Duff Construction Co. v. Alford

149 S.W. 943, 149 Ky. 594, 1912 Ky. LEXIS 679
CourtCourt of Appeals of Kentucky
DecidedOctober 2, 1912
StatusPublished
Cited by3 cases

This text of 149 S.W. 943 (Duff Construction Co. v. Alford) is published on Counsel Stack Legal Research, covering Court of Appeals of Kentucky primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Duff Construction Co. v. Alford, 149 S.W. 943, 149 Ky. 594, 1912 Ky. LEXIS 679 (Ky. Ct. App. 1912).

Opinion

[595]*595Opinion op the Court by

Judge Winn

Reversing.

Thirty-fourth street, running north and south, and Grayson street (sometimes called Cedar street), running east and west, intersect each other at right angles in Louisville, Kentucky. In September, 1910, the appellant, the James Duff Construction Company, was engaged in building a city sewer along Cedar street in the vicinity of this intersection. At this time Thirty-fourth street was unimproved, and the only sidewalk running north and south along its east side was a cinder path. Cutting this cinder path was a ditch or drain. Over the ditch or drain were laid some boards connecting the abutting ends of this cinder path. The appellee, James L. Alford, while walking north on this cinder path, between seven and eight o’clock of the evening of September 17, stepped or fell from these boards into the ditch and sustained injuries, for which he brought his action against the construction company. Plaintiff alleged that through the negligence of the company in maintaining an open and unprotected ditch he was caused to sustain his injuries. He alleged that he had been compelled to employ a physician; to purchase medicine ; that he had lost -time from his labor; that he was injured in his head, arms, legs, back and shoulder; that he suffered a severe nervous shock, and that his power to earn money had been permanently impaired. He prayed judgment for $2,000. The construction company traversed the petition and plead contributory negligence on the part of Alford. Issue was joined upon the allegation of contributory negligence and the case proceeded to a trial. At the conclusion of all the testimony plaintiff, Alford, asked leave to, and was permitted to file an amended petition. In the amended petition he alleged that the injury occurred at the southwest corner of the intersection of the two streets above named. The allegations of the amended petition were traversed of record. The jury awarded plaintiff a verdict of $1,0.00, and from the judgment upon that verdict the construction company appeals.

No complaint is made of the instructions given by the trial court. Appellant complains, first, that the court should have instructed the jury to find for it; second, that the court erred in permittting the filing of the amended petition; third, that incompetent testi[596]*596mony was admitted against it; fourth, that the verdict of the jury was so excessive as to indicate that it was the result of passion and prejudice. The points of complaint necessitate a consideration of the evidence.

First — Should the peremptory instruction have been given? The evidence as to- whether the construction company dug the ditch or drain is sharply conflicting. Alford testified that the ditch looked like a new ditch,, and that there were shovel prints in it; that there was a pipe laid along in the ditch, and that it was used for furnishing water to, or taking waste water away from, a sewer machine of the construction company located adjacent to the place of the injury. Hugo Meyer testified that he was present at the intersection of these streets and that he saw Mr. Green, in charge of the work there, call six or eight men out of the sewer and put them to work digging a ditch across the cinder path. He says that there were no boards there at the time they started to dig the ditch, and that there was no ditch there at the time. Charles Glenn testified about the ditch running across Thirty-fourth street; that a pipe was laid in the ditch, and that the pipe connected with á corner water box; that he never saw any ditch until the sewer work commencéd, though he lived there before the sewer work started; that from his inspection of the' ditch across the ends of the sidewalk it was a new ditch about a foot and a half or two feet deep;' that there were two planks across- the ditch, running on.the length of Thirty-fourth street, and- one board across that.' William G. Bache testified that a line of pipe-crossed the cinder path; that there were boards across the ditch, which didn’t quite cover the cinder path, and that the pipe came out from under either end of these boards; that the pipe was connected with the machino,• that the ditch-'was newly made for the purpose of this-water pipe and showed the marks of the shovel or spade. George Kohler testified that there was no ditch there until the sewer work started. Upon the other hand, Norman Arthur testified for the company that the ditch-was already there when the construction company came to work. He testified to the existence of the pipe line across the street. Frank McDonald, for the defense, testified that the ditch was there with plank over it at the time the sewer company began its work — that it looked as though, it had been there for years; that the [597]*597company did not do any digging in this ditch, hut that they took out trash and leaves so that the water could run. Henry Neimyer had lived for years on the southeast corner of the street intersection. He testified that there had always been a little drain there, and that there had been a board covering across the ditch in the cinder path. He added, however, that the construction company made the ditch a little deeper and cleaned it out a! little and put extra plank on it; that they dug it out about a foot. Alvin Bitter testified that the boards had been there as long as the walk had been there, and that the drain or ditch had been there before the construction company came. Henry Magel, a cripple, testified directly to the prior existence of a drain from four to six inches in depth, with boards across it, before the construction company came there. He fortifies his evidence by stating that he was a cripple and that using a tricycle as a boy, he had to be lifted off while some one would set his tricycle across the boards for him. The foregoing is the substance of the testimony as to whether the construction company had dug the ditch. Cer-. tainly, there appears to be enough of testimony to take the case to the jury upon this question; for, even if we concede that there had been a depression or drain there, there is the admitted evidence by the • construction company’s men that they cleaned it out and changed the condition of the boards, and the evidence- óf Neimyer, the long-time dweller on the corner, that the construction company dug out the ditch about a foot-.-' It was not error,- therefore, to refuse the peremptory, instruction.

Second-^The original petition charged that the ditch was on Thirty-fourth street between Grayson and Walnut streets, while the proof showed .that the ditch was at the southeast corner of the intersection of Gray-son and Thirty-fourth streets. At. the conclusion of all the testimony, the plaintiff filed his amendment, .alleging not, as in the original petition, that the ditch was on Thirty-fourth. between Grayson and Walnut streets, but that it was at -the sbuthwest corner of the intersection. As a matter of fact, the ditch was -at the ■ southeast corner. To the conditions existing at-the southeast corner, all the testimony, both of the plaintiff and defendant, .had addressed itself, and the defendant could ■not be misled by this error of the plaintiff in designating the point as the so'uthwést instead of the southeast [598]*598corner of the intersection. Appellant makes a good deal of this point because one of its witnesses had testified as to some digging over on the southwest corner, arguing that the jury might have thought that the ditch over there was the one into which Alford fell.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

White Construction Company v. Brooks
1 S.W.2d 1076 (Court of Appeals of Kentucky (pre-1976), 1928)
Kentucky Public Service Co. v. Topmiller
263 S.W. 706 (Court of Appeals of Kentucky, 1924)
Castleman-Blakemore Co. v. Brucker
180 S.W. 360 (Court of Appeals of Kentucky, 1915)

Cite This Page — Counsel Stack

Bluebook (online)
149 S.W. 943, 149 Ky. 594, 1912 Ky. LEXIS 679, Counsel Stack Legal Research, https://law.counselstack.com/opinion/duff-construction-co-v-alford-kyctapp-1912.