Crumady v. The Joachim Hendrik Fisser

142 F. Supp. 389, 1956 U.S. Dist. LEXIS 3122
CourtDistrict Court, D. New Jersey
DecidedJune 27, 1956
DocketCiv. A. 1-54
StatusPublished
Cited by12 cases

This text of 142 F. Supp. 389 (Crumady v. The Joachim Hendrik Fisser) is published on Counsel Stack Legal Research, covering District Court, D. New Jersey primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Crumady v. The Joachim Hendrik Fisser, 142 F. Supp. 389, 1956 U.S. Dist. LEXIS 3122 (D.N.J. 1956).

Opinion

WORTENDYKE, District Judge.

This admiralty suit was instituted by libel in rem for damages, civil and maritime, for bodily injuries and their consequences, resulting from the fall of a cargo boom serving hatch No. 1 on the motor vessel Joachim Hendrik Fisser, of German registry, while lying in navigable waters of the United States, within the jurisdiction of this Court, at a pier or bulkhead at Port Newark, New Jersey, on January 2, 1954.

The vessel impleaded as a respondent libellant's employer, Nacirema Operating Co., Inc. (herein called Nacirema), the stevedore contractor which was discharging the vessel’s cargo at the time of the occurrence complained of.

The injuries were inflicted during the course of discharge of a cargo of lumber and timbers from the forward (No. 1) hatch of the vessel by libellant’s fellow-employees. The discharging operations had commenced about an hour before the offending occurrence, during which time certain drafts of lumber had been discharged by means of the so-called “up- and-down” boom and Burton boom from the hatch of the vessel to the pier. The booms and tackle had been initially rigged by the ship’s crew but before the operation in the course of which libellant was injured the stevedores had altered the position of the head of the up-and-down boom and the places of fastening of its guy and preventer. The discharging instrumentalities, including the winches, were being handled by libellant and his fellow-employees.

[391]*391When the accident occurred the stevedores were in the course of discharging from the hatch two timbers, lying fore and aft of the hatch, estimated in dimensions at from 8" x 8" to 12" x 12" in girth and from 30 to 37 feet in length. One of these two timbers lay upon the cargo within the open square of the hatch, while the other timber lay beneath and entirely or partly outboard of the outboard-curving lower edge of the starboard hatch coaming, the top surface of the latter timber being close to the edge of the coaming and beneath the deck. In an effort to bring the two timbers together and into the open area of the hatch square, libellant and his fellow-employees had placed a double-eyed wire rope sling, provided with a sliding hook movable between the eyes thereof, around the two timbers at a location two or three feet from their after ends. The two eyes of the sling were then placed upon the cargo hook of the up-and-down boom runner and a signal given by the stevedore gangwayman to the winchman to “take up the slack”. The winchman complied with the signal, and during this operation libellant stood clear upon other timbers forming a part of the cargo, within the open square of the hatch. There was some testimony that when the slack was taken up by the winchman, the two timbers slid toward each other in the sling, the timber which had been under the lower edge of the hatch coaming moving or commencing to move toward the timber which lay within the open hatch square. After the slack had been taken up by the winchman, the same signaller called for the “taking of a strain” upon the cargo runner. The winchman again responded, the two-part topping-lift broke and the head of the up-and-down boom, with its attached cargo and topping-lift blocks, fell to the top of the cargo within the hatch square.

The topping-lift had been rigged in a double purchase and had been supporting the head of the boom. The wire rope constituting the topping-lift extended from a shackle on the topping-lift block at the cross-tree of the mast, through a block at the boom head, back through the mast block, down the mast, through a block welded to the mast table, and thence around a drum of the winch. •When the boom fell, libellant was knocked down, either by the boom itself or its appurtenant tackle, and thus sustained numerous serious and permanently disabling orthopedic and neurological injuries.

