Decatur & MacOn County Hospital Ass'n v. Erie City Iron Works

220 N.E.2d 590, 75 Ill. App. 2d 144, 1966 Ill. App. LEXIS 1026
CourtAppellate Court of Illinois
DecidedSeptember 26, 1966
DocketGen. 10,679
StatusPublished
Cited by8 cases

This text of 220 N.E.2d 590 (Decatur & MacOn County Hospital Ass'n v. Erie City Iron Works) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Decatur & MacOn County Hospital Ass'n v. Erie City Iron Works, 220 N.E.2d 590, 75 Ill. App. 2d 144, 1966 Ill. App. LEXIS 1026 (Ill. Ct. App. 1966).

Opinion

TRAPP, P. J.

Defendant Erie City Iron Works, hereinafter designated Erie, appeals from a judgment in the sum of $30,818.50 entered in favor of the plaintiff upon the verdict of a jury against Erie and T. A. Brinkoetter & Sons, Inc. Other disposition has been made as to the case against the latter and we consider only the appeal of Erie.

Plaintiff’s action was for property damage in the approximate amount of the judgment incurred as the result of the explosion of a gas-fired boiler manufactured by Erie and installed by Brinkoetter. At the time of the explosion installation had just been completed and was at the stage of the initial start-up and adjustment of the boiler. Title to it had not yet passed to the plaintiff.

The defendant’s theory is that defendant was not guilty of the negligence that was the proximate cause of plaintiff’s damages; that the court should have directed a verdict in favor of this defendant, or granted defendant’s post-trial motion for judgment notwithstanding the verdict of the jury or, in the alternative, should have granted defendant a new trial of the issues, because of error committed by the court in submitting, to the jury, both Count I and Count II of plaintiff’s complaint, which respectively were predicated upon a res ipsa loquitur theory and specific negligence theory; that there was error by the court in denying defendant’s motion for mistrial because of prejudicial conduct of counsel; that conduct of a juror was prejudicial to defendant; and that there was error by the court in giving certain instructions to the jury; and other errors hereinafter discussed.

Plaintiff purchased the boiler as a “package” boiler fabricated by Erie at its plant and shipped assembled for installation as a complete unit with automatic firing controls built on.

The fire control unit and the main motorized valve were not manufactured by Erie but were purchased by it and affixed to the fabricated boiler. The Brinkoetter contract called for it to install the boiler and connect it to the line bringing gas into the building.

In making the installation, Brinkoetter did not install what has been called a “dirt leg,” i. e., a trap consisting of a length of pipe extending beyond the point where a vertical gas line is turned so that it travels horizontally. Its function is to catch condensed moisture and debris in the gas line. Plaintiff had retained consulting engineers to design and supervise installation of the boiler. The schematic drawing provided by the engineer did not show a “dirt leg.” The latter testified that the contractor should install a “dirt leg” whether drawn in the plans or not. Officers of Brinkoetter say that it puts in dirt legs when the plans call for them, otherwise it does not.

Neither the fabricated boiler nor the connecting line, as installed, included a “strainer,” which is described as a distinctive appearing section of pipe containing a screen, the function of which is to catch debris which might be carried through the line by the flow of gas. When used, it is installed in the line ahead of the valves and controls. A brochure of the valve manufacturer recommended that a strainer be placed ahead of the main valve. Such a strainer was not included in the unit fabricated by Erie. The consulting engineer’s schematic drawing did not include a strainer. He testified that he would have included it if he had known that a strainer was recommended. An officer of Brinkoetter testified that he had never heard of a strainer in a gas line. In behalf of the latter, its foreman and employes testified that as the gas line was being installed, steps were taken to knock loose the scale and clean the connecting pipe. It appears that the installation was nearly completed when the contractor was advised by the gas company foreman that it would be necessary to install a regulator, i. e., a device which lowered the pressure from the 35-pound pressure in the main to some 10 pounds as specified by the boiler. A used regulator was available at the hospital and was installed. At first it did not function, but after some adjustment was observed to be reducing the pressure. It was not tested after the explosion. In installing the regulator at this time, it was necessary to cut the gas line with a torch and weld on a section of pipe. It does not appear what, if anything, was done to inspect for and remove debris in the pipe following this operation. There is some conflict in the evidence as to whether or not welding slag would enter the pipe by reason of this work.

Under the terms of its contract with Erie, plaintiff elected to have the services of a start-up engineer. Upon notification of the completion of the installation such engineer, one Enders, was sent by Erie. The explosion in issue occurred at 11:40 a. m. on Thursday, September 25,1958. In summary, it appears that Enders had arrived on the preceding Tuesday, that the boiler was started up and fired for some 20 hours and then shut down, and that on the morning of the 25th it had been started up and fired for some 2 hours preceding the explosion. Enders died following the explosion, apparently as the result of injuries sustained.

With regard to the things done during this period, one Binns, a member of the hospital maintenance staff, testified that Enders started the boiler operation, handled the controls and made adjustments, and that immediately prior to the explosion Enders was making an adjustment of the water level in the boiler. Charles Fearn, foreman of the gas distribution crew of the utility company which was working on the exterior gas line, testified that he had been in the boiler room during the morning and Enders had told him that the boiler was on low fire or “no load” firing, and that he was going to test the boiler on high fire, asking Fearn to time the meter outside so that there could be a measurement of the cubic feet of gas entering the boiler on high fire. No specific arrangement was made as to when this would be done.

Following the explosion, a State boiler inspector, and representatives of the interested parties, together with engineers and experts retained by them, assembled at the scene to examine the boiler which had been kept undisturbed. Several of them testified that they had noticed the absence of the dirt leg and the screen in the gas line connected to the boiler. The main valve was examined as to its external indicator and the testimony varies from the statement that it was apparently closed, through slightly open to one-third open. The boiler inspector testified that he assumed that it was open. It does not appear that any organized procedure was followed so that each expert present observed all of the matters testified to.

The main valve was then disassembled. Most witnesses testified to observing some scale and several pieces of welding slag on both the upstream and downstream sides of the valve.

There is testimony that upon examination of the several parts of the valve, a resilient neoprene seal was observed to be indented and that the stainless steel seat of the valve was scored to a depth of %6th of an inch or so, the width of the indentation being that of a blade of a table knife. There is other testimony that the seat bore only normal scratches. It does not appear that tests were made to determine whether the indentations on the neoprene seal coincided with the scoring of the valve seat.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Guzman v. Target Corporation
N.D. Illinois, 2018
Aguirre v. Turner Construction Co.
582 F.3d 808 (Seventh Circuit, 2009)
Cox v. Yellow Cab Co.
306 N.E.2d 738 (Appellate Court of Illinois, 1973)
Deardorff v. Decatur & Macon County Hospital Ass'n
250 N.E.2d 313 (Appellate Court of Illinois, 1969)
Deardorff v. DECATUR AND MACON C. HOSP. ASS'N
250 N.E.2d 313 (Appellate Court of Illinois, 1969)
Freer v. Rowden
247 N.E.2d 635 (Appellate Court of Illinois, 1969)

Cite This Page — Counsel Stack

Bluebook (online)
220 N.E.2d 590, 75 Ill. App. 2d 144, 1966 Ill. App. LEXIS 1026, Counsel Stack Legal Research, https://law.counselstack.com/opinion/decatur-macon-county-hospital-assn-v-erie-city-iron-works-illappct-1966.