13. The circuit court "has the authority and indeed the duty to maintain control of the docket and ensure the efficient disposal of court business." Douglas v. Burley , 134 So.3d 692 , 699 (¶ 20) (Miss. 2012) (emphasis omitted) (citing Venton v. Beckham , 845 So.2d 676 , 684 (¶ 25) (Miss. 2003) ). We find no abuse of discretion in the circuit court's denial of Elmore's untimely discovery motion.

II. The Exclusion of Dr. Clarke's Testimony

¶ 14. Elmore next argues the circuit court erroneously excluded the opinions and testimony of her expert, Dr. Kendall Clarke. "The standard of review for the admission or exclusion of expert testimony is abuse of discretion." Patterson v. Tibbs , 60 So.3d 742 , 748 (¶ 19) (Miss. 2011).

"This Court should find error in the [circuit] court's decision to exclude expert testimony only if the decision was arbitrary or clearly erroneous."

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Agustin Mendez Lopez v. Bellamare Development, LLC
Court of Appeals of Mississippi, 2019
Oshaun Johnson v. T & T Farms, Inc.
Court of Appeals of Mississippi, 2019
In re Dicamba Herbicides Litig.
359 F. Supp. 3d 711 (E.D. Missouri, 2019)

Cite This Page — Counsel Stack

Bluebook (online)
245 So. 3d 500, Counsel Stack Legal Research, https://law.counselstack.com/opinion/edith-davis-elmore-v-dixie-pipeline-company-missctapp-2017.