Alleging that he was impliedly invited by the vessel and her owner to participate in her unloading, libellant charges that his injuries proximately resulted from the negligence of such owner, its agents and servants, and from the unseaworthiness of the vessel. More particularly, libellant asserts that the topping-lift which parted and permitted the boom to fall was, to the knowledge of the vessel’s owner, “worn, frayed and damaged”, and that “the equipment attached to * * * the boom * * * was insufficient, defective, inadequate and unsuited to handle the transfer of said cargo.”

Libellant’s employer is impleaded as a respondent upon the vessel’s contention that the sole cause of the breaking of the topping-lift, and the consequent fall of the boom, was the active negligence or improper conduct of the libellant’s fellow employees in the handling of the cargo and unloading gear. By reason thereof the vessel seeks indemnification under the 56th Admiralty Rule.

At the commencement of the trial, the following facts were stipulated: (1) the topping-lift cable (which admittedly parted and permitted the boom to fall) had been rigged and installed following the launching of the vessel in June 1952, and had not been replaced prior to the accident here involved; (2) the port or up-and-down boom winch, which was being operated at the time the topping-lift cable parted, had also been installed following the launching of the vessel, and had a rated three-ton capacity, with 18 German horse-power; (3) this winch was equipped with a device which automatically interrupted its operation upon the application of a burden exceed[392]*392ing the capacity of the winch; (4) the vessel and her loading gear had been inspected by a ship’s surveyor on June 5, 1952, and there had been subsequent annual inspections of such gear.

It is elementary that the vessel owed libellant longshoreman the nondelegable obligation of seaworthiness. Seas Shipping Co. v. Sieracki, 328 U.S. 85, 66 S.Ct. 872, 90 L.Ed. 1099; Pope & Talbot, Inc. v. Hawn, 346 U.S. 406, 74 S.Ct. 202, 98 L.Ed. 143; Alaska Steamship Co., Inc., v. Petterson, 347 U.S. 396, 74 S.Ct. 601, 98 L.Ed. 798. This obligation required only that the vessel and its equipment “be reasonably fit for the use for which it was intended”. Berti v. Compagnie De Navigation Cyprien Fabre, 2 Cir., 213 F.2d 397, 400.

The Topping-Lift

The topping-lift which supported the boom before it fell had been installed in its position at the time the vessel was originally rigged in May or June, 1952. There was much evidence about the topping-lift which parted.1 I find that [396]*396it was rigged in a double-purchase and consisted,of 6 x 24 mild plow steel wire rope 2" in circumference. Since she had been launched and placed in commission, the vessel had been plying between different ports in the Carribean area and her loading and unloading gear at hatch No. 1 had been in frequent use, handling a variety of cargo loads. The so-called “safe working load” of the boom and of the cargo runner (the latter measuring 2yz" in circumference) was, according to the stipulation of the parties, three tons each.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Missouri v. Jenkins
515 U.S. 70 (Supreme Court, 1995)
McKnight v. NM Paterson & Sons, Limited
181 F. Supp. 434 (N.D. Ohio, 1960)
Crumady v. Joachim Hendrik Fisser
176 F. Supp. 595 (D. New Jersey, 1959)
Merriweather v. Boland & Cornelius
160 N.E.2d 717 (New York Court of Appeals, 1959)
Crumady v. the Joachim Hendrik Fisser
358 U.S. 423 (Supreme Court, 1959)
Di Salvo v. Cunard Steamship Co.
171 F. Supp. 813 (S.D. New York, 1959)
Considine v. Black Diamond Steamship Corp.
163 F. Supp. 109 (D. Massachusetts, 1958)
Crumady v. Fisser
249 F.2d 818 (Third Circuit, 1957)
Crumady v. The Joachim Hendrik Fisser
249 F.2d 818 (Third Circuit, 1957)

Cite This Page — Counsel Stack

Bluebook (online)
142 F. Supp. 389, 1956 U.S. Dist. LEXIS 3122, Counsel Stack Legal Research, https://law.counselstack.com/opinion/crumady-v-the-joachim-hendrik-fisser-njd-1956.