HUNT, Circuit Judge.

Under oral chartér Crowley Launch & Tugboat Company furnished to the appellee Shipping Board Corporation a large, flat-framed lighter, Crowley No. 76, for discharging 400 tons of sand ballast from the bark Monongahela in San Francisco Bay. The lighter was made fast to the bark by the employes of the appellant. About the time the barge was fully loaded, she capsized and was lost, and the contention of the appellant is that the loss wás due to negligence on the part of the Fleet Corporation in improperly loading and overloading her. The Fleet Corporation denies negligence, and avers that the barge was old and unfit for the service for which she was chartered, and that the loss was due to perils necessarily incident to the service. The lower court found that the evidence did not establish the fact that more sand was loaded on the barge than she was chartered to -carry, or that the barge was improperly loaded, and therefore dismissed the libel. Libelant appealed.

There is no dispute as to the general method followed in loading the barge. Stevedores in the hold of the vessel filled buckets attached to a donkey engine, and the engine hoisted the buckets up and dumped them on to the barge. The barge was loaded in four cones or piles, the first cone a little forward of the center. Loading in cones is a very common method, and it satisfactorily appears that those in charge of the loading were experienced in their work. There was a 'conflict in the evidence as to the number of tons loaded on the barge, but the conflict arises principally by reason of the differing assumptions of fact. Appellant’s theory that the barge was overloaded is based upon the number of buckets dumped, which, when multiplied b’y a specified number of pounds to the bucket, gives a total of over 600 short tons. Naturally, if it were established that the buckets were full, it would be proof of heavy overloading, and appellant should prevail. But the formula adopted is not in accord with the more persuasive evidence. For instance, a witness of long experience, who watched the discharge of the ballast at frequent intervals, testified that, although the buckets were well filled when the dumping first commenced, afterwards, as the sand was taken from the wings and back in the hatch of the Monongahela, many were only half full.

In searching for aid to a right conclusion, we find that the superintendent of the stevedoring company testified that during the loading he was on the dock and on the ship very often, and was obliged to “keep after” the men all the time because they did not fill the buckets. In itself this evidence might be none too reliable; but, when considered with other evidence, it harmonizes with it. Thus the master of the Monongahela testified that, as shown by hills offered, 800 metric tons of sand ballast was paid for' and taken aboard at Manila, and that he desired to keep a little more than 400 tons on the ship, and that he so instructed the operators at San Francisco. There is also the testimony of the marine surveyor, who was employed in the discharge of the ballast. whose report shows the draft at each end of the ship, and who [19] testified that his instructions were that not less than 400 tons should be left on board, and that he gave such instructions to the persons engaged in unloading; that toward the close of the discharge, with others, he calculated the ballast left, using the displacement scale on the ship, and that he found 425 long tons were left on hoard. ■ The surveyor found the mean draft to be 10 feet 2 inches,-11 feet 8 inches aft, 8 feet 8 inches forward, and, allowing 50 tons for stores and dunnage, he estimated accordingly. At a later time the witness modified his evidence, and gave 525 tons as the correct figure.

A vigorous attack is made upon these calculations, and especially upon the possible error in accepting the displacement scale on the ship. But other marine surveyors placed the dead weight capacity of the ship as 525 tons, where the mean draft was 10 feet 2 inches, and put 50 tons as proper for supplies, stores, and dunnage. There was no valid reason to reject the displacement scale upon which the ship was sent to sea. It may have been placed long before the time of the events now under investigation, but it was none the less proper to permit the witnesses to use it in their calculations, and the District Court was right in so ruling.'

We must therefore sustain the view that the quantity of sand put into the barge was less than 400 tons. The sand was piled in the lighter in cones, and when the loading was practically completed there were four large cones and one small one. To obtain even distribution, the barge was shifted from time to time. During the first three of the-four days occupied in loading, representatives of the Crowley Company observed the method used, but expressed no disapproval. Men of experience testified that the method of loading in cones, starting in the center, was proper, and, although the Crowley Company introduced some evidence to the effect that flat loading was the more approved way, the general superintendent of the appellant company said that the proper way is to build cones of reasonable height (5 or 6 feet) and “carry it right along and work back again; then you keep your barge in trim and there is no danger.”

Appellant also argues that the cones were from 16 to 18 feet in height and were dangerous to the safety of the barge. But the evidence does not warrant such a conclusion, and evidently the representative of the Crowley Company did not disapprove of the method, for he was on the barge on the two days preceding the day of the accident, found her in good condition, and made no comment or suggestion to those in charge of loading. We gather from the testimony that, at about 3:30 in the afternoon of the day the barge was lost, she was level, but that very soon thereafter she leaked and began to list. Mr. Crowley, of the Crowley Company, was on shore and about 4 o’clock happened to observe that the barge was listed, whereupon he made every effort to obtain a centrifugal pump as the best way to relieve the situation; but before the pump could be made effective the barge tilted outward and appeared to buckle, then turned bottom side up- and was lost.

Free access — add to your briefcase to read the full text and ask questions with AI

Crowley Launch & Tugboat Co. v. United States Shipping Bord Emergency Fleet Corp., 282 F. 17, 1922 U.S. App. LEXIS 2580 (9th Cir. 1922).

282 F. 17 (Crowley Launch & Tugboat Co. v. United States Shipping Bord Emergency Fleet Corp.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Delaware Dredging Co. v. Graham
43 F.2d 852 (E.D. Pennsylvania, 1930)
Fulton Lighterage Co. v. New York Central Railroad
136 Misc. 374 (City of New York Municipal Court, 1930)
S. C. Loveland Co. v. Bethlehem Steel Co.
33 F.2d 655 (Third Circuit, 1929)
Rogers v. Moran Towing & Transportation Co.
20 F.2d 558 (Second Circuit, 1927